Professional Documents
Culture Documents
00 (HFC-227ea)
UL: EX4623 / Component of FM Approved System
System calculated within limits of Fike's UL listing and FM approval.
SAUDI FACTORY FOR FIRE EQUIPMENT CO
P.O BOX 7162, DAMMAM 31462
Email: dammam@sffeco.com.sa
Phone: Tel: +96638351961, Fax: +96638351968
File Name: 02-CONTROL ROOM(PORTABLE PS SOUTH)_R1.FC4
Consolidated Report
Customer Information
Company Name: CHINA RAILWAY CONSTRUCTION COMPANY
Address: KINGDOM OF SAUDI ARABIA
Phone:
Contact:
Title:
Project Data
Project Name: KING SALMAN ENERGY PARK / ARAMCO
Designer: HARIS BILAL
Number: 9164
Account:
Location: POTABLE PS - SOUTH (ABQAIQ)
Description: FIXED FIKE TOTAL FLOODING GASEOUS EXTINGUISHING
SYSTEM IN CONTROL ROOM
Designer Notes
REV-00
Enclosure Report
Page: 1 of 7
Consolidated Report
Enclosure 1 ROOM VOID
Enclosure Temperature: Number of Nozzles: 1
Minimum: 21.0 C Width: 2.75 m
Maximum: 54.0 C Length: 3.75 m
Max. Concentration: 0.00 % Height: 4.35 m
Design Concentration: Volume: 44.86 m ³
Adjusted: 7.11 % Non-permeable: 0.00 m ³
Minimum: 7.00 % Total Volume: 44.86 m ³
Min. Agent Required: 24.58 kg
Adjusted Agent Required: 25.00 kg
2.5
Legend
E1-Pos (+)
E1-Neg (-)
2
Equivalent Leakage Area (in^2)
1.5
0.5
0
0 2 4 6 8 10 12 14
Enclosure Pressure (psf)
Page: 2 of 7
Consolidated Report
Agent Source Report
Page: 3 of 7
Consolidated Report
Parts Report
Pipe &
Fittings Type Diameter Length Elbows (90) Elbows (45) Tees Unions
40T 25 mm 7.65 m 4 0 3 0
Other
Objects Name Quantity Part Number
End Cap 2 N/A
Enclosure Number: 1
Enclosure Name: ROOM VOID
Minimum Design Concentration: 7.00%
Adjusted Design Concentration: 7.11%
Predicted Concentration: 7.11%
Maximum Expected Agent Concentration: 7.90% (At 54.0 C)
Page: 4 of 7
Consolidated Report
Page: 5 of 7
Consolidated Report