KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
Reference (Date/PTW) /
SL Preventive Maintenance Scheduled Jobs Week-1 Status
Remarks
1 HRSG-2 Swas Cooler NOT DONE Plant in running condition
2 STG Control Oil Pump-1 NOT DONE Plant in running condition
3 DM Jockey Pump-1 NOT DONE Plant in running condition
4 DM Jockey Pump-2 NOT DONE Plant in running condition
5 DM Fire Fighting Pump-1 (Motor Operated) NOT DONE Plant in running condition
6 DM Fire Fighting Pump-2 (Motor Operated) NOT DONE Plant in running condition
7 DM Caustic Dosing Pump (UFBW) NOT DONE Plant in running condition
8 DM Hypo(NaOCL) Dosing Pump-1(UFBW) NOT DONE Plant in running condition
9 DM Hypo(NaOCL) Dosing Pump-1(UFFEED) NOT DONE Plant in running condition
10 DM Acid (HCL) Dosing Pump-1 (UFBW) NOT DONE Plant in running condition
11 DM Ammonia Dosing Pump-1 NOT DONE Plant in running condition
12 DM Ammonia Dosing Pump-2 NOT DONE Plant in running condition
13 ACC Fin’s Cleaning System of All Units NOT DONE Plant in running condition
Reference (Date/PTW) /
SL Preventive Maintenance Scheduled Jobs Week-2 Status
Remarks
1 HRSG-2 HP Dosing Pump-1 & Agitator NOT DONE Plant in running condition
2 HRSG-2 IP Dosing Pump-1 & Agitator NOT DONE Plant in running condition
3 HRSG-2 LP Dosing Pump-1 & Agitator NOT DONE Plant in running condition
4 STG Control Oil Pump-2 NOT DONE Plant in running condition
5 Fire Fighting Pump. (Diesel Operated) NOT DONE Plant in running condition
6 DM Caustic Dosing Pump-2 (UFBW) NOT DONE Plant in running condition
7 DM Hypo(NaOCL) Dosing Pump-2(UFBW) NOT DONE Plant in running condition
8 DM Hypo(NaOCL) Dosing Pump-2(UFFEED) NOT DONE Plant in running condition
9 DM Acid (HCL) Dosing Pump-2 (UFBW) NOT DONE Plant in running condition
Reference (Date/PTW) /
SL Preventive Maintenance Scheduled Jobs Week-3 Status
Remarks
1 HRSG-2 HP Phosphorus Dosing Pump-2 NOT DONE Plant in running condition
2 HRSG-2 IP Dosing Pump-2 NOT DONE Plant in running condition
3 HRSG-2 LP Dosing Pump-2 NOT DONE Plant in running condition
4 ETP ESTP - 8 NOT DONE Plant in running condition
5 ETP ESTP -11 NOT DONE Plant in running condition
6 DM Antiscalent Dosing Pump-1 NOT DONE Plant in running condition
7 DM Antiscalent Dosing Pump-2 NOT DONE Plant in running condition
8 DM SMBS Dosing Pump-1 NOT DONE Plant in running condition
9 DM SMBS Dosing Pump-2 NOT DONE Plant in running condition
10 DM Raw Water Transfer Pump-1 NOT DONE Plant in running condition
11 Diesel GEN SET (625 KVA) DONE 20/05/2023-411903
12 Diesel Engine-125KVA(Engine Driven Fire Fighting Pump) DONE 20/05/2023-411904
Reference (Date/PTW) /
SL Preventive Maintenance Scheduled Jobs Week-4 Status
Remarks
1 DM MB Air Blower-2 NOT DONE Plant in running condition
2 DM N-Pit Water Transfer Pump-1 NOT DONE Plant in running condition
3 DM Raw Water Transfer Pump-2 NOT DONE Plant in running condition
4 DM Service Water pump-1 NOT DONE Plant in running condition
5 DM Service Water pump-2 NOT DONE Plant in running condition
6 DM Water Transfer Pump-1 NOT DONE Plant in running condition
7 DM Water Transfer Pump-2 NOT DONE Plant in running condition
8 DM HRSG Filling Pump NOT DONE Plant in running condition
9 DM MB Air Blower-1 DONE 20/05/2023-411897
PM Scheduled for the Current Month 43
PM Completed during Current month 03
Achieved Scheduled Preventive Maintenance 6.97%
Rev-1
GAMA INFRAPROP PVT. LTD. KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
Reference (Date/PTW) /
SL Preventive Maintenance (Backlog) As shut down Opportunity Status
Remarks
7 BOP 30 29 0 29 0 0 1 97%
8 IAC 3 3 0 3 0 0 0 100%
TOTAL 167 146 2 144 2 0 21 87%
LLF Carried as per daily schedule and any defects raised were arrested as per notification created.
1280 1280
(Days-20 * Equipment-64)
Rev-1
GAMA INFRAPROP PVT. LTD. KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
4 GT-2 Lube oil compartment oil cleaning work DONE 01/05/2023 - 411758
5 UF Hypo dosing pump-2 discharge hose leakage arresting work DONE 01/05/2023 - 411759
10 EDG Door (towards diesel level gauge)broken hinges replacement DONE 02/05/2023 - 411768
14 ACC Fan-5 oil replacement and fogging nozzle inspection DONE 04/05/2023 - 411781
15 STG CT Fan-1 oil leakage from gear box - inspection DONE 04/05/2023 - 411777
16 STG Lube oil filter-A vent line leakage arresting DONE 04/05/2023 - 411778
17 ACC Fin fan & fogging pump starter panel canopy installation DONE 04/05/2023 - 2940-H
20 ACC Water sprinkler line nozzle support installation DONE 05/05/2023 - 2942-H
21 GT#2 BT Fan #1 damper not getting fully closed, inspection DONE 05/05/2023 - 411791
22 GT#2 BL Fan #2 damper not fully opening, inspection DONE 05/05/2023 - 411792
24 STG Lube oil cooler-A MIV vent leakage arresting DONE 06/05/2023 - 411800
25 GT-2 BL fan-2 damper not closing fully - maintenance work DONE 06/05/2023 - 411801
DM Plant RO cleaning pump hose connection & removal for RO chemical
26 DONE 06/05/2023 - 411794
cleaning
27 Material Unloading at STG building 0-mtr with EOT Crane DONE 06/05/2023 - 411805
30 ACC Duct Cooling line fabrication and erection DONE 05/09/2023 - 2945-H
Rev-1
GAMA INFRAPROP PVT. LTD. KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
35 DM Plant UF Hypo Dosing Pump-2 discharge hose leakage DONE 11/05/2023 - 411830
38 DM Plant UF Hypo Dosing-1 Discharge line replacement work DONE 12/05/2023 - 411834
40 STG Aux header bypass MIV gland leakage arresting near PCV B102 DONE 12/05/2023 - 411836
41 GT#1 VL FAN #2 vibration high ,all bolts tightening work DONE 12/05/2023 - 411838
43 CEP-1,2,3 EDG & Fire water Pumps CBM Checks DONE 13/05/2023 - 411842
47 GT-2 ELC machine suction hose connection work DONE 13/05/2023 - 411848
48 Raw Water tank-2 make up MIV not working properly DONE 13/05/2023 - 411849
53 Trench Cover fixing after laying of sensor cable in SWAS-1 DONE 16/05/2023 - 2952-H
Leadership safety walk point no 1.7 closure
54 ( 1.7- Unwanted cable tray found between walkway at HRSG#2 below DONE 16/05/2023 - 2951-H
drum floor towards ACC.)
55 GT-1 PHE-A Oil leakage from flange - tightening work DONE 16/05/2023 - 411867
56 ACC Fan-8 open area covering with aluminium tape DONE 16/05/2023 - 411868
HRSG-2 rectification of leadership safety walk point 1.4 and 1.5 (IMD
57 DONE 16/05/2023 - 2953-H
Support)
58 DM Plant N-Pit Pump not taking suction DONE 16/05/2023 - 411869
61 GT-2 & STG Lube oil sample collection for Analysis by M/s ACME DONE 17/05/2023 - 411875
63 GT-1 Series-1 and All fin fan CBM Checks DONE 17/05/2023 - 411871
64 ACC Fan no-12 fogging nozzle inspection and cleaning DONE 17/05/2023 - 411879
66 STG Building washroom exhaust fan mesh replacement work DONE 17/05/2023 - NA
Rev-1
GAMA INFRAPROP PVT. LTD. KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
68 Fire Hydrant post seat replacement near switchyard DONE 17/05/2023 - 411881
75 HRSG-2 BFP-A&B and MB Feed Pump-2 oil cup level low - oil top up work DONE 19/05/2023 - 411894
82 ACC Fan-7, Lube oil level low - top up work DONE 22/05/2023 - 411915
84 Material lifting & shifting from steag contrainer to store DONE 23/05/2023 - 411926
87 STG service ejector #A safety valve inspection (ACC side) DONE 24/05/2023 - 411939
Rev-1
GAMA INFRAPROP PVT. LTD. KASHIPUR
225 MW Combined Cycle Power Plant
QUALITY OBJECTIVE OF MMD – MAY-2023
SESI/GIPL/MMD/
Issue No. Issue Date Revision Revision Date Clause Page 1 of 3
QOMMR/01
01 09.12.2016 02 01/04/2021
IP MS Drain, IP MS safety valve leakage from flange and HP Drum leakage 29/05/2023 - 411973
101 DONE
from CCR side manhole.
30/05/2023 - 411978
102 ACC Fan No 3 Blade angle adjustment DONE
30/05/2023 - 2962 H
103 STG CT Fan area Platform erection for H2SO4 dosing DONE
GT#2 DLN Compartment disengaging door(facing towards primary gas 30/05/2023 - 411986
104 DONE
skid ) rectification.
30/05/2023 - 411985
105 STG ACW Pump A & B gland tightening. DONE
30/05/2023 - 411987
106 STG filteration machine pre filter top flange oil leakage DONE
ACC Fan 1 to 14 Silica gel inspection and replacement if required. 31/05/2023 - 411993
107 DONE
Fire fighting header recirculation line erection.
108 DONE 31/05/2023 - 2962H
ACC Fan 's Side walls opening sealing work UNDER
109 PROGRESS 31/05/2023-411979
Notifications / Corrective Maintenance for the Current Month 109
Notifications / Corrective Maintenance completed during Current month 108
Achieved Notifications / Corrective Maintenance 99.08%
Total Generated during Current Month (PM’s, PDM, LLF, UN Schedule Plan & Notifications) 1600
Total Completed during Current Month (PM’s, PDM, LLF, UN Schedule Plan & Notifications) 1538
Achieved (PM’s, PDM, LLF, UN Schedule Plan & Notifications) 96.12%
Rev-1