You are on page 1of 2

Strageic Cities Development Project

REHABILITATION AND IMPROVEMENTS TO JAFFNA PONNALAI


POINT PEDRO ROAD (AB-21)
FROM CH 1+830 TO CH 14+600
CONTRACT NO: SCDP/WB/JF/WK/07
CONSULTANT CONTRACTOR CLIENT

Ministry of Urban Development,


PACE-MHEC JV Sierra Construction Limited
Water Supply and Housing Facilities

AGGREGATE IMPACT VALUE


Test Method: BS 812:112-1990

Lab Sample No Si/JPPR/FR/ABC/01 Sample Location 06+060 RHS (SP-01)

Date of Sampling 5/22/2020 Source WKK Metal crusher

Date of Testing 5/30/2020 Type of Material ABC

Condition of Test Dry Soaked

Test No
S. No Data
1 2 3
1 Weight of Aggregate in Cup W1 344.0 345.0 348.0
2 Weight of Aggregate passing 2.36mm Sieve W2 91.0 89.0 92.0
Weight of Crushed Aggregate Retained on
3 W3 253.0 256.0 256.0
2.36mm Sieve
4 Aggregate Impact Value (AIV) ( W2 x 100 ) / W1 26.5 25.8 26.4
5 Average Aggregate Impact Value (AIV) 26.2

Specification Requirements ;

* Sample passing 14mm and retained on 10mm Sieves.


* Specification limit ≤ 30

Remarks ;

Name Designation Signature Date


Tested By S.Asan MT (Sierra)

Checked By M.Ashockline ME (Sierra)

Approved By S.Vagulan QAM (Sierra)

Witnessed By B.Sasiharan MT (Consultant)


Reviewed By K.Thivakaran ME (Consultant)