The document provides photos and details from a civil works activity inspection of pouring concrete beams for Board Machine 1 at a project site. Photos show the concrete beam formwork, rebar reinforcement spaced at 100mm, pouring of the concrete using a concrete pump, and vibrating and finishing the poured concrete beams.
The document provides photos and details from a civil works activity inspection of pouring concrete beams for Board Machine 1 at a project site. Photos show the concrete beam formwork, rebar reinforcement spaced at 100mm, pouring of the concrete using a concrete pump, and vibrating and finishing the poured concrete beams.
The document provides photos and details from a civil works activity inspection of pouring concrete beams for Board Machine 1 at a project site. Photos show the concrete beam formwork, rebar reinforcement spaced at 100mm, pouring of the concrete using a concrete pump, and vibrating and finishing the poured concrete beams.
CONTRACTOR PT. MSM PROJECT NAME BOARD MACHINE 1 (BM1) DATE 13 June 2023 AFI NUMBER RAPI-MSM-AFI-CVL-BM1 GRID / AXIS 28'-29/L-M AREA / REFERENCE Documentation Pouring Concrete Beam CIS OFFICE