You are on page 1of 7

Nama : Keny Maikel Giyai

Nim : 2020061024004

UTS : Optimasi Sistem Tenaga Listrik

Power Flow Solution by Newton-Raphson Method

Maximum Power Mismatch = 1.79641e-005

No. of Iterations = 3

Bus Voltage Angle ------Load------ ---Generation--- Injected

No. Mag. Degree MW Mvar MW Mvar Mvar

1 1.030 0.000 0.000 0.000 150.433 9.887 0.000

2 1.040 -2.301 20.000 10.000 80.000 202.151 0.000

3 1.019 -3.082 25.000 15.000 0.000 0.000 1.000

4 1.004 -3.759 10.000 5.000 0.000 0.000 3.000

5 0.988 -4.141 40.000 20.000 0.000 0.000 0.000

6 0.991 -3.376 60.000 40.000 0.000 0.000 0.000

7 1.010 -1.637 10.000 5.000 120.000 33.467 0.000

8 1.001 -1.289 80.000 60.000 0.000 0.000 0.000

9 1.004 -3.100 100.000 80.000 0.000 0.000 0.000

Total 345.000 235.000 350.433 245.505 4.000

B=

0.0108 0.0011 -0.0006

0.0011 0.0308 -0.0010

-0.0006 -0.0010 0.007


B0 =

1.0e-003 *

0.0143 0.2625 0.0096

B00 =

1.4232e-006

Total system loss = 5.41477 MW

Total generation cost = 3326.769368550 $/h

Incremental cost of delivered power (system lambda) = 8.585979 $/MWh

Optimal Dispatch of Generation:

93.4509

161.2246

100.0000

Absolute value of the slack bus real power mismatch, dpslack = 0.5698 pu

B=

0.0120 0.0013 -0.0007

0.0013 0.0092 -0.0009

-0.0007 -0.0009 0.0082


B0 =

1.0e-003 *

0.0662 0.1113 0.0120

B00 =

1.4243e-006

Total system loss = 4.12665 MW

Incremental cost of delivered power (system lambda) = 8.164874 $/MWh

Optimal Dispatch of Generation:

71.9980

179.3813

97.9426

Absolute value of the slack bus real power mismatch, dpslack = 0.1592 pu

B=

0.0133 0.0014 -0.0007

0.0014 0.0080 -0.0008

-0.0007 -0.0008 0.0082


B0 =

1.0e-004 *

0.9491 0.9575 0.1204

B00 =

1.4247e-006

Total system loss = 4.02054 MW

Incremental cost of delivered power (system lambda) = 8.152344 $/MWh

Optimal Dispatch of Generation

70.4917

181.3638

97.1862

Absolute value of the slack bus real power mismatch, dpslack = 0.0122 pu

B=

0.0135 0.0014 -0.0007

0.0014 0.0078 -0.0008

-0.0007 -0.0008 0.0082


B0 =

1.0e-004 *

0.9761 0.9427 0.1219

B00 =

1.4247e-006

Total system loss = 4.01647 MW

Incremental cost of delivered power (system lambda) = 8.151350 $/MWh

Optimal Dispatch of Generation:

70.3503

181.5573

97.1107

Absolute value of the slack bus real power mismatch, dpslack = 0.0013 pu

B=

0.0135 0.0014 -0.0007

0.0014 0.0078 -0.0008

-0.0007 -0.0008 0.0082


B0 =

1.0e-004 *

0.9788 0.9413 0.1220

B00 =

1.4247e-006

Total system loss = 4.01613 MW

Incremental cost of delivered power (system lambda) = 8.151257 $/MWh

Optimal Dispatch of Generation:

70.3366

181.5760

97.1034
Absolute value of the slack bus real power mismatch, dpslack = 0.0002 pu

Power Flow Solution by Newton-Raphson Method

Maximum Power Mismatch = 1.55071e-008

No. of Iterations = 2

Bus Voltage Angle ------Load------ ---Generation--- Injected

No. Mag. Degree MW Mvar MW Mvar Mvar

1 1.030 0.000 0.000 0.000 70.360 35.459 0.000

2 1.040 -0.142 20.000 10.000 181.557 169.819 0.000

3 1.019 -1.066 25.000 15.000 0.000 0.000 1.000

4 1.004 -1.937 10.000 5.000 0.000 0.000 3.000

5 0.988 -2.554 40.000 20.000 0.000 0.000 0.000

6 0.992 -2.046 60.000 40.000 0.000 0.000 0.000

7 1.010 -0.738 10.000 5.000 97.111 36.642 0.000

8 1.001 -1.006 80.000 60.000 0.000 0.000 0.000

9 1.005 -1.426 100.000 80.000 0.000 0.000 0.000

Total 345.000 235.000 349.028 241.919 4.000

Total generation cost = 3194.848291162 $/h

You might also like