R I S K A S S E S S M E N T

SITE: LOCATION:
UNITS INVOLVED:
DESCRIPTION OF TASK:

1. HYDROTESTING ACTIVITY MAXIMUM TEST PRESSURE – 140 BAR


R I S K A S S E S S M E N T

ACTIVITY / CONDITION (S) THAT HAZARD PROBA- SAFE GUARDS NEEDED TO CONTROL RISK RISK RESPONSIBLE
ITEM RISK
HAZARD DEVELOP THE HAZARD EFFECT BILITY TO ACCEPTABLE LEVEL ALARP PERSON

1. ACTIVITY : HYDRO TEST PREPARATORY ACTIVITY


1.1 Injury to personnel / Loose fittings H L M - System to be flushed prior to hydrotest. L Hydro test Supvr.
damage to asset
- Only hydro testing personnel will be allowed in the
vicinity of the hydro testing area. Other crew will stay L Hydro test Supvr.
at a distance from the testing area. Unnecessary
personnel to clear the platform.
- Correct tools will be used to tighten the bolts/ Hydro test Supvr..
fittings.
- A dedicated Hydro test supervisor will be assigned Hydro test Supvr
to supervise the testing.

Wrong test pressure, Over test H L M - Test Pack to be prepared, checked and approved by L FE – NPCC / ABB
pressure system, Test system NPCC/ABB/ADMA
below pressure.
Incorrect injection point. Over - Test Pack to be prepared, checked and approved by L FE – NPCC / ABB
pressurise system. Failure to NPCC/ABB/ADMA
pressurise system.
Incorrect depressurisation H L M - Test Pack to be prepared, checked and approved L FE – NPCC / ABB
routes. System not fully de- by NPCC/ABB/ADMA
pressurised.
Rupture of high pressure hose, H L M - ABK work permits to be in force. L Hydro test Supvr..
fittings
- Prior to start pressure test all hoses / fittings to be L Hydro test Supvr
checked. A checklist to be prepared by Hydro test
supervisor and implemented by test technician and
to be included in the work permit.

- Testing crew to be liaised with radio room of the L Hydro test Supvr.
barge during pressurisation. PA will be announced
before the hydro testing start and after the
completing the testing.

- All gauges to be calibrated. All fittings should not be L Hydro test Supvr
under rated to the pressure required. All equipment
to be used will be certified by the 3rd parties.

- Whip checks shall be installed on all hoses L Hydro test Supvr


connections.
R I S K A S S E S S M E N T

ACTIVITY / CONDITION (S) THAT HAZARD PROBA- SAFE GUARDS NEEDED TO CONTROL RISK RISK RESPONSIBLE
ITEM RISK
HAZARD DEVELOP THE HAZARD EFFECT BILITY TO ACCEPTABLE LEVEL ALARP PERSON

- All hoses to have burst pressure higher than the test L Hydro test Supvr
pressure.

- In case of leak, pressure will be released before re- L Hydro test Supvr
tightening of the bolts

- Physical checks to all fittings and hoses will be Hydro test Supvr
conducted by hydro test supervisor prior to install L
the fittings.

- Radio will be available to hydro testing supervisor L Hydro test Supvr


for communication.

- A TOOLBOX TALK for all personnel needs to be L Hydro test Supvr


carried-out by SUPERVISOR to brief the work force
on location prior to start work.

2. ACTIVITY : RIG UP OF EQUIPMENT

Injury to personnel / Manual Handling H L M - Team trained in manual handling techniques. Only L Hydro test Supvr
damage to asset certified lifting equipment to be used
Rig up to wrong system, over H L M - Injection point identified in procedure. Pre- test L NPCC / ABB
pressure system safety check by NPCC AND ABB.
Hoses causing obstruction / M L M - Hoses route to be checked by NPCC Supervisor L NPCC
tripping hazard before rig up.
3 ACTIVITY: TAPING OF JOINTS TO BE TESTED.

3.1 Injury to personnel by Poor / incorrect access H L M - Access to all flanges by platform or authorized L NPCC
falling scaffold only
3.2 Missed system joints. Wrong rev P & ID's. Incorrect H L M - Test Pressure to be prepared, checked and L NPCC/ABB
procedure. Poor lighting. approved by NPCC/ABB/ADMA.
- Ensure work area has good lighting.

4 ACTIVITY: ALIGNMENT OF SYSTEM VALVES AND ISOLATIONS

4.1 System incorrectly System not checked correctly, M L M - Insulation checklist checked and signed by NPCC L NPCC / ABB
isolated. Over damage valves. supervisor. Double block and bleed where possible.
pressure adjacent Secondary vent paths identified and aligned.
system
R I S K A S S E S S M E N T

ACTIVITY / CONDITION (S) THAT HAZARD PROBA- SAFE GUARDS NEEDED TO CONTROL RISK RISK RESPONSIBLE
ITEM RISK
HAZARD DEVELOP THE HAZARD EFFECT BILITY TO ACCEPTABLE LEVEL ALARP PERSON

4.2 System internal System not checked correctly, H L M - Valve checklist checked and signed by NPCC L NPCC / ABB
valves closed, system damaged valves. Pressure relief supervisor. System walked and alignment checked
not fully pressurised, settings incorrectly set. by NPCC Supervisor.
over pressure system.
5 ACTIVITY : ERECT WARNING SIGNS AND BARRIERS

Injury to personnel / Access routes left open. H L M - Area barriers agreed with Hook - up superintendent. L NPCC / ABB
damage to asset Unauthorized access to system Barriers checked by NPCC and enforced by NPCC
under pressure watchers. Pre-test check signed by NPCC. Work on
test controlled by TABK. Authorised personnel only.
6 ACTIVITY: CLEAR UNAUTHORIZED PERSONNEL

Injury to personnel Unauthorized access to system H L M - Area checked prior to testing. PA announcement L NPCC
interference with system under before testing. Inform TABK complex.
pressure.