S.no Hazard Risk Who is at Risk Risk Rating Necessary Control Measure Action Residual Risk
by Rating
S L Rating S L Rating
Painting of Concrete Barrier
1. Paint Product (eg. Skin irritation, Site workers, 3 2 6 Appropriate PPE e.g. Safety goggles, Project 1 2 2
Paint varnish, Respiratory problem Site staff, impervious gloves and overalls are provided Manager
mixed etc.) (eye, skin) Site visitors to reduce risk of contact with eyes/skin as
identified.
Site Supervisor is competent in safe and
correct handling, storage, use and disposal
of chemicals products;
Work in ventilated place;
Water based paints are used where
possible;
Appropriate PPE e.g. Safety goggles,
impervious gloves and overalls are provided
to reduce risk of contact with eyes/skin as
identified.
Eating, drinking and smoking are prohibited
during the course of the task;
Strict personal hygiene is observed by the
Project ILMI, Early Works Mohamed Bin Salman Nonprofit City (The