Project ILMI, Early Works Mohamed Bin Salman Nonprofit City (The

Nonprofit City), Riyadh, KSA

Project No. P-0001-PH01-D01-01A001-MSK-ITT-PRO-000002

Description
Risk Assessment
Supervision Consultant:

Risk Assessment
Risk Assessment Risk Assessment
Title
Revision
S.no Hazard Risk Who is at Risk Risk Rating Necessary Control Measure Action Residual Risk
by Rating
S L Rating S L Rating
Painting of Concrete Barrier
1. Paint Product (eg. Skin irritation, Site workers, 3 2 6  Appropriate PPE e.g. Safety goggles, Project 1 2 2
Paint varnish, Respiratory problem Site staff, impervious gloves and overalls are provided Manager
mixed etc.) (eye, skin) Site visitors to reduce risk of contact with eyes/skin as
identified.
 Site Supervisor is competent in safe and
correct handling, storage, use and disposal
of chemicals products;
 Work in ventilated place;
 Water based paints are used where
possible;
 Appropriate PPE e.g. Safety goggles,
impervious gloves and overalls are provided
to reduce risk of contact with eyes/skin as
identified.
 Eating, drinking and smoking are prohibited
during the course of the task;
 Strict personal hygiene is observed by the
Project ILMI, Early Works Mohamed Bin Salman Nonprofit City (The
Nonprofit City), Riyadh, KSA

Project No. P-0001-PH01-D01-01A001-MSK-ITT-PRO-000002

Description
Risk Assessment
Supervision Consultant:

site supervisor and hands are washed


thoroughly after the task;
 All equipment used with chemicals /
cleaning products is cleaned and checked
before returning to store;
 The Site Supervisor is aware of where and
how to obtain First Aid treatment
2. Slip & trip Musculoskeletal site workers, 4 2 8  Site Supervisor ensures good housekeeping Project 2 1 2
injuries, bruising, site staff, at all times; Manager
fractures Site visitors  Site Supervisor ensures there is plenty of
space;
 Site Supervisor disposes of excess
trimmings carefully and does not allow a
buildup of pasted off cuts in work area.
 Additional rolls of paper are secured safely
when not in use;
 Spilled paint and liquids are cleaned up
immediately
3. Manual Handling Musculoskeletal Site workers 4 3 12  Site workers trained in safe lifting and Project 2 1 2
injuries, bruising, handling techniques e.g. Manual Handling Manager
fractures e-learning module or equivalent;
 Site Supervisor is advised to minimize
repetitive movements where ever possible
and ensure they take regular breaks.
4. Dust/fumes – Skin irritation, Site workers, 2 3 6  Eating, drinking and smoking are prohibited Project 1 1 1
rubbing Respiratory problem General site staff, during the course of the task; Manager
down/stripping & (eye, skin) Site visitors  Respiratory Protective Equipment provided
preparing surfaces with suitable filters for dust.
 Safety goggles are provided to reduce risk
of contact with eyes;
Project ILMI, Early Works Mohamed Bin Salman Nonprofit City (The
Nonprofit City), Riyadh, KSA

Project No. P-0001-PH01-D01-01A001-MSK-ITT-PRO-000002

Description
Risk Assessment
Supervision Consultant:

 Dust is dampened down before sweeping


up;
 The site supervisor is aware of where and
how to obtain First Aid treatment
5. Use of equipments Traps, lacerations, Site Workers 3 2 6  Workers are competent to use the Project
(Brushes, sand bruising equipment in safe and correct manner; Manager
paper etc.)  Site supervisor carries out visual inspection
before use;
 Site supervisor reports all defects and the
equipment taken out of use if faulty;
 Never leaves equipment in a position where
it could cause a hazard for other building
users;