You are on page 1of 1

KEY PLAN

1 2 3 4 5 6

NOTES

1. ALL ELECTRICAL INSTALLTION SHALL BE AS PER THE LATEST EDITION


OF LOCAL CODE.
2. THE CONTRACTOR SHALL COORDINATE FINAL LIGHTING FIXTURE
LOCATIONS WITH WALL PARPET AND OTHER DISIPLINE COMPONENT
3. ALL WIRING SHALL BE PVC CONDUIT EMBEDDED IN WALLS
4. CONDUITS SHALL BE IN ACCORDANCE WITH INTERNATIONAL
ELECTROTECHNICAL COMMISSION (IEC).
F4 F4 5. UNLESS OTHER WISE SHOWN ON DRAWINGS, MOUNTING HEIGHTS FROM
k k
D D FINISHED FLOOR LEVEL TO CENTER OF DEVICES SHALL BE AS FOLLOW:

LIGHTING FIXTURE : 550mm


550 mm
LIGHTING SWITCHES : 1300mm
1300 mm
6. ROOF LIGHTING FIXTURE SHALL BE CONTROLLED THROUGH WEATHER
PROOF LIGHTING SWITCH AT GROUND FLOOR.

TYPE SYMBOLS DESCRIPTION

WALL MOUNTED LIGHTING LUMINAIRE WITH WATER


PROOF COVER, 20 WATT COOL WHITE LED LAMP,
F4 WITH 2800lm,
2800 lm, IP 66
66,, 230V/
230 V/50
50HZ.
HZ. ALL NECESSARY
ACCESSORIES REQUIRED FOR PROPER OPERATION
TO BE INTEGRAL PART OF FITTING.

C F4
C
F4 k
k

ROOF REFERENCE DRAWINGS


B B DRAWING TITLE DRAWING NO.

A F4 F4
DB-ADM/ 3 A 00
MAR
2023 ISSUED FOR TENDER PACKAGE M.K M.KH Y.A S.W A.M M.A
k k

TED
ED

ED
ED

D
WN

IEW
CKE

ROV
REV.NO. DATE ISSUED FOR

IGN

MIT
DRA

REV
CHE
DES

SUB

APP
DRAWING
STATUS ISSUED FOR TENDER PACKAGE
CLIENT

CONSULTANT
1 2 3 4 5 6
& PARTNERS
CONSULTING ENGINEERS

TENDER

CONSTRUCTION WORKS
FOR THE UPGRADE OF AL WAGAN STP IN AL AIN

ADMIN BUILDING
LIGHTING WORKS
ROOF FLOOR

TENDER NO. 0-15527

SHEET SIZE A1

SCALE DRAWING No. REV.

1:50 EL-ADM-04 00