Professional Documents
Culture Documents
G 2. POWER SUPPLY FROM SORECO I SHALL BE SINGLE PHASE 2- WIRES,230 VOLTZ 60 HTZ.
3. NATURE OF WORKS FOR SERVICE ENTRANCE AND LIGHTING SHALL BE DONE IN RIGID STEEL CONDUIT (RSC) WITH PROPER
SUPPORTS AND FITTINGS.
4. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR BOTH INTENDED LOCATION
AND PURPOSES.
5. MOUNTING HEIGHT SHALL BE AS FOLLOWS FROM FINISH FLOOR LINE TO THE CENTER OF DEVICES.
LIGHTING PANEL BOARD = 1500 mm
CONVENIENCE OUTLET = 300 mm
LIGHTING CONTROL SWITCH = 1480 mm
F. EXIT SIGNS / E. LIGHTS = ABOVE DOOR HEIGHT
6. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN GOOD WORKMANSHIP MANNER AND SHALL BE DONE UNDER THE
DIRECT SUPERVISION OF DULY LICENSED, REGISTERED AND COMPETENT PROFESSIONAL ELECTRICAL ENGINEER (PEE) ,
LOAD @ P1 LOAD @ P2 LOAD @ P3REE OR RME.
MAIN
ACU
ACU
ACU
MAIN
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
B.P.
C.O.
L.O.
W.P.
C.O.
W.H.
W.H.
W.H.
W.H.
MAIN
L.O.
C.O.
W.H.
W.H.
W.H.
W.H.
L.O.
E SINGLE LINE DIAGRAM E
E
E E E E
ELECTRICAL LEGEND
1
E E E
S1
S2
S3
B
E CONCRETE PEDESTAL DETAIL E LOCATION MAP
P
RA 9266 & PD 49 PROJECT TITLE: APPROVED BY: DESIGNED BY : BSJ SHEET No.