510 Summary
REPAIR ORGANIZATION/
API 510 (Authorize Inspector) And/OR ENGINEER (Pressure Vessel Engineer) AND/OR OWNER/USER (Client) AND/OR EXAMINER (WI/NDT/QUTE) AND/OR CORROSION SPECIALIST AND/OR AND/OR OTHER PERSONEL
MANUFACTURE
Assure owner -Testing,Inspection &
Overall RESPONSIBILITY for complying
Examination activities meet Code
with API 510 (See 4.1)
(See 4.2.4)
During repair and Alterations -
Evaluate and ACCEPT NDE/NDT examination Choose to conduct RBI assessments
RESPONSIBLE for Quality Control
result (See 4.2.4) (See 5.2)
(See 4.2.3)
Develop Inspection Plan for Vessel and Pressure Assure those taking thickness
Develop Inspection Plan for Vessel and
OR Relief Device measurements are trained and qualified
Pressure Relief Device (See 5.1.1.1)
(See 5.1.1.1) (See 5.5.5.4)
Review use of a component pressure test in-lieu of Determine the test pressure for non-code
Review prior vessel history prior of inspection
complete vessel hydro related pressure vessel
(See 5.4.3)
(See 5.8.1.2) (See 5.8.2.2)
Review and Approved RBI assessment Review and Approved RBI assessment that
that extend intervals beyond 10 years AND extend intervals beyond 10 years
(See 6.3.2) (See 6.3.2)
Determine the External & Internal Determine the External & Internal Inspection
Inspection Interval OR Interval
(See 6.4.1 & 6.5.1.1) (See 6.4.1 & 6.5.1.1)
Approved the use of On-Stream
Inspection in-lieu of Internal
(See 6.5.2.1)
Maintain Vessel and Relief Device
Determine the Relief Device Interval Determine the Relief Device Interval Determine the Relief Device Interval
OR Records OR
(See 6.6.2.1) (See 6.6.2.1) (See 6.6.2.1)
(See 7.8.1)
Select which Corrosion Rate (Short VS Select which Corrosion Rate (Short VS
Long) reflects the current condition AND AND Long) reflects the current condition
(See 7.1.1.2) (See 7.1.1.2)
Authorize all repair to Div.2 Vessel Authorize all repair to Div.2 Vessel
AND
(See 8.1.1) (See 8.1.1)
Approved all repair and alteration work Approved all nozzle installations (See
at HOLD POINTS (See 8.1.2.2) 8.3.1)
Allow temporary welded repair remain in Allow temporary welded repair remain in place
place past "Next opportunity" AND past "Next opportunity"
(See 8.1.5.1.1) (See 8.1.5.1.1)
Approved the use of fillet-welded patch
Approved the use of fillet-welded patch
AND repairs (See
repairs (See 8.1.5.1.2.1)
8.1.5.1.2.1)
Approved use of lap band repair Approved use of lap band repair
AND
(See 8.1.5.1.3.a) (See 8.1.5.1.3.a)
Review the repair procedures for SS Review the repair procedures for SS Cladding
AND
Cladding (See 8.1.5.4.1) (See 8.1.5.4.1)
Review the used of a local PWHT in lieu of a Maintain Record of qualified WPS's
full encirclement PWHT and WPQ's