DELAY REPORT ON 2-4-2023

SHIFT DELAY Equipment Availability


RESPONSIBLE
Sl. No Date Job Locations Job Details
DEPARTMENT
A B C Stop time Start Time Total time 24 Time in hours %
POWER FALIURE 13:35 15:50 02:15 ELECTRICAL
BENEFICIATION SCRUBBER FEED SPOUT & SP-21 SUCTION LEAKAGE 20:35 23:30 02:55 16:50 16.83 70.14% MECHANICAL
TAILING THICKNER TORQUE HIGH(ABOVE-45) 04:00 06:00 02:00 PROCESS
BC-60 D' MECHANICAL WORK 01:30 MECHANICAL
POWER FALIURE 00:28 00:30 ELECTRICAL
OTHER FILTER DISCHARGE 00:31 00:26 PROCESS
PELLET BIN LEVEL HIGH 03:35 01:19 PROCESS
FP-57A 09:13 14:47 14.78 61.60%
BIN CHANGE OVER 00:10 PROCESS
PLATE TRACK OUT 00:12 PROCESS
AIR PRESSURE LOW 00:06 PROCESS
AUTO WASH OF CLOTH 00:26 PROCESS
59-A SUCTION ISSUE 01:14 01:00 MECHANICAL
AUXILARY ARM FAULT 00:25 ELECTRICAL
OTHER FILTER DISCHARGE 00:08 00:30 00:28 PROCESS
1 02-04-2023 CLOTH CHANGED 01:30 MECHANICAL
FP-57B POWER FALIURE 00:30 08:05 15:55 15.92 66.32% ELECTRICAL
BIN CHANGE OVER 00:05 PROCESS
AIR PRESSURE LOW 00:17 PROCESS
AUTO WASH OF CLOTH 00:20 PROCESS
BC-60 D' MECHANICAL WORK 00:08 01:30 MECHANICAL
CLOTH CHANGING U/P 00:24 00:22 MECHANICAL
OTHER FILTER DISCHARGE 00:22 00:15 00:25 PROCESS
BUFFER TANK LEVEL LOW 00:08 PROCESS
POWER FALIURE 00:27 ELECTRICAL
AIR PRESSURE LOW 00:07 PROCESS
FP-57C 05:50 18:10 18.17 75.69%
BC-60 D' ROLLER REPLACEMENT WORK 01:35 MECHANICAL
DRIP TRAY NOT CLOSING 00:13 00:35 PROCESS
AUTO WASH OF CLOTH 00:25 PROCESS
BIN CHANGE OVER 00:05 PROCESS
PS-1 UN HEALTHY 00:12 00:15 MECHANICAL