The document is a delay report from a mining operation on February 4, 2023. It lists delays across three processing areas (beneficiation, FP-57A, FP-57B, FP-57C) and attributes the responsible departments. The total downtime was 9 hours 13 minutes for FP-57A, 8 hours 5 minutes for FP-57B, and 5 hours 50 minutes for FP-57C. The most frequent delays were due to electrical issues like power failures, mechanical issues with equipment, and process-related problems.
The document is a delay report from a mining operation on February 4, 2023. It lists delays across three processing areas (beneficiation, FP-57A, FP-57B, FP-57C) and attributes the responsible departments. The total downtime was 9 hours 13 minutes for FP-57A, 8 hours 5 minutes for FP-57B, and 5 hours 50 minutes for FP-57C. The most frequent delays were due to electrical issues like power failures, mechanical issues with equipment, and process-related problems.
The document is a delay report from a mining operation on February 4, 2023. It lists delays across three processing areas (beneficiation, FP-57A, FP-57B, FP-57C) and attributes the responsible departments. The total downtime was 9 hours 13 minutes for FP-57A, 8 hours 5 minutes for FP-57B, and 5 hours 50 minutes for FP-57C. The most frequent delays were due to electrical issues like power failures, mechanical issues with equipment, and process-related problems.
RESPONSIBLE Sl. No Date Job Locations Job Details DEPARTMENT A B C Stop time Start Time Total time 24 Time in hours % POWER FALIURE 13:35 15:50 02:15 ELECTRICAL BENEFICIATION SCRUBBER FEED SPOUT & SP-21 SUCTION LEAKAGE 20:35 23:30 02:55 16:50 16.83 70.14% MECHANICAL TAILING THICKNER TORQUE HIGH(ABOVE-45) 04:00 06:00 02:00 PROCESS BC-60 D' MECHANICAL WORK 01:30 MECHANICAL POWER FALIURE 00:28 00:30 ELECTRICAL OTHER FILTER DISCHARGE 00:31 00:26 PROCESS PELLET BIN LEVEL HIGH 03:35 01:19 PROCESS FP-57A 09:13 14:47 14.78 61.60% BIN CHANGE OVER 00:10 PROCESS PLATE TRACK OUT 00:12 PROCESS AIR PRESSURE LOW 00:06 PROCESS AUTO WASH OF CLOTH 00:26 PROCESS 59-A SUCTION ISSUE 01:14 01:00 MECHANICAL AUXILARY ARM FAULT 00:25 ELECTRICAL OTHER FILTER DISCHARGE 00:08 00:30 00:28 PROCESS 1 02-04-2023 CLOTH CHANGED 01:30 MECHANICAL FP-57B POWER FALIURE 00:30 08:05 15:55 15.92 66.32% ELECTRICAL BIN CHANGE OVER 00:05 PROCESS AIR PRESSURE LOW 00:17 PROCESS AUTO WASH OF CLOTH 00:20 PROCESS BC-60 D' MECHANICAL WORK 00:08 01:30 MECHANICAL CLOTH CHANGING U/P 00:24 00:22 MECHANICAL OTHER FILTER DISCHARGE 00:22 00:15 00:25 PROCESS BUFFER TANK LEVEL LOW 00:08 PROCESS POWER FALIURE 00:27 ELECTRICAL AIR PRESSURE LOW 00:07 PROCESS FP-57C 05:50 18:10 18.17 75.69% BC-60 D' ROLLER REPLACEMENT WORK 01:35 MECHANICAL DRIP TRAY NOT CLOSING 00:13 00:35 PROCESS AUTO WASH OF CLOTH 00:25 PROCESS BIN CHANGE OVER 00:05 PROCESS PS-1 UN HEALTHY 00:12 00:15 MECHANICAL