TRADE SUMMARY Amount
B Super Structure
6 Block walls with Reinforcements $
7 Basement+Ground+First Floor Slabs $
8 Steel Frame works, column & beam $
9 Allow for all treatment and painting procedure for all steel $
structure
10 Blockwork plastering works $
11 Roof Framing + Roofing works complete(fascia,gutter,dp, $
eaves lining)
C FINISHES
21 Floor Tiles - Tiling works,Trims,Glue,Grout+ Installation $
22 Wall Tiles - Tiling works,Trims,Glue,Grout+ Installation $
23 Special timber Flooring installation $
24 Aluminium Framed Doors & Windows and Glazing $
25 Aluminium louvres $
26 Aluminium security grilled doors with screens $
27 OPTION - burglar grilles and screen to windows $
27 OR - CRIMSAFE or similar $
D JOINERY & CARPENTRY
28 Timber doors (include installation client supply hardware) $
29 Timber special finishings ceilings, treads $
30 timber decking and pergolas $