12,2022 Project: OFFICE RENNOVATION Owner: GRUNDFOS Location: 24TH FLR. CYBER BETA BLDG. ORTIGAS CENTER PASIG CITY. Subject: COST PROPOSAL FOR ELECTRICAL WORKS
SCOPE OF WORKS QTY Unit TOTAL
MATERIAL Labor Cost 1. GENERAL REQUIREMENTS COST TOTAL COST TOTAL MOBILIZATION/ DEMOBILIZATION 1 lot 22,100.00
ELECTRICITY FOR THE DURATION OF PROJECT 1 lot BY OWNER
Water for the Duration of the Project 1 lot BY OWNER Building Permit 1 lot BY OWNER Occupancy Permit 1 lot BY OWNER PEZA PERMIT 1 lot BY OWNER PERSONAL SAFETY EQUIPMENT/UNIFORM 1 lot 3,000.00 HAULING / CLEANING 1 lot 3,500.00 DESIGN PLAN 1 lot 42,000.00 SUB-TOTAL 70,600.00 MECHANICAL WORKS - - - Duct Works and Diffusers (Aircon) 1 lot - 16,500.00 16,500.00 16,500.00 Duct Works and Diffusers (Exhaust and Fresh Air) 1 lot - 13,200.00 13,200.00 13,200.00 Testing and commisioning. 1 lot - - 3,500.00
total cost 103,800.00
tax 12% 12,456.00 total cost 116,256.00 Respectfully,