Date: MAY.

12,2022
Project: OFFICE RENNOVATION
Owner: GRUNDFOS
Location: 24TH FLR. CYBER BETA BLDG. ORTIGAS CENTER PASIG CITY.
Subject: COST PROPOSAL FOR ELECTRICAL WORKS

SCOPE OF WORKS QTY Unit TOTAL


MATERIAL Labor Cost
1. GENERAL REQUIREMENTS
COST TOTAL COST TOTAL
MOBILIZATION/ DEMOBILIZATION 1 lot 22,100.00

ELECTRICITY FOR THE DURATION OF PROJECT 1 lot BY OWNER


Water for the Duration of the Project 1 lot BY OWNER
Building Permit 1 lot BY OWNER
Occupancy Permit 1 lot BY OWNER
PEZA PERMIT 1 lot BY OWNER
PERSONAL SAFETY EQUIPMENT/UNIFORM 1 lot 3,000.00
HAULING / CLEANING 1 lot 3,500.00
DESIGN PLAN 1 lot 42,000.00
SUB-TOTAL 70,600.00
MECHANICAL WORKS - - -
Duct Works and Diffusers (Aircon) 1 lot - 16,500.00 16,500.00 16,500.00
Duct Works and Diffusers (Exhaust
and Fresh Air) 1 lot - 13,200.00 13,200.00 13,200.00
Testing and commisioning. 1 lot - - 3,500.00

total cost 103,800.00


tax 12% 12,456.00
total cost 116,256.00