SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 045
Job Description: Using a Concrete, Material and/or Sand Bucket.
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager
3. Use competent employees only Failure will result in injuries to persons and / Enforce the use of competent persons only
H, S
or property damage
4. Competent supervisor should be appointed for every
activity to monitor the workers.
Work task instruction should be provided for every
H, S activity.
9 Failure to adhere to lifting Falling materials. Crane must be inspected and FM/ Always
procedures while using Minor/major injuries/potential death certified by third party. Supervisor
crane Property damage. Enforce the use of competent
operator and rigger.
Rigger to ensure path of
movement is kept free from
possible obstruction and / or
H, S persons. 3
Ensure the use of certified lifting
gears.
12 Do not operate during adverse
weather conditions.
Cordoned off the lifting area.
Ensure nobody working under
the suspended load.
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
Prior to work commencement
1. Must have PPE – safety footwear, gloves, hardhat, goggles, foul weather clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
Hazards
Harm
Potential Death, Minor/major cuts and contusions, loss of limbs, fractures, concussion, to fatality, electric shock, environmental
damage
Persons in danger
1. Rigger, labours
2. Other workers/visitors in vicinity
Control measures
No lone working
1. Ensure the availability of all required certification for the lifting equipment attached to the bucket
2. Use proper buckets only.
3. Do not use any buckets that is not identified and on register.
4. Also adhere to the following Risk / Written Safe Work Procedure:
i. Usage of crane.
ii. Slinging and slewing.
iii. Slinging and slewing tower crane.
5. Use guide rope during slewing of any bucket.
6. Use only Third party Certified Buckets.
7. Never overload any bucket, comply with the Safe working load.