Professional Documents
Culture Documents
Traffic Management Checklist
Traffic Management Checklist
General Information
Project: Client:
Consultant: Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (high risk), works to be stopped and risk assessment to be reviewed immediately
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All required controls are in place (Low risk), only monitoring is required
DESCRIPTION
Evaluation
Items Remarks
Good Fair Poor N/A
Advance warning signboards
Roadwork Signboard
Guide Signs boards
Arrow signs boards
Delineators
Cones
Tubular Flexible Posts (Bollards)
Water Filled Plastic Barriers
Concrete Barriers
Longitudinal Crash worthy Barriers
Warning Lights (Flashing Lights & Beacons)
Street Lighting
Temporary Traffic Lights
Rumble Strips
Crash Cushion (Shock Absorber)
Buffer Zones
Tapers
Flaggers
Pedestrian Walkways
Construction Lane Access / Egress
Fences
Glare Screens
Turning Radius and Lane width
APPROVED BY:
Position Name Date Signature
HSE Officer Munir Ahmad
Project Engineer Ahmad Zeshan
Project Manager Ameen Mohamed