TRAFFIC MANAGEMENT CHECKLIST

General Information

Project: Client:
Consultant: Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (high risk), works to be stopped and risk assessment to be reviewed immediately
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All required controls are in place (Low risk), only monitoring is required

DESCRIPTION

Evaluation
Items Remarks
Good Fair Poor N/A
Advance warning signboards    
Roadwork Signboard    
Guide Signs boards    
Arrow signs boards    
Delineators    
Cones    
Tubular Flexible Posts (Bollards)    
Water Filled Plastic Barriers    
Concrete Barriers    
Longitudinal Crash worthy Barriers    
Warning Lights (Flashing Lights & Beacons)    
Street Lighting    
Temporary Traffic Lights    
Rumble Strips    
Crash Cushion (Shock Absorber)    
Buffer Zones    
Tapers    
Flaggers    
Pedestrian Walkways    
Construction Lane Access / Egress    
Fences    
Glare Screens    
Turning Radius and Lane width    

APPROVED BY:
Position Name Date Signature
HSE Officer Munir Ahmad
Project Engineer Ahmad Zeshan
Project Manager Ameen Mohamed

Document Ref: AE/ET/AAN/EHS/TMC/Form-004 Rev: 00