GENERAL INFORMATION
Project: Construction of Al Falah Police Station Client: Abu Dhabi Police
Consultant: Musanada Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (High risk), works to be stopped and risk assessment to be reviewed immediately.
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All control measures are in place (low risk), only monitoring is required
DESCRIPTION
Evaluation
Items Remarks
Good Fair Poor N/A
Electrical Tools:
Power cables present no hazard or obstruction &
connections are appropriate, earthed and fused
User competent & Authorized with valid card
Guard is fitted, adjusted and tools in good
condition
Emergency stop is available and operational
Manufacturer instructions are available and
followed
Monthly inspection done & color code available
Maintenance done by competent personnel only
All the Tools are internally insulated
Pneumatic Tools:
All hoses, couplings & fittings of correct rating
Hoses, couplings & fittings inspected & maintained
regularly
Tools secured to the hose by positive means to
prevent disconnection
Air supply lines protected from damage,
maintained & inspected regularly
Safety device is provided for air hose with large
diameter
Manufacturer instruction is available and followed
Operator has the certificate for the training
Manual (Unpowered) Tools:
Tool checked & inspected before use
Home-made tool is not used & tool fits the job
Suitable PPE provided for all above type of tools
Flat headed chisel is being used(no Mashromhead
Approved By:
Position Name Date Signature
HSE Officer Munir Ahmad Tech IOSH
Project Engineer Ahmad Zeshan
Project Manager Amin Mohammad