HOUSEKEEPING CHECKLIST

GENERAL INFORMATION
Project: Al Falah Police Station Client:
Consultant: Contractor: Al Eslah General Cont. Est.
Conducted By: Date:
Poor: Absence of major control measures (High risk), works to be stopped and risk assessment to be reviewed
immediately.
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All control measures are in place (low risk), only monitoring is required

DESCRIPTION

Evaluation
Items Remarks
Good Fair Poor N/A
Clear and safe access to work area    
Proper materials stacking and any loose materials
   
have been properly secured
Site offices and site area in general cleanliness and
   
orderliness
Construction waste and debris collected in
   
designated areas
Adequate rubbish containers and rubbish removed
   
daily
Old timber de-nailed & all steel bars capped    
Site & Site offices in general cleanliness &
   
orderliness
Emergency exit are not blocked or congested    
Motivational signs posted for Housekeeping    
Wash room floor are clean and tidy    
Dust bin provided near rest area    

Approved By:
Position Name Date Signature
HSE Officer Munir Ahmad
Project Engineer Ahmad Zeshan
Project Manager Amin Mohammad

Doc. Ref: AE/AD/PSAF/EHS/HK/F-11 Rev :01 Date: 20.08.2016 Page 1 of 1