Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:

SIGMA POWERTECH LIMITED

DAILY PROGRESS REPORT-01-08-2023


(MECHANICAL MAINTENANCE)

This document is the property of Sigma Powertech Limited. Any kind of plagiarism in whole or partially is
not allowed without any written consent.
Description: Document ref.: Issue date: 01-08-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:

1. Charge Air Filter Base Structure installation:


 SG#01 charge air filter base structure legs welding completed.
 SG#02 charge air filter shed rain-hood installed.
 SG#02 charge air filter base structure final painting done.
 Hollow box cutting done as per measurement for SG#04 charge air filter base.
 All hollow box welded to make charge air filter structure base.
 SG#04 charge air filter base structure base shifted near stack#04 area.
 Structure base placed in civil base.
 Structure base aligned with engine, all leg water level checked & found satisfactory.
 Structure base all leg primary welding done.

2. Exhaust Stack Bellows Installation Platform Fabrication:


 SG#01- exhaust stack maintenance platform running welding completed.
 SG#02 & 03 exhaust stack maintenance platform welding is in progress.

3. Engine Hall Sandwich Wall C-Purlin Installation:


 Engine hall north side wall C-purlin support fabrication is in progress.
 C-purlin supports fixing with column is in progress.
 C-channel buffing & painting is in progress.

4. Radiator Cooling Water Pipe Fabrication:


 04 nos. flange welded with 02 nos. 6 inch pipe.
 04 nos. cooling water pipe support fabrication completed for SG#04.
Description: Document ref.: Issue date: 01-08-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:

 All support painting done.


 SG#02 engine LT water inlet pipe fabrication completed.
 SG#02 engine HT water outlet pipe fabrication is in progress.
 06 nos. 6 inch pipe shifted to charge air filter area.
 SG#02 radiator cooling water inlet/outlet pipe installed.

5. Engine Maintenance Platforms Modification:


 SG#03 Alternator B bank side Platform one column shifting work completed.
 SG#03 Platform stair leg fabrication is in progress.
 SG#03 both bank maintenance platform grating support 100 mm extended.

6. Overhead crane beam support installation:


 06 nos. H beam cleaned by emery disc for crane beam support installation.
Description: Document ref.: Issue date: 01-08-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:

 12 nos. screw hole making done.


 North side 06 nos. overhead crane beam support installed.
 South side overhead crane beam support installation is in progress.

7. Exhaust Duct Pipe support fabrication:


 SG#01- Exhaust duct elbow support shoe fabrication is in progress.

8. Miscellaneous job:
 Engine hall housekeeping done.
 Engine hall south side area housekeeping done.
 Engine hall front & rear side area housekeeping done.
 All scrap item shifted in dumping area.