You are on page 1of 1

ID : 51Q-BU-0004

KNPC CFP – MAB2 PROJECT


RECORD of FALSE CEILING SPACE
CLOSURE
Tag Description: Tag No:
P.O No: Area(Unit): Turnover System No.:
Subcontractor : Section(Train): Sub–System No.:
Work Package: Report. No : Drawing Ref.:
ITP Ref No / Rev. No RFI No.:

Location of Ceiling to be closed: Drawing Reference :

Ceiling Type : Tile Dimension :

Area / Hall :

Floor / Level :

Room

Grid Ref

Specifics:

Date and Time Available :

Inspection Requested By:

Date of Inspection Time :

Approved : Approved Subject To: Rejected

COMMENTS :

Ceiling Closed Date :

Description Subcontractor Contractor Company

Name

Signature

Date

51Q-BU-0004 REV.1

You might also like