You are on page 1of 8

g= 9.

81 m/sec^2
η= 0.6
L= 150 m
r= 999.19 Kg/m3
Dia= 4 in
V= 1 m/sec
Q= 28.728532782 m3/h
K1= 1.5 1.5 check valve
K2= 1.5 1.5 flew meter
K3= 0.9 0.9 blew
Hs= 0.1987767584 m
u= 0.001139 Kg/m.sec
Re= 88426.999122
f= 0.03
Hv= 2.2753749818 m
H= 152.47415174 m
P= 19.8780147 KW
P= 26.656856818 HP
A= 108.03268859 A one fase
36.010896195 A 3fase

n= 1900
T= 0.0736571044
g= 9.81 m/sec^2
η= 0.6
L= 90 m
r= 999.19 Kg/m3 4.56
Dia= 4 in
V= 1.7 m/sec m3/h m3/sec
Q= 200 m3/h 235 0.065278
K1= 1.5 1.5 check valve 6 0.001667
K2= 1.5 1.5 flew meter
K3= 0.9 0.9 blew
Hs= 0.5744648318 m
u= 0.001139 Kg/m.sec
Re= 150325.89851
f= 0.03
Hv= 3.9455002184 m
H= 94.51996505 m
P= 85.786091856 KW
P= 115.04104419 HP
A= 466.22876009 A 1 fase
155.4095867 A 3 fase
38
53.5 H=53.5m to 38m
g= 9.81 m/sec^2
η= 0.6
H= 90 m
H+D h 99.9 4.56
r= 1000 Kg/m3 m3/h m3/sec
Q= 200 m3/h 235 0.065278
P= 90.7425 KW 6 0.001667
P= 121.687697 HP
A= 493.16576087 A one fase
164.38858696 A 3fase
38
53.5 H=53.5m to 38m
g= 10 m/sec^2
Speed 2900 rpm
Density 1000 kg/m3
Head 90 m
Flow 200 m3/h
Flow 0.055555556 m3/sec
Efficiency 0.8 decimal
P= 62.5 KW
P= 83.81388063 Hp
Im= 0.403120975 Kg.m2
IP= 0.092519148 Kg.m2
Torque 205.8038057 N.m
cable cable
A mm2 mm2 ‫القاطع‬
18 1.5 10 32
21 2.5 16 40
27 4 25 50
35 6 35 80
48 10 50 100
65 16 70 125
88 25 95 160
110 35 120 200
140 50 150 250
175 70 185 250
215 95 240 300
255 120 300 400
340 185
‫غطاس‬ ‫‪45HP‬‬ ‫‪35HP‬‬
‫‪150‬‬ ‫حبل‬
‫كابل‬ ‫‪70mm2*2 70mm2*3‬‬
‫قسطل‬
‫‪15000‬‬ ‫‪m‬‬ ‫‪150‬‬ ‫حفر‬
‫‪m‬‬ ‫‪150‬‬ ‫اكساء‬
‫‪1‬‬ ‫لوحة‬ ‫‪125‬‬ ‫‪125‬‬
‫‪1‬‬ ‫غطاء بئر‬
‫‪1‬‬ ‫فواشة‬