1.0 INTRODUCTION
RCC retaining walls are provided around the liquid storaeg tanks wherever necessary
to retain the liquid in the event of any possible oil leakages or tank burst conditions.
The various types of retaining walls are cantilever wall, counterfort wall,
butress wall etc.
The type of RCC retaining wall to be adopted depends on the economy and
construction feasibility.
12
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
13
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
bunded area ( H )
Free Board ( F ) = 0.3 m Bc H1
Here, Bund wall has been desinged as a cantilever retaining wall for 1 m length and for that following critical
cases has been considered
Case 1 ) Empty on tank side & soil pressure and wind on other side of retaining wall.
In this case cantilever wall has been analyzed for the active earth pressure from one side only,
while checking for the stability, wt of earth from both the side has been considered.
Case 2 ) Hydrostatic pressure due to stored liquid during spillages or tank burst conditions.
In this case cantilever wall has been analyzed for the submerged liquid pressure from tank side
15
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
only passive earth pressure on the other side of retaining wall to the possible extent of 2/3
height of overburden soil. While checking for the stability, wt of earth from both the side & wt of
16
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
liquid form tank side has been considered.
The stability and base pressure check for the retaining wall have been carried out to decide the
size and other details of the assumed retaining wall. The structural calculations are carried out later.
= 6.012 KN/m2
Shear at base of stem due to active = Pa * H2 / 2
earth pressure ( Va ) = 2.705 kN
Moment at base of stem due to active = Pa * H2 / 2 * H2 / 3
earth pressure ( Ma ) = 0.812 kNm
b) Pa
c)
Passive earth pressure, ( Pp ) = g*Kp*D1 ( Passive pressure for moment
= 0.000 KN/m2 calculation has been ignored so
Shear at base of stem due to passive = Pp * D1 / 2 as to be on conservative side )
earth pressure ( Vp ) = 0.000 kN
Moment at base of stem due to = Pp * D1 / 2 * D1 / 3
passive earth pressure ( Mp ) = 0.000 kNm
d)
Additional Shear ( Vadd ) = 0.00 kN ( Due to Walkway at top )
Additional Moment ( Madd ) = 0.53 kNm ( Due to Walkway at top )
17
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
pressure ( Ml ) = 9.720 kNm
18
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
b)
Active earth pressure ( Pa ) = Ka * (g-gw) * D1
= 3.006 KN/m2
Shear at base of stem due to active = Ka*(g-gw)*D12/2
earth pressure ( Va ) = 1.353 kN
Moment at base of stem due to active = Ka*(g-gw)*D13/6
earth pressure ( Ma ) = 0.406 kNm
c)
Passive earth pressure ( Pp ) = g*Kp*H2 ( Passive pressure for moment
= 0.000 KN/m 2 calculation has been ignored so
Shear at base of stem due to passive = Pp * H2 / 2 as to be on conservative side )
earth pressure ( Vp ) = 0.000 kN
Moment at base of stem due to = Pp * H2 / 2 * H2 / 3
passive earth pressure ( Mp ) = 0.000 kNm
d)
Wind pressure ( Qw ) = 0.76 KN/m2
Shear at base of stem due to wind = Qw * F
pressure ( Vw ) = 0.228 kN
Moment at base of stem due to wind = Qw * F * (F/2 + (H1-F-Wb))
pressure ( Mw ) = 0.4446 kNm
e)
Additional Shear ( Vadd ) = 0.00 kN ( Due to Walkway at top )
Additional Moment ( Madd ) = 0.53 kNm ( Due to Walkway at top )
19
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
20
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
z = 0.95 x d
= 204.25 mm
From the above required Astreq1 = 390.00 mm2 Max of Ast1, Ast2 & Ast3
21
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By :K. Girish
= 0.57 N/mm²
Since vc > v1, Hence section is SAFE in shear
22
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Maximum allowable crack width = 0.3 mm (Per BS 8110-2 : 1985 clause 3.2.4)
Where,
acr = Dist from point considered to the surface of the nearest long bar
= Sqrt( S/22+ (c+f/2)2 ) - (f/2)
= 113.31 mm acr
f = Size of each reinforcing bar
= 20
D = Depth of wall = B
= 300
S = Spacing of reinforcement
= 150
As = Area of steel
= 2093.333
Where,
acr = 113.31 mm
em = average strain at the level where the cracking is being considered
= e1 -e2
= 0.000
e2 = bt*(h-x)*(a'-x)/3*Es*As*(d-x) for crack width of 0.3mm
= 0.0002
19
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
e1 = fs/Es*((h-x)/(d-x))
= 0.000
Moment in section, M = 11.10 kNm ( Unfactored moment)
Stress in steel, fs = M/(As*(d-S'/2))
= 25.96203 N/mm2 OK
h = Overall depth of member = D
= 300 mm
k = Mu / fcu bd2
= 0.011 < 0.156
z = d* [ 0.5 + sqrt ( 0.25 - k/0.9 )] & 0.95 x d
= 212.29 mm & 204.25 mm
z = 204.25 mm
S' = Depth of stress block
= 21.5 mm
x = depth of neutral axis
= (d-z)/0.45
= 23.88889 mm
W2 = 3*acr*em/(1+2*(acr - cmin)/(h-x))
= -0.01 mm < 0.30 mm OK
20
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
21
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Sign Convention : Clockwise Moment +Ve Horizontal left to right direction +Ve
Anti clockwie Moment -Ve Horizontal right to left direction -Ve
a)
Active earth pressure ( Pa ) = g*Ka*H Qw
= 8.016 KN/m2
Shear at base due to active earth = Pa * H/2
pressure ( Va ) = 4.810 kN
Moment at base due active = Pa * H/2 * H/3
pressure ( Ma ) = 1.924 kNm
A
b) Pa
c)
Passive earth pressure, ( Pp ) = Kp*g*D ( Passive pressure
= 0.000 KN/m2 has been neglected )
Shear at base due to passive earth = Pp * D/2
pressure ( Vp ) = 0.000 kN
Moment at base due to passive earth = Pp * D/2 *D/3
pressure ( Mp ) = 0.000 kNm
d)
Additional Shear ( Vadd ) = 0.00 kN
Additional Moment ( Madd ) = 0.53 kNm
21
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Additional Axial Force ( Wadd ) = 4.30 kN
22
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
W = W1 + W2 +W3 + W1' + W2' + W4 + Wadd
= 41.74 kN
B1 = 0.30
Wadd
B1 = 0.30
GL
W2'
W1 H1 = 2.40
W2
GL W1' H2 = 0.90
D1 = 0.90 W4
W3 Wb = 0.30
Restoring moment ( Mr )
= W1*(Bh+0.5*B1) + W2*(Bh+B+0.5*Bt) + W3*(Bh+Bt+B)/2 + Wadd*(Bh+0.5*B1)
W1' *(Bh+B1+(B-B1)/3) + W2' * (Bh+B1+(B-Bc)*2/3) + W4*Bh/2
= 24.359 kNm
F.O.S = Mr / Mo
= 5.948 > 1.5 OK
W = 41.74 kN
Mr = 24.36 kNm
23
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Mo = -4.10 kNm
24
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
x = ( Mr - Mo ) / W
= 0.486 m
Eccentricity ( e ) = x - L/2
= -0.064 m < 0.1833333 OK
(L/6)
Moment due to eccentricity ( Me ) = Wxe
= -2.671 kNm
Pressure = W/A + Me / Z
P1 = 24.70 KN/m2
P2 = 51.19187 KN/m2
> 0 Comp
< 244 OK
PRESSURE DIAGRAM
Down pressures :
Tank side pressure = (gxD1) + (gcxWb)
( Earth + Base Slab ) = 25.20 KN/m2
0.486 e
0.55 0.55
Base Pressure :
P2 0.50 0.30 0.30 P1
Downward Pressure :
25.20 25.20
25
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
26
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
27
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Sign Convention : Clockwise Moment -Ve Horizontal left to right direction -Ve
Anti clockwie Moment +Ve Horizontal right to left direction +Ve
a) Qw
B
b)
Active earth pressure ( Pa ) = Ka*(g-gw)*D
= 4.002453 KN/m2
Shear at base due to active earth = Ka*(g-gw)*D2/2
pressure ( Va ) = 2.401 kN
Moment at base due to active earth = Ka*(g-gw)*D3/6
pressure ( Ma ) = 0.961 kNm
c)
Passive earth pressure ( Pp ) = g*Kp*H*(2/3) ( Passive pressure for 2/3 ht
= 47.971 KN/m2 has been considered )
Shear at base due to passive earth = Pp * H/2 *(2/3)
pressure ( Vp ) = 19.188 kN
Moment at base due to passive earth = (4/9)*Pp * H2/6
pressure ( Mp ) = 5.117 kNm
d)
Wind pressure ( Qw ) = 0.76 KN/m2
Shear at base due to wind = Qw * F
pressure ( Vw ) = 0.228 kN
Moment at base due to wind = Qw * F * (F/2 + (H1-F))
pressure ( Mw ) = 0.513 kNm
e)
Additional Shear ( Vadd ) = 0.00 kN
Additional Moment ( Madd ) = 0.53 kNm
25
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
W1' = 1/2 x ( 0.30 - 0.30 ) x ( 2.40 - 0.30 ) x 24 = 0 kN
W2 = 0.30 x 0.90 x 20 = 5.4 kN
26
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
W2' = 1/2 x ( 0.30 - 0.30 ) x 0.90 x 20 = 0.00 kN
W3 = ( 0.30 + 0.30 + 0.50) x 0.30 x 24 = 7.92 kN
W4 = 0.50 x 0.90 x 20 = 9 kN
W5 = ( 2.40 - 1.20 + 0.30) x 0.50 x 10.00 = 4.5 kN
Additional Axial Force ( Wadd ) = 4.30 kN
B1 = 0.30
Wadd
F = 0.30 Bc = 0.30
WL
GL
W2'
0.90 W5
W1 H1 = 2.40
W2 H2 = 0.90
GL W1'
D1 = 0.90 W4
Wb = 0.30 W3 B
Restoring moment ( Mr )
= W1*(Bt+(B-B1)+ B1/2) + W2*Bt/2 + W3*(Bh+B+Bt)/2 + Wadd*(Bt+(B-B1)+ B1/2) +
W4*(Bt+B+Bh/2) + W5*(Bt+B+Bh/2) + W1' *(Bt+(B-B1)*(2/3)) + W2' *( Bt+(B-Bc)/3)
= 25.380 kNm
F.O.S = Mr / Mo
= 2.059776 > 1.5 OK
27
Client : Kuwait Oil Company
Project: Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject: BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Base area ( A ) = BL
28
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
= 1.1 m2
W = 46.24 kN
Mr = 25.38 kNm
Mo = -12.32 kNm
x = ( Mr - Mo ) / W
= 0.283 m
Eccentricity ( e ) = x - L/2
= -0.267 m > 0.1833333 NOT OK
(L/6)
Moment due to eccentricity ( Me ) = Wxe
= -12.34608 kNm
Pressure = W/A + Me / Z
P1 = -19.18 KN/m 2
P2 = 103.2566 KN/m2
< 0 Tension
PRESSURE DIAGRAM < 244 OK
Down pressures :
Tank side pressure = (gxD1) + (gcxWb) + (gwx(H1-D1-Wb-F))
( Earth+liquid+ Base Slab) = 34.20 KN/m2
e 0.283
0.55 0.55
Base Pressure :
Downward Pressure :
29
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
34.20 25.20
30
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
31
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
32
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Sign Convention : Clockwise Moment -Ve Horizontal left to right direction -Ve
Anti clockwie Moment +Ve Horizontal right to left direction +Ve
z = 0.95 x d
= 204.25 mm
From the above required Astreq1 = 390.00 mm2 Max of Ast1, Ast2 & Ast3
Required 20 mm bar at a spacing of 805 mm c/c
29
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Area of steel provided Astprov1 = 2093 mm2
30
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
pt provided = 0.70 %
100Ast / bd = 0.974
From BS 8110, Part 1 Table 3.8 ( vc ) = 0.450 N/mm² For fcu = 25 N/mm2
Revise value of ( vc ) = vc*( fcu /25 )1/3 For fcu = 35 N/mm2
= 0.503 N/mm²
Since vc > v1, v2 & v3, Hence section is SAFE in shear
31
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
32
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
Appendix - I
EL 100.50
EL 100.20 300
2100
EL 99.30 EL 99.30
900
900
300
500 300
300
31
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
32
Client : Kuwait Oil Company
Project : Facility Upgrade and Relocation of Under Ground Process Piping
Job No : JI-180 Doc No : JI-180-021-ECV-CAL-050
Subject : BUNDWALLS CONTAINMENT CAPACITY Rev No : B
CALCULATIONS ( FOR GC-21 ) Prep. By : Dipak
Checkd. By : K. Girish
33