You can compare any two bills by entering the bills in the Find Bills to Compare page. The Bill
Components Comparison page displays both the bills. For example, you can compare the
primary to an alternate bill, the same bill across organizations, or the current revision of an
item to a future revision.
The two assemblies and their attributes are referred to as Bill 1 and Bill 2, or simply as 1 and
2.
In this topic, you will compare two bills of material in the same organization.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Comparison page.
Step Action
5. Click the M1 Seattle Manufacturing list item.
or Press [Alt+O].
7. Use the Find Bills to Compare page to enter selection criteria for Bill 1 and Bill
2.
Step Action
8. Click in the Item field.
9. Enter the desired information into the Item field. Enter "RT1000".
10. Click in the Item field.
11. Enter the desired information into the Item field. Enter "RT_MODEL".
12. Click the Item Seq, Operation Seq option.
13. To view only the differences between bills, select the Differences Only check
box.
Step Action
15. Use the Bill Components Comparison page to view both the bills. You can see
the two columns, one for assembly #1 and one for assembly #2, which indicate if
the component appears in the assembly.
The Main tab region displays the item and operation sequences, planning percent,
quantity, and whether the item is optional.
Step Action
16. The Effectivity tab region displays the effective date range and whether the item
is implemented.
17. The Description tab enables you to view the description of the items in the
assembly.