You are on page 1of 5

System Process Document

Comparing Two Bills of Material

Department
Responsibility/Role
File Name 691019694.docx
Revision
Document Generation Date 6/3/2020 3:10:00 PM
Date Modified 6/3/2020 3:10:00 PM
Last Changed by
Status

Comparing Two Bills of Material


Trigger:

Concept
You can compare any two bills by entering the bills in the Find Bills to Compare page. The Bill
Components Comparison page displays both the bills. For example, you can compare the
primary to an alternate bill, the same bill across organizations, or the current revision of an
item to a future revision.

The two assemblies and their attributes are referred to as Bill 1 and Bill 2, or simply as 1 and
2.

In this topic, you will compare two bills of material in the same organization.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 6/3/2020 3:10:00 PM Page 1


System Process Document
Comparing Two Bills of Material

Procedure

Step Action
1. Begin by navigating to the Comparison page.

Click the vertical scrollbar.


2. Click the Manufacturing and Distribution Manager, Vision Services (USA),
Standard link.

3. Click the Comparison link.

4. Use the Organizations page to select your organization.

Page 2 Last changed on: 6/3/2020 3:10:00 PM


System Process Document
Comparing Two Bills of Material

Step Action
5. Click the M1 Seattle Manufacturing list item.

6. Click the OK button.

or Press [Alt+O].
7. Use the Find Bills to Compare page to enter selection criteria for Bill 1 and Bill
2.

Last changed on: 6/3/2020 3:10:00 PM Page 3


System Process Document
Comparing Two Bills of Material

Step Action
8. Click in the Item field.

9. Enter the desired information into the Item field. Enter "RT1000".
10. Click in the Item field.

11. Enter the desired information into the Item field. Enter "RT_MODEL".
12. Click the Item Seq, Operation Seq option.

13. To view only the differences between bills, select the Differences Only check
box.

Click the Differences Only option.

14. Click the Compare button.

Page 4 Last changed on: 6/3/2020 3:10:00 PM


System Process Document
Comparing Two Bills of Material

Step Action
15. Use the Bill Components Comparison page to view both the bills. You can see
the two columns, one for assembly #1 and one for assembly #2, which indicate if
the component appears in the assembly.

The Main tab region displays the item and operation sequences, planning percent,
quantity, and whether the item is optional.

Step Action
16. The Effectivity tab region displays the effective date range and whether the item
is implemented.

Click the Effectivity tab.

17. The Description tab enables you to view the description of the items in the
assembly.

Click the Description tab.

18. You have successfully compared two bills of material.


End of Procedure.

Last changed on: 6/3/2020 3:10:00 PM Page 5

You might also like