II REBAR WORKS (NOTE: All weights are in KILOGRAMS and lengths are in METERS, otherwise specified)
AVE. % WASTAGE
28.06%
2.1 Reinforcement Bars
CUT LENGTH BAR LENGTH CUTS/BAR PIECE CUTS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM UNIT WT
2.1.1 FOUNDATION FOOTINGS F1 1.00 10.50 10.00 13.00 2.00 8.00 38.10% 16.00 LONGITUDINAL MAIN 21.00 1.00 1.00 1.58 33.16 491.07
1.00 10.50 10.00 14.00 2.00 7.00 33.33% 16.00 TRANSVERSE MAIN 21.00 1.00 1.00 1.58 33.16
F2 1.00 6.00 6.00 12.00 2.00 0.00 0.00% 16.00 LONGITUDINAL MAIN 12.00 1.00 1.00 1.58 18.95
1.00 6.00 6.00 13.00 3.00 5.00 27.78% 16.00 TRANSVERSE MAIN 18.00 1.00 1.00 1.58 28.42
F3 1.00 12.00 12.00 11.00 1.00 1.00 8.33% 16.00 LONGITUDINAL MAIN 12.00 2.00 1.00 1.58 37.90
1.00 12.00 12.00 13.00 2.00 11.00 45.83% 16.00 TRANSVERSE MAIN 24.00 2.00 1.00 1.58 75.79
F3 1.00 7.50 7.00 11.00 2.00 4.00 26.67% 16.00 LONGITUDINAL MAIN 15.00 3.00 1.00 1.58 71.06
1.00 7.50 7.00 12.00 2.00 3.00 20.00% 16.00 TRANSVERSE MAIN 15.00 3.00 1.00 1.58 71.06
F4 1.00 9.00 9.00 10.00 2.00 8.00 44.44% 16.00 LONGITUDINAL MAIN 18.00 1.00 1.00 1.58 28.42
1.00 10.00 10.00 12.00 2.00 8.00 40.00% 16.00 TRANSVERSE MAIN 20.00 1.00 1.00 1.58 31.58
F5 1.00 9.00 9.00 10.00 2.00 8.00 44.44% 16.00 LONGITUDINAL MAIN 18.00 1.00 1.00 1.58 28.42
1.00 10.50 10.00 11.00 2.00 10.00 47.62% 16.00 TRANSVERSE MAIN 21.00 1.00 1.00 1.58 33.16
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.2 FOOTING TIE BEAM H1 (FTB-1) 1.00 10.50 10.00 4.00 1.00 6.50 61.90% 16.00 LONGITUDINAL MAIN 10.50 1.00 1.00 1.58 16.58 101.85
H2 (FTB-1) 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 16.00 LONGITUDINAL MAIN 7.50 1.00 1.00 1.58 11.84
H3 (FTB-1) 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 16.00 LONGITUDINAL MAIN 7.50 1.00 1.00 1.58 11.84
H4 (FTB-1) 1.00 6.00 6.00 4.00 1.00 2.00 33.33% 16.00 LONGITUDINAL MAIN 6.00 1.00 1.00 1.58 9.47
V1 (FTB-1) 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 16.00 LONGITUDINAL MAIN 7.50 1.00 1.00 1.58 11.84
V2 (FTB-1) 1.00 12.00 12.00 4.00 1.00 8.00 66.67% 16.00 LONGITUDINAL MAIN 12.00 1.00 1.00 1.58 18.95
V3 (FTB-1) 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 16.00 LONGITUDINAL MAIN 7.50 1.00 1.00 1.58 11.84
V4 (FTB-1) 1.00 6.00 6.00 4.00 1.00 2.00 33.33% 16.00 LONGITUDINAL MAIN 6.00 1.00 1.00 1.58 9.47
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
H1 (FTB-1) 1.00 9.00 9.00 29.00 4.00 7.00 19.44% 10.00 HOOPS 36.00 1.00 1.00 0.62 22.18 177.41
H2 (FTB-1) 1.00 9.00 9.00 48.00 6.00 6.00 11.11% 10.00 HOOPS 54.00 1.00 1.00 0.62 33.26
H3 (FTB-1) 1.00 9.00 9.00 39.00 5.00 6.00 13.33% 10.00 HOOPS 45.00 1.00 1.00 0.62 27.72
H4 (FTB-1) 1.00 9.00 9.00 34.00 4.00 2.00 5.56% 10.00 HOOPS 36.00 1.00 1.00 0.62 22.18
V1 (FTB-1) 1.00 9.00 9.00 24.00 3.00 3.00 11.11% 10.00 HOOPS 27.00 1.00 1.00 0.62 16.63
V2 (FTB-1) 1.00 9.00 9.00 18.00 2.00 0.00 0.00% 10.00 HOOPS 18.00 1.00 1.00 0.62 11.09
V3 (FTB-1) 1.00 9.00 9.00 24.00 3.00 3.00 11.11% 10.00 HOOPS 27.00 1.00 1.00 0.62 16.63
V4 (FTB-1) 1.00 9.00 9.00 42.00 5.00 3.00 6.67% 10.00 HOOPS 45.00 1.00 1.00 0.62 27.72
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.3 WALL FOOTINGS H1 (WF-1) & V3 (WF-1) 1.00 7.50 7.00 3.00 1.00 4.50 60.00% 10.00 LONGITUDINAL MAIN 7.50 1.00 1.00 0.62 4.62 25.87
H2 (WF-1) 1.00 9.00 9.00 3.00 1.00 6.00 66.67% 10.00 LONGITUDINAL MAIN 9.00 1.00 1.00 0.62 5.54
H3 (WF-1) 1.00 9.00 9.00 3.00 1.00 6.00 66.67% 10.00 LONGITUDINAL MAIN 9.00 1.00 1.00 0.62 5.54
V1 (WF-1) 1.00 9.00 9.00 3.00 1.00 6.00 66.67% 10.00 LONGITUDINAL MAIN 9.00 1.00 1.00 0.62 5.54
V2 (WF-1) 1.00 7.50 7.00 3.00 1.00 4.50 60.00% 10.00 LONGITUDINAL MAIN 7.50 1.00 1.00 0.62 4.62
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
H1 (WF-1) & V3 (WF-1) 1.00 7.50 7.00 6.00 1.00 1.50 20.00% 12.00 TRANSVERSE MAIN 7.50 1.00 1.00 0.89 6.66 37.30
H2 (WF-1) 1.00 9.00 9.00 6.00 1.00 3.00 33.33% 12.00 TRANSVERSE MAIN 9.00 1.00 1.00 0.89 7.99
H3 (WF-1) 1.00 9.00 9.00 6.00 1.00 3.00 33.33% 12.00 TRANSVERSE MAIN 9.00 1.00 1.00 0.89 7.99
V1 (WF-1) 1.00 9.00 9.00 6.00 1.00 3.00 33.33% 12.00 TRANSVERSE MAIN 9.00 1.00 1.00 0.89 7.99
V2 (WF-1) 1.00 7.50 7.00 6.00 1.00 1.50 20.00% 12.00 TRANSVERSE MAIN 7.50 1.00 1.00 0.89 6.66
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.4 SLAB ON GRADE AREA 1 1.00 12.00 12.00 4.00 1.00 8.00 66.67% 10.00 LONGITUDINAL MAIN 12.00 1.00 1.00 0.62 7.39 38.81
1.00 6.00 6.00 4.00 1.00 2.00 33.33% 10.00 TRANSVERSE MAIN 6.00 1.00 1.00 0.62 3.70
AREA 2 1.00 6.00 6.00 4.00 1.00 2.00 33.33% 10.00 LONGITUDINAL MAIN 6.00 1.00 1.00 0.62 3.70
1.00 6.00 6.00 4.00 1.00 2.00 33.33% 10.00 TRANSVERSE MAIN 6.00 1.00 1.00 0.62 3.70
AREA 3 1.00 10.50 10.00 4.00 1.00 6.50 61.90% 10.00 LONGITUDINAL MAIN 10.50 1.00 1.00 0.62 6.47
1.00 6.00 6.00 4.00 1.00 2.00 33.33% 10.00 TRANSVERSE MAIN 6.00 1.00 1.00 0.62 3.70
AREA 4 1.00 10.50 10.00 4.00 1.00 6.50 61.90% 10.00 LONGITUDINAL MAIN 10.50 1.00 1.00 0.62 6.47
1.00 6.00 6.00 4.00 1.00 2.00 33.33% 10.00 TRANSVERSE MAIN 6.00 1.00 1.00 0.62 3.70
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.5 SECOND FLOOR SUSPENDED SLAB SECOND FLOOR AREA 1 1.00 6.00 6.00 16.00 3.00 2.00 11.11% 12.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.89 15.98 139.86
1.00 6.00 6.00 16.00 3.00 2.00 11.11% 12.00 TRANSVERSE MAIN 18.00 1.00 1.00 0.89 15.98
SECOND FLOOR AREA 2 1.00 7.50 7.00 16.00 3.00 6.50 28.89% 12.00 LONGITUDINAL MAIN 22.50 1.00 1.00 0.89 19.98
1.00 7.50 7.00 16.00 3.00 6.50 28.89% 12.00 TRANSVERSE MAIN 22.50 1.00 1.00 0.89 19.98
CANOPY 20CM FRONT 1.00 7.50 7.00 16.00 3.00 6.50 28.89% 12.00 LONGITUDINAL MAIN 22.50 1.00 1.00 0.89 19.98
1.00 6.00 6.00 16.00 3.00 2.00 11.11% 12.00 TRANSVERSE MAIN 18.00 1.00 1.00 0.89 15.98
CANOPY 20CM RIGHT SIDE 1.00 6.00 6.00 16.00 3.00 2.00 11.11% 12.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.89 15.98
1.00 6.00 6.00 16.00 3.00 2.00 11.11% 12.00 TRANSVERSE MAIN 18.00 1.00 1.00 0.89 15.98
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.6 COLUMNS (GROUND FLOOR) C1 1.00 7.50 7.00 8.00 2.00 7.00 46.67% 16.00 LONGITUDINAL MAIN 15.00 6.00 1.00 1.58 142.11 142.11
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
C2 1.00 7.50 7.00 8.00 2.00 7.00 46.67% 25.00 LONGITUDINAL MAIN 15.00 3.00 1.00 3.85 173.43 173.43
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
C1 1.00 7.50 7.00 57.00 9.00 10.50 15.56% 10.00 HOOPS 67.50 6.00 1.00 0.62 249.48 839.92
1.00 9.00 9.00 57.00 7.00 6.00 9.52% 10.00 HOOPS 63.00 6.00 1.00 0.62 232.85
C2 1.00 7.50 7.00 57.00 9.00 10.50 15.56% 10.00 HOOPS 67.50 3.00 1.00 0.62 124.74
1.00 9.00 9.00 57.00 7.00 6.00 9.52% 10.00 HOOPS 63.00 6.00 1.00 0.62 232.85
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.7 COLUMNS (SECOND FLOOR) C1 (A) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 16.00 LONGITUDINAL MAIN 10.50 2.00 1.00 1.58 33.16 73.42
C1 (B) 1.00 7.50 7.00 8.00 2.00 7.00 46.67% 16.00 LONGITUDINAL MAIN 15.00 1.00 1.00 1.58 23.69
C1 (C) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 16.00 LONGITUDINAL MAIN 10.50 1.00 1.00 1.58 16.58
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
C2 (A) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 25.00 LONGITUDINAL MAIN 10.50 2.00 1.00 3.85 80.93 167.65
C2 (B) 1.00 12.00 12.00 8.00 1.00 4.00 33.33% 25.00 LONGITUDINAL MAIN 12.00 1.00 1.00 3.85 46.25
C2 (C) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 25.00 LONGITUDINAL MAIN 10.50 1.00 1.00 3.85 40.47
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
C1 (A) 1.00 7.50 7.00 33.00 5.00 4.50 12.00% 10.00 STIRRUPS 37.50 2.00 1.00 0.62 46.20 423.19
1.00 9.00 9.00 33.00 4.00 3.00 8.33% 10.00 STIRRUPS 36.00 2.00 1.00 0.62 44.35
C1 (B) 1.00 7.50 7.00 38.00 6.00 7.00 15.56% 10.00 STIRRUPS 45.00 1.00 1.00 0.62 27.72
1.00 9.00 9.00 38.00 5.00 7.00 15.56% 10.00 STIRRUPS 45.00 1.00 1.00 0.62 27.72
C1 (C) 1.00 7.50 7.00 48.00 7.00 4.50 8.57% 10.00 STIRRUPS 52.50 1.00 1.00 0.62 32.34
1.00 9.00 9.00 48.00 6.00 6.00 11.11% 10.00 STIRRUPS 54.00 1.00 1.00 0.62 33.26
C2 (A) 1.00 7.50 7.00 33.00 5.00 4.50 12.00% 10.00 STIRRUPS 37.50 2.00 1.00 0.62 46.20
1.00 9.00 9.00 33.00 4.00 3.00 8.33% 10.00 STIRRUPS 36.00 2.00 1.00 0.62 44.35
C2 (B) 1.00 7.50 7.00 38.00 6.00 7.00 15.56% 10.00 STIRRUPS 45.00 1.00 1.00 0.62 27.72
1.00 9.00 9.00 38.00 5.00 7.00 15.56% 10.00 STIRRUPS 45.00 1.00 1.00 0.62 27.72
C2 (C) 1.00 7.50 7.00 48.00 7.00 4.50 8.57% 10.00 STIRRUPS 52.50 1.00 1.00 0.62 32.34
1.00 9.00 9.00 48.00 6.00 6.00 11.11% 10.00 STIRRUPS 54.00 1.00 1.00 0.62 33.26
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.8 SECOND FLOOR BEAMS 2B1 1.00 7.50 7.00 16.00 3.00 6.50 28.89% 16.00 LONGITUDINAL MAIN 22.50 2.00 1.00 1.58 71.06 431.07
2B2 1.00 6.00 6.00 10.00 2.00 2.00 16.67% 16.00 LONGITUDINAL MAIN 12.00 1.00 1.00 1.58 18.95
2B3 (3.9m) 1.00 9.00 9.00 6.00 1.00 3.00 33.33% 16.00 LONGITUDINAL MAIN 9.00 1.00 1.00 1.58 14.21
2B3 (2.0m) 1.00 9.00 9.00 6.00 1.00 3.00 33.33% 16.00 LONGITUDINAL MAIN 9.00 1.00 1.00 1.58 14.21
2B3 (3.0m) 1.00 12.00 12.00 6.00 1.00 6.00 50.00% 16.00 LONGITUDINAL MAIN 12.00 3.00 1.00 1.58 56.84
2B4 (2.0m) 1.00 9.00 9.00 4.00 1.00 5.00 55.56% 16.00 LONGITUDINAL MAIN 9.00 2.00 1.00 1.58 28.42
2B4 (3.0m) 1.00 12.00 12.00 4.00 1.00 8.00 66.67% 16.00 LONGITUDINAL MAIN 12.00 4.00 1.00 1.58 75.79
2B4 (3.5m) 1.00 9.00 9.00 4.00 1.00 5.00 55.56% 16.00 LONGITUDINAL MAIN 9.00 1.00 1.00 1.58 14.21
2B4 (6.5m) 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 16.00 LONGITUDINAL MAIN 7.50 2.00 1.00 1.58 23.69
2CB1 (0.5m) 1.00 6.00 6.00 8.00 2.00 4.00 33.33% 16.00 LONGITUDINAL MAIN 12.00 5.00 1.00 1.58 94.74
2CB1 (1.0m) 1.00 6.00 6.00 8.00 2.00 4.00 33.33% 16.00 LONGITUDINAL MAIN 12.00 1.00 1.00 1.58 18.95
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2B1 1.00 7.50 7.00 4.00 1.00 3.50 46.67% 12.00 LONGITUDINAL MAIN 7.50 2.00 1.00 0.89 13.32 13.32
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2B1 1.00 7.50 7.00 65.00 10.00 10.00 13.33% 10.00 STIRRUPS 75.00 2.00 1.00 0.62 92.40 562.72
2B2 1.00 7.50 7.00 55.00 8.00 5.00 8.33% 10.00 STIRRUPS 60.00 1.00 1.00 0.62 36.96
2B3 (3.9m) 1.00 10.50 10.00 44.00 5.00 8.50 16.19% 10.00 STIRRUPS 52.50 1.00 1.00 0.62 32.34
2B3 (2.0m) 1.00 10.50 10.00 25.00 3.00 6.50 20.63% 10.00 STIRRUPS 31.50 1.00 1.00 0.62 19.40
2B3 (3.0m) 1.00 10.50 10.00 35.00 4.00 7.00 16.67% 10.00 STIRRUPS 42.00 3.00 1.00 0.62 77.62
2B4 (2.0m) 1.00 10.50 10.00 25.00 3.00 6.50 20.63% 10.00 STIRRUPS 31.50 2.00 1.00 0.62 38.81
2B4 (3.0m) 1.00 10.50 10.00 35.00 4.00 7.00 16.67% 10.00 STIRRUPS 42.00 4.00 1.00 0.62 103.49
2B4 (3.5m) 1.00 10.50 10.00 40.00 4.00 2.00 4.76% 10.00 STIRRUPS 42.00 1.00 1.00 0.62 25.87
2B4 (6.5m) 1.00 10.50 10.00 70.00 7.00 3.50 4.76% 10.00 STIRRUPS 73.50 2.00 1.00 0.62 90.55
2CB1 (0.5m) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 10.00 STIRRUPS 10.50 5.00 1.00 0.62 32.34
2CB1 (1.0m) 1.00 10.50 10.00 14.00 2.00 7.00 33.33% 10.00 STIRRUPS 21.00 1.00 1.00 0.62 12.94
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.9 ROOF BEAMS RB1 (3.9m) 1.00 9.00 9.00 8.00 1.00 1.00 11.11% 12.00 LONGITUDINAL MAIN 9.00 2.00 1.00 0.89 15.98 129.20
RB1 (6m) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 12.00 LONGITUDINAL MAIN 10.50 1.00 1.00 0.89 9.32
RB1 (2.1m) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 12.00 LONGITUDINAL MAIN 10.50 1.00 1.00 0.89 9.32
RB1 (5.0m) 1.00 6.00 6.00 8.00 2.00 4.00 33.33% 12.00 LONGITUDINAL MAIN 12.00 1.00 1.00 0.89 10.66
RB1 (2.0m) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 12.00 LONGITUDINAL MAIN 10.50 3.00 1.00 0.89 27.97
RB1 (3.0m) 1.00 10.50 10.00 8.00 1.00 2.50 23.81% 12.00 LONGITUDINAL MAIN 10.50 6.00 1.00 0.89 55.94
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
RB1 (3.9m) 1.00 10.50 10.00 44.00 5.00 8.50 16.19% 10.00 STIRRUPS 52.50 2.00 1.00 0.62 64.68 381.61
RB1 (6m) 1.00 10.50 10.00 65.00 7.00 8.50 11.56% 10.00 STIRRUPS 73.50 1.00 1.00 0.62 45.28
RB1 (2.1m) 1.00 10.50 10.00 26.00 3.00 5.50 17.46% 10.00 STIRRUPS 31.50 1.00 1.00 0.62 19.40
RB1 (5.0m) 1.00 10.50 10.00 55.00 6.00 8.00 12.70% 10.00 STIRRUPS 63.00 1.00 1.00 0.62 38.81
RB1 (2.0m) 1.00 10.50 10.00 25.00 3.00 6.50 20.63% 10.00 STIRRUPS 31.50 3.00 1.00 0.62 58.21
RB1 (3.0m) 1.00 10.50 10.00 35.00 4.00 7.00 16.67% 10.00 STIRRUPS 42.00 6.00 1.00 0.62 155.23
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.10 STAIRCASE STEPS 1.00 6.00 6.00 7.00 2.00 5.00 41.67% 12.00 MAIN TOP BARS 12.00 10.00 1.00 0.89 106.56 474.19
1.00 6.00 6.00 7.00 2.00 5.00 41.67% 12.00 MAIN BOTTOM BARS 12.00 10.00 1.00 0.89 106.56
1.00 6.00 6.00 11.00 2.00 1.00 8.33% 12.00 CONFINEMENT BARS 12.00 10.00 1.00 0.89 106.56
1.00 10.50 10.00 11.00 2.00 10.00 47.62% 12.00 LONGITUDINAL TENSION BARS 21.00 1.00 1.00 0.89 18.65
1.00 9.00 9.00 4.00 1.00 5.00 55.56% 12.00 TRANSVERSE TENSION BARS 9.00 1.00 1.00 0.89 7.99
WINDER 1.00 6.00 6.00 11.00 2.00 1.00 8.33% 12.00 MAIN TOP BARS 12.00 4.00 1.00 0.89 42.62
1.00 6.00 6.00 11.00 2.00 1.00 8.33% 12.00 MAIN BOTTOM BARS 12.00 4.00 1.00 0.89 42.62
1.00 6.00 6.00 11.00 2.00 1.00 8.33% 12.00 CONFINEMENT BARS 12.00 4.00 1.00 0.89 42.62
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.11 COUNTERTOPS GROUND FLR COUNTERTOP 1 1.00 6.00 6.00 11.00 2.00 1.00 8.33% 10.00 LONGITUDINAL MAIN 12.00 1.00 1.00 0.62 7.39 36.96
1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 TRANSVERSE MAIN 18.00 1.00 1.00 0.62 11.09
GROUND FLR COUNTERTOP 2 1.00 6.00 6.00 11.00 2.00 1.00 8.33% 10.00 LONGITUDINAL MAIN 12.00 1.00 1.00 0.62 7.39
1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 TRANSVERSE MAIN 18.00 1.00 1.00 0.62 11.09
CUT LENGTH BAR LENGTH PCS/BAR PCS/SET BAR PC/SET WASTAGE % WASTAGE BAR DIAM
2.1.12 CANOPY CANOPY (W2) 1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09 66.53
1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09
CANOPY (W3) 1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09
1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09
CANOPY (D2) 1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09
1.00 9.00 9.00 11.00 2.00 7.00 38.89% 10.00 LONGITUDINAL MAIN 18.00 1.00 1.00 0.62 11.09
2.2.3 WALL FOOTINGS H1 (WF-1) & V3 (WF-1) 18.00 1.00 0.30 5.40
H2 (WF-1) 18.00 1.00 0.30 5.40
H3 (WF-1) 18.00 1.00 0.30 5.40
V1 (WF-1) 18.00 1.00 0.30 5.40
V2 (WF-1) 18.00 1.00 0.30 5.40
2.2.5 SECOND FLOOR SUSPENDED SLAB SECOND FLOOR AREA 1 256.00 1.00 0.30 76.80
SECOND FLOOR AREA 2 256.00 1.00 0.30 76.80
CANOPY 20CM FRONT 256.00 1.00 0.30 76.80
CANOPY 20CM RIGHT SIDE 256.00 1.00 0.30 76.80
SUBTOTAL ITEM II
UNIT UNIT COST DIRECT MAT DIRECT LAB TOTAL MAT TOTAL LAB SUBTOTAL -
G40 -
G60 -
kg/s - - - - - - 491.07
kg/s - - - - - - 101.85
kg/s - - - - - - 177.41
kg/s - - - - - - 25.87
kg/s - - - - - - 37.30
kg/s - - - - - - 38.81
kg/s - - - - - - 139.86
kg/s - - - - - - 142.11
kg/s - - - - - - 173.43
kg/s - - - - - - 839.92
kg/s - - - - - - 73.42
kg/s - - - - - - 167.65
kg/s - - - - - - 423.19
kg/s - - - - - - 431.07
kg/s - - - - - - 13.32
kg/s - - - - - - 562.72
kg/s - - - - - - 129.20
kg/s - - - - - - 381.61
kg/s - - - - - - 474.19
kg/s - - - - - - 36.96
kg/s - - - - - - 66.53
4.93
kg/s - - - - - - 3.06%
-
PhP -
BEAM
FOUR SETS OF SPACING
DESIGNATION BEAM LENGTH SPACING A # BARS A SPACING B # BARS B
COLUMN
DESIGNATION COLUMN HEIGHT H/6 HOOP SPACING 2H/3 HOOP SPACING
NUMBER OF
SPACING C SETS TYPE STIRRUPS
0.10 1.00 A 65
0.10 1.00 A 55
0.10 1.00 A 44
0.10 1.00 A 35
0.10 1.00 A 25
0.10 1.00 A 40
0.10 1.00 A 70
0.10 1.00 B 8
0.10 1.00 B 14
NUMBER OF
HOOPS
19
38
33
38
48