Professional Documents
Culture Documents
DEDICATION 4
ACKNOWLEDGEMENT 5
ABSTRACT 6
INTRODUCTION 7
INTRODUCTION 7
OBJECTIVES OF INDUSTRIAL ATTACHMENT 7
COMPANY PROFILE 8
COMPANY’S MANDATE 8
COMPANY’S MISSION/VISION 8
COMPANY’S AIM 8
CHAPTER 2: PROJECTS 12
CHIEFS OFFICE
LIBRARY DESIGN FOR TTI
HOSTEL DESIGN FOR TTI
CHEBUKAKA TUITION BLOCK
ST LUKES KIMILILI HIGH SCHOOL
WAMALWA KIJANA TUITION BLOCK
NDENGELWA RESOURCE CENTER
CHWELE DAY CARE TUITIN BLOCK
PROPOSED MIXED URBAN DESIGN
KERICHO MANSION
CHAPTER 3 23
This attachment report describes into detail all activities I was involved in
during the period of attachment at Biosystems Consultancy.
It also outlines the knowledge and skills I acquired during the period of
attachment that are practically applicable in the field of architecture.
INTRODUCTION
Introduction
➢ Provide opportunities for students to gain practical and soft skills which
would be suitable for future employment
➢ Facilitate students to learn more about their fields of study and related
career prospects from a real-world perspective
➢ Ensure the academic programs suit the expectations of the labour market.
Company profile
Company’s Mandate
Function
➢ Interior design
➢ Modular design
➢ Conceptual design and planning
➢ Real estate investment advisory
➢ Detail design and production drawing
➢ Project management project supervision and coordination.
Company’s Mission/Vision
On the first day of attachment we were tasked to take as built measured drawings
of King’orani apartments located in King’orani. The apartments consisted of the
ground floor (shops), mezzanine floor and 1-5 Floors. With the help of my
teammate, we took measurements of the whole building for the whole day while
doing layout sketches on site.
We then reported back to the office and digitized them. Our supervisor urged us
to calculate the areas using fills on Archicad.
Matuga - Kwale
We went to Utange, to set out. We took ropes and tied to the profile boards with
the guide of grid lines on the scheme designs. After setting out, we poured lime
(choka) 300mm from each side of the gridlines with the help of a plumb bob and
tape measure.
The choka will guide the site workers to dig the foundation trenches. Before the
trenches or choka is drawn the foreman and architect supervisor must make sure
the measurements and gridlines align with the scheme design plan given.
Chapter 2: projects
Mtwapa Project
We were given a brief and site plan to start making preliminary designs.
Brief
➢ 6 female washrooms
➢ 6 male washrooms
➢ Parking space 40
➢ Shops -75 or more
The project was to be done in phases.
We were tasked to continue modelling the shops and site using Archicad.
Skills learnt
➢ Road curbing (using custom profile and wall)
➢ Toilet privacy and sensitivity (male and female)
➢ Skirting (using custom profile)
➢ Coping on parapet wall
➢ Making sign/advertisement boards using SketchUp
Renders
We then tried to render the 3D using Twinmotion with the assistance of the
technician katana. We combined the use of SketchUp and twin motion.
Dominion Daughters
We were given the layout of a unit for the Dominion Daughters estate and the
site plan with contours.
I was tasked with modelling the site that had a relatively gentle slope. I input the
contours and levels on Archicad then was tasked to model the road on the site.
I researched on YouTube on ways to do so and found several methods i.e.
➢ Slab and solid operations tool(merging then subtraction with upward
extrusion)
➢ Morph and solid operations tool(merging then subtraction with upward
extrusion)
➢ Using mesh tool only
I was tasked to find an appropriate way to do the earthworks (cut and fill) the site
then input the units on the site as laid out.
We also did case studies and brief analysis of the added spaces on the site,
swimming pool, crèche, basketball court, commercial and communal centre and
football pitch.
Ziwa la Ng’ombe Apartments
I was tasked in improving the layout unit of dominion daughters for the client
who wanted a similar design.
I did the scheme designs then attempted on making renders using twin motion
Spa Likoni Mall
We went to site in Likoni mall near ferry and did a site analysis. Then went back
to the office to do case studies to aid us in design with the aid and supervision of
the supervisor.
We then drew bubble diagrams for the functional spaces;
➢ Salon
➢ Barber
➢ Washrooms
➢ Moroccan bath
➢ Sauna
➢ Massage parlours for both males and females
We then tried out several design layouts using fills on Archicad and areas
calculated needed for the spaces during the case study and brief analysis.
After that we handed over the project to the graduate architect to develop it.
Shamba Project
I was tasked to make the scheme designs for the project that includes mainly the
plans.
I was then tasked to aid in making the presentation plans using Photoshop.
Report
Aided in report research for the client presentation of the sultan project.
Chapter 3
Challenges faced
➢ change of working environment
➢ financial constraints
Recommendations
➢ attaches to be paid
➢ A comprehensive checklist of works to be done during attachment to be
issued to students by the university.
➢ Assessments to be done by lecturers should be thorough
CONCLUSION
Despite the challenges, the attachment was a great learning experience. I got to
share and learn a lot from my colleagues and teammates. I was equipped with
design and technical skills.
REFRENCES