You are on page 1of 8

Company:

PROJECT Doc. No.: 195363-EBA-02-DS-0001


PETROVIETNAM GAS JOINT STOCK CORPORATION
VENDOR Doc. No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY
Contractor: Rev 0
SAMSUNG C&T-PTSC CONSORTIUM Page 1 of 8
Item No. TS-P-1101A/B/C
Item Name RIVER WATER SUPPLY PUMP

PUMP DATA SHEET

ISSUED
Feb 01, 2021
1: Approved
2: Approved with Comments
3: Rejected
4: For Information (Class 1 only)
This approval does not relieve the VENDOR of his responsibilities to meet all
requirements of the contract. In case of Rejected, the VENDOR cannot proceed
with the next step until the re-submitted documents (same revision with step)
are returned to the VENDOR by purchaser.
Date Appr’d
0 1 FEB 2021 Issued for Construction K. Matsuo K. Matsuo A. Shibuya

D 21 DEC 2020 Issued for Approval K. Matsuo K. Matsuo A. Shibuya

C 18 NOV 2020 Issued for Approval K. Matsuo K. Matsuo A. Shibuya

B 16 OCT 2020 Issued for Approval K. Matsuo K. Matsuo A. Shibuya

A JUN 2020 Issued for Approval K. Matsuo K. Matsuo D. Yamashita

Rev. Date Description Prep’d by Rev’d by App’d by


This document and the information contained herein are the proprietary of PV GAS. They shall not be used, disclosed or reproduced in whole or in part without written permission from PV GAS or
another duly authorized by PV GAS to grant such permission. Any reproduction of this document in whole or in part must bear this full legend.

PV GAS THI VAI LNG RECEIVING TERMINAL


COMPANY

PETROVIETNAM GAS JOINT STOCK CORPORATION


PVGAS PROJECT MANAGEMENT COMPANY

CONTRACTOR

SAMSUNG C&T-PTSC CONSORTIUM

VENDOR

EBARA CORPORATION
Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 2 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 FOR : THI VAI LNG TERMINAL PROJECT SPECIFICATION : 195363-02-SPE-0007
2 SITE : Cai Mep Industrial Zone, Ba Ria-Vung Tau province, S.R of Vietnam P&ID : 195363-01-PID-1111
3 APPLICALBE STANDARD: API 610 11th Edition NO. REQUIRED : Three (3)
4 Applicable to: () Proposal (X) Purchase () As-built B
5 Pump Size 450 Type VS1 No. Stages One (1) B
6 Manufacturer EBARA CORPORATION Model 450VYM Serial No. R200203001 B
7 Remarks:
8
9 Note: () Indicates information completed by Purchaser (X) By manufacturer () By manufacturer or purchaser B
10 GENERAL
11 Pumps to operate in (parallel) No. motor driven Three (3) No. turbine driven N.A
12 with: One (1) Pump item No. TS-P-11 01A/B/C Pump item No. N.A
13 Gear item No. N.A Motor item No. TS-PM-11 01A/B/C Turbine item No. N.A
14 Gear Provided by N.A Motor provided by Pump vendor Turbine provided by N.A
15 Gear Mounted by N.A Motor mounted by Pump vendor Turbine mounted by N.A
16 Gear data sheet No. N.A Motor data sheet No. Turbine data sheet No. N.A
17 OPERATING CONDITIONS SITE AND UTILITY DATA (CONT.)
18 (X) Capacity, Normal 1,365 (t/h) Rated 1,365 (t/h) Water source River water, if required
19 Other *5) Chloride concentration 16000 (ppm)
20 (X) Suction pressure, Max/Rated *3) / *2) (MPa.g) Instrument air: Max/Min press. 1.0 / 0.83 (MPa.g)

21 (X) Discharge pressure *1) 0.48 @LWL (MPa.g) LIQUID


22 (X) Differential pressure 0.4845 (MPa) (X) Type/Name of liquid River water B
23 (X) Differential head 48.5 (m) NPSHA*2) 12.4 (m) (X) Pumping temp. D
24 ( ) Process variations Min/Nor/Max 23 / - / 31.5 (oC)

25 ( ) Starting conditions (X) Vapor pressure 5.296 (kPa.a) at PT (oC)

26 Service: (X) Continuous () Intermittent (Start/day) (X) Relative density (SG)


27 (X) Parallel operation required (6.1.11) Min/Nor/Max - / 1.02 / -
28 SITE AND UTILITY DATA () Specific heat, Cp (MJ/kgoC)

29 Location: (6.1.28) (X) Viscosity 1.0 (cP) at PT (oC)

30 ( ) Indoor () Heated () Under roof () Max viscosity (cP)


31 (X) Outdoor (X) Unheated () Partial sides (X) Corrosive / Erosive agent (6.12.1.9) Salt
32 ( ) Grade () Mezzanine () (X) Chloride concentration 16000 (ppm)
33 (X) Electrical area classification (6.1.22) N.A () H2S concentration (6.12.1.12) N.A (ppm)
34 Zone Gas Gr. Class Liquid () Hazardous () Flammable () Other
35 ( ) Winterization required (X) Tropicalization required
36 Site Data (6.1.28) Refer to 195363-01-PHY-0001 PROCESS BASIS OF DESIGN PERFORMANCE
37 (X) Altitude sea level (m) Barometer 102 (kPa.a) Proposal curve No. () RPM 1490 B
o
38 (X) Range of ambient temp: Min/Max 13.8 / 40 ( C) () Impeller dia. Min/Rated/Max 428 / 450 / 463 (mm)
39 (X) Relative humidity: Min/Max / 87 (%) () Rated power 233.6 (kW) Efficiency 77.2 (%)
40 Unusual conditions: (6.1.30) (X) Dust () Fumes (X) Min. continous flow:
41 (X) Other Marine location, humid, salty environment, Brackish water Thermal (m3/h) Stable 1030 (t/h)
42 (X) Utility conditions () Preferred operating region 1190 to 2060 (t/h)
43 Steam: N.A Drivers Heating () Allow. operaing region 1030 to 2060 (t/h)
o o
44 Min. (MPa.g) ( C) (MPa.g) ( C) () Max. head @ rated impeller 66.3 (m)
45 Max. (MPa.g) (oC) (MPa.g) (oC) () Max. power @ rated impeller 260 (kW) B
46 Electricity: Drivers Heating Control Shutdown () NPSH required at rated cap. (6.1.8) 10.9 (m)
47 Voltage 6600 230 () Suction specific speed (6.1.9) *4) 1185 (rpm, m3/min, m)

48 Hertz 50 50 ()
49 Phase 3 1 () Est. max. sound press. Level (6.1.14) (dBA)
50 Cooling water: (6.1.17) Remarks *1) at based on LWL (EL -3340mm) LWL
o
51 Temp. Inlet/Max return / ( C) *2) to be based on LWL (EL -3340mm)
52 Press. Nor/Dsn / (MPa.g) *3) to be based on HWL (EL +1580mm) B
53 Min. return/Max dp / (MPa.g) *4) to be less than 1300.
54
55 Remarks *5) Continuous 120%. 150% of capacity at rated flow will be considered as temporary operating within 1~2 minutes once per year.
56 *6) Shut-off discharge pressure shall be lower than 151% of pressure at rated flow with 10% API tolerance.
57
58
59

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 3 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 CONSTRUCTION
2 Applicable standard: Couplings: (7.2.3)
3 (X) API 610 11th edition, where applicable (X) Make JOHN CRANE B
4 ( X) Other 195363-02-SPE-0007 Specification for RIVER WATER SUPPLY PUMP (X) Model TLKS B
5 () Coupling rating (kW/100rpm) 300
6 Pump type: (4.2.2) (X) Lubrication Dry disc type
7 () OH2 () BB1 (X) VS1 () VS6 () Limited end float required
8 () OH3 () BB2 () VS2 () VS7 (X) Spacer length 240
9 () OH6 () BB3 () VS3 () Other (X) Service factor 1.66
10 () BB4 () VS4 Driver half coupling mounted by:
11 () BB5 () VS5 (X) Pump mfr () Driver mfr () Purchaser
12 () Coupling per API 671 (7.2.4)
13 ( ) Nozzle connections: (6.5.5)
14 Size Rating Facing Position Baseplates:
15 Suction bellmouth bottom () API baseplate number (Appendix M)
16 Discharge *1) DN450 150# FF side () Non-grout construction: (7.3.13) B
17 Balance drum
18 Pressure casing connections: (6.4.3.2) Remarks:
19 No. Size Type
20 ( ) Drain
21 (X) Vent (Air release valve) 1 DN25 FLANGE (ASME B16.5 150LB RF) MATERIAL B
22 ( ) Press. gauge () Appendix H class (6.12.1.1) - D-1
23 ( ) Temp. gauge () Min. design metal temp (6.12.4.1) 0 (oC)

24 ( ) Warm-up (X) Barrel/case ASTM A890M Gr.1B


25 ( ) Balance/Leak-off (X) Impeller ASTM A890M Gr.1B
26 ( ) Cylindrical threads required (6.4.3.8) (X) Case/impeller wear rings UNS S31803
27 (X) Shaft UNS S31803
28 Casing mounting: (X) Diffusers ASTM A890M Gr.1B
29 () Centerline () Near centerline () Coupling spacer/hubs
30 () Foot () Separate mounting plate () Coupling diaphragms (disks)
31 () In-line (X) Vertically suspended on wet pit (X) Suction strainer DSS
32 Casing split: (X) Column UNS S31803
33 () Axial (X) Radial (X) Discharge head UNS S31803 + SS400+UNS S31803 lining B
34 Casing type: on pedestal base plate
35 () Single volute () Multiple volute (X) Diffuser (X) Baseplate SUS316L
36 () Overhung () Between bearings () Barrel ()
37 Case pressure rating: Remarks: All parts contacting river water to be Duplex stainless steeel as minimum.
38 () Max.allowable working press. 0.8 (MPa.g)

39 at 65 (oC)

40 () Hydrotest press.(1.5 x MAWP) 1.2 (MPa.g) BEARING AND LUBRICATION


41 ( ) Suction press. Regions must be designed for MAWP (6.3.6) Bearing (Type/Number)
42 Rotation: (Viewed from coupling end) (X) Radial *2) Sleeve /
43 (X) CW () CCW (X) Thrust BALL
44 (X) Impeller individually secured (9.2.2.1) (X) Review and approve thrust bearing size (9.2.5.2.4)
45 Remarks:
46 *1) ASME B16.5 Lubrication: (for thrust bearing)
47 () Grease (X) Flood () Ring oil
48 () Flinger () Purge oil mist () Pure oil mist
49 (X) Constant level oiler preference (6.10.2.2)
50 ( ) Bolt OH3 pump to pad/foundation (9.1.2.2) () Pressure lube sys () API-610 () API-614
51 (X) Oil visc. ISO grade VG46
52 Shaft: () Oil heater req'd () Electric () Steam
53 ( ) Shaft diameter at coupling (mm) ( ) Oil press to be greater than coolant press
54 ( ) Shaft diameter between bearings (mm) Remarks: *2) Line shaft bearings to designed for dry startup (no prelubrication before startup).
55 ( ) Span between bearing centers (mm) B
56 ( ) Span between bearing & impeller (mm)
57 Remarks:
58
59

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 4 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 MECHANICAL SEAL (N/A) Seal flush piping: NA
2 Seal data: (6.8) NA () Seal flush piping plan
3 () See attached API-682 data sheet () Tubing () Carbon steel
4 () Non-API 682 seal () Pipe () Stainless steel
5 () Appendix H seal code () Auxiliary flush plan
6 () Seal manufacturer () Tubing () Carbon steel
7 () Size and type / () Pipe () Stainless steel
8 () Manufacturer code
9 () Piping assembly:
10 Seal chamber data: () Threaded () Unions () Socket welded
o
11 ( ) Temperature ( C) () Flanged () Tube type fittings
12 ( ) Pressure (MPa.g) ( ) Pressure switch (Plan 52/53) Type
13 ( ) Flow (m3/h) ( ) Pressure gauge (Plan 52/53)
14 ( ) Seal chamber size () Level switch (Plan 52/53) Type
15 ( ) Total length (mm) () Clear length (mm) ( ) Level gauge (Plan 52/53)
16 () Temp. indicator (Plans 21,22,23,32,41)
17 Seal construction: () Heat exchanger (Plan 52/53)
18 ( ) Sleeve material
19 ( ) Gland material Remarks:
20 ( ) Aux. seal device
21 ( ) Jacket required
22
23 Gland taps: N.A
24 ( ) Flush (F) () Drain (D) () Barrier/buffer (B)
25 ( ) Quench (Q) () Cooling (C) () Lubrication (G)
26 ( ) Heating (H) () Leakage () Pumped fluid (P)
27 ( ) Balance fluid (E) () External fluid injection (X)
28
29 Seal fluids requirement and available flush liquid: N.A
30 Note: If flush liquid is pumpage liquid (as in flush piping
31 plan 11 to 41), following flush liquid data is not req'd. Packing data:
o
32 ( ) Supply temp. Max/Min / ( C) Manufacturer NIPPON PILLAR PACKING CO., LTD. B
33 ( ) Relative density (SG) at (oC) Type Gland Packing
34 ( ) Name of fluid Size 104X79X12.5 No. of rings 5 B
o
35 ( ) Specific heat, Cp (MJ/kg C) () Packing injection required
o
36 ( ) Vapor press. (MPa.a) at ( C) () Flow (m3/h) at (oC)

37 ( ) Hazardous () Flammable () Other () Lantern ring


38 ( ) Flow rate, Max/Min / (m3/h)

39 ( ) Press. req'd, Max/Min / (MPa.g) Remarks:


40 ( ) Temp. req'd, Max/Min / (oC)

41
42 Barrier/buffer fluid N.A
43 ( ) Supply temp. Max/Min / (oC) STEAM AND COOLING WATER PIPING
44 ( ) Relative density (SG) at (oC) () Cooling water piping plan N/A B
45 ( ) Name of fluid () Cooling water requirements
o
46 ( ) Vapor press. (MPa.a) at ( C) Seal jacket/BRG hsg (m3/h) at (MPa.g)

47 ( ) Hazardous () Flammable () Other Seal heat exchanger (m3/h) at (MPa.g)

48 ( ) Flow rate, Max/Min / (m3/h) Quench (m3/h) at (MPa.g)

49 ( ) Press. req'd, Max/Min / (MPa.g) (m3/h) (MPa.g)


o
50 ( ) Temp. req'd, Max/Min / ( C) (m3/h) (MPa.g)

51 Total cooling water (m3/h)

52 Quench fluid: N.A () Steam piping: () Tubing () Pipe


53 ( ) Name of fluid
54 ( ) Flow rate (m3/h) Remarks:
55 Remarks:
56
57
58
59
NOTE

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 5 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 INSTRUMENTATION VERTICAL PUMPS
2 Vibration: Vertical type (X) VS1 () VS2 () VS3
3 (X) Noncontacting *1) (X) Transducer *2) () VS4 () VS5 () VS6 () VS7 () Other
4 () Provision for mounting only (6.10.2.10)
5 () Flat surface req'd (6.10.2.11) (X) Pump thrust: (+) up (-) down
6 () See attached API-670 data sheet at min. flow - (kg) 1240 (kg) B
7 () Monitors and cables (7.4.2.4) at rated flow - (kg) 1010 (kg) B
8 at max. flow - (kg) 290 (kg) B
9 Remarks: *1) Two sensor for KEY PHASOR. max. thrust 161 (kg) 1610 (kg) B
10 *2) mounted on thrust bearing one Accelerometer (X) Soleplate OD x ID 1480 (mm) x 1100 (mm) B
11 (X) Soleplate thickness 50 (mm) B
12
13 Temperature and pressure: Column pipe: (X) Flanged () Threaded
14 ( ) Radial bearing metal temp. () Thrust bearing metal temp. Diameter 450 (mm) 1.66(4 pcs), 1.55(1 pc) (m) B
15 ( ) Provision for instruments only
16 ( ) See attached API-670 data sheet Guide bushing:
17 ( ) Temp. gauges (with thermowells) (9.1.3.6) (X) Material ELASTOMERIC POLYMER ALLOY B
18 (X) Other Thrust Bearing oil Temp (X) Number 5 B
19 ( ) Pressure gauge type (6.4.1) (X) Line shaft bearing spacing 110 (mm) B
20 Location Guide bushing lube: () Water () Oil
21 () Grease (X) Pumpage
22 Remarks: Line shaft: (X) Open () Enclosed
23 () Line shaft dia: 80 (mm) ( ) Tube dia: NA (mm)
24 Line shaft coupling:
25 (X) Sleeve & key () Threaded
26 () Suction can thickness NA (mm)
27 SPARE PARTS (TABLE 18) () Length (m)
28 ( ) Start-up () Normal maintenance () Diameter (m)
29 (X) Specify Required supply below
30 1. Spare parts for installation, commissioning, start-up and Consumable () Suctions strainer type
31 2. Spare parts for 2 years operation () Float & rod () Float switch
32 () Impeller collets acceptable (6.6.3)
33 MOTOR DRIVE 7.1.1/ 7.1.4) () Hardened sleeves under bearings (9.3.10.5)
34 (X) Manufacturer Hyundai (X) Resonance test (9.3.9.2)
35 (X) 270 (kW) ( ) 1486 (rpm) () Structural analysis (9.3.5) B
36 (X) Horizontal (X) Vertical () Drain piped to surface (9.3.13.5)
37 (X) Frame 315 B
38 (X) Service factor 1.0 (X) Sump depth 9.8 (from sump bottom to pump sole plate botom) (m) B
39 (X) Volts/Ph/Hz 6600 / 3 / 50 (X) Pump length 9.35 (from ground elevation to suction bell) (m) B
40 (X) Type Squirrel cage (X) Min. pump start-up level 2.76 (from suction bell bottom) (m) B
41 ( ) Enclosure IP 55, Non-explosion proof (X) Min. pump down level 2.26 (from suction bell bottom) (m) C
42 (X) Min. starting voltage (7.1.5) 75% Remarks:
43 (X) Temperature rise 80
44 (X) Full load amps 29.2 A B
45 (X) Locked rotor amps 550%, 160.6 A B
46 (X) Insulation F
47 (X) Starting method DOL B
48 (X) Lube DE: Grease, NDE: Grease B
49 ( ) Vertical thrust capacity
50 Up (kg) Down (kg)
51
52 Bearings (Type/number)
53 (X) Radial DE side: Ball bearing / 6320C3 B
54 (X) Thrust NDE side: Angular contact ball bearing / 7219BDB B
55
56 Remarks: 1) BHP: 233.6 kW B
57 2) Power factor: 0.85@100 % load B
58 3) Space heater rating: 1 Ph., 230V, 150W B
59 4) Winding: 2 x single RTD (Pt 100) / phase, Bearing: 1 x dual RTD (Pt 100) / bearing B
NOTE

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 6 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 SURFACE PREPARATION, PAINT & SHIPMENT QA INSPECTION AND TEST (*1)
2 () Manufacturer's standard (X) Review vendors QA program (8.1.6)
195363-02-SPE-0014
3 (X) Other SPECIFICATION FOR PAINTING AND PROTECTIVE COATING (X) Performance curve approval
4 Pumps: (X) Shop inspection (8.1.1)
5 () Surface prep. (*1) () Primer (*1) () Test with substitute seal (8.3.3.2.6)
6 () Finish coat (*1)
7 Baseplate: Test Non-wit Wit Observe
8 () Surface prep. (*1) () Primer (*1) Hydrostatic (9.3.13.2) () (X) ()
9 () Finish coat Performance (7.3.3) () (X) ()
10 Shipment: (8.4.1) NPSH (7.3.4.2) () () ()
11 ( ) Domestic () Export (X) Export boxing required Complete unit test (7.3.4.3) () () ()
12 (X) Outdoor storage more than 6 months (As per 195363-02-SPE-0007) Sound level test (7.3.4.4) For reference () () ()
13 Spare rotor assembly packaged for: () Cleanliness prior to () () ()
14 ( ) Horiz. storage () Vert. storage final assembly (7.2.2.2)
15 ( ) Type of shipping preparation () Nozzle load test (6.3.6) () () ()
16 Remarks: () BRG hsg resonance () () ()
17 test (7.3.4.6)
18 () Remove/inspect
19 WEIGHT hydrodynamic bearings after test (8.2.7.5)
20 Motor driven () Auxiliary equipment () () ()
21 Pump Approx.4600 (kg) test (7.3.4.5)
22 Baseplate Approx.320 (kg) (X) Dismantle inspection () (X) () B
23 Driver Pedestal Approx.1400 (kg) ( ) () () () B
24 Motor Approx.2200 (kg) ( ) () () () B
25 Gear (kg) ( ) () () ()
26 (kg) (X) Material certification req'd (5.12.1.8)
27 Total weight Approx.10220 (kg) (X) Casing (X) Impeller (X) Shaft
28 Turbine driven N.A (X) Other Welding rod.
29 Baseplate (kg) ( ) Casing repair procedure approval req'd (5.12.2.5)
30 Turbine (kg) (X) Inspection required for connection welds (5.12.3.4 e)
31 Gear (kg) () mag. particle (X) Liquid penetrant
32 (kg) () Radiographic () Ultrasonic
33 (kg) (X) Inspection required for casting (5.12.2.3 a)
34 Total weight (kg) () mag. particle (X) Liquid penetrant *2)
35 Remarks: *1) Refer to Doc. No. 195363-EBA-02-PRO-0005 () Radiographic () Ultrasonic B
36 PAINTING AND RUST PREVENTION PROCEDURE (X) Additional inspection required for: (7.2.1.3)
37 upper / intermediate / lower shafts
38 OTHER PURCHASE REQUIREMENT () Mag. particle () Liquid penetrant
39 (X) Coordination meeting required (10.1.3) () Radiographic (X) Ultrasonic
40 (X) Review foundation drawing (X) Additional inspection required for: (7.2.1.3)
41 (X) Review piping draiwing Casing for fabrication
42 (X) Observe piping check () mag. particle () Liquid penetrant
43 (X) Observe initial alignment check (X) Radiographic () Ultrasonic
44 ( ) Check alignment at operating temperature () Alternative acceptance criteria (See remark) (7.2.2.1)
45 ( ) Connection design appoval (9.2.1.4) () Hardness test required for: (7.2.2.3)
46 ( ) Rigging device req'd for type OH3 pump (9.1.2.6)
47 ( ) Hydrodynamic thrust BRG size review req'd (9.2.5.2.4) () Wetting agent hydrotest (7.3.2.5)
48 ( ) Lateral analysis required (9.1.3.4/ 9.2.4.1.3) (X) Vendor submit test procedure (7.3.1.2/ 9.2.5)
49 ( ) Rotor dynamic balance (9.2.4.2) (X) Record final assembly running clearance
50 ( ) Mount seal reservoir off baseplate (7.5.1.4) () Inspection check-list (Appendix E) (7.1.6)
51 (X) Installation list in proposal (10.2.3.L) Remarks: *1) Refer to PROJECT Doc. No.: 195363-EBA-02-ITP-0001 INSPECTION AND TEST PLAN FOR PUMP. B
52 ( ) Spare rotor vertical storage (9.2.8.2) *2) PT for pump impeller.
53 ( ) Torsional analysis / report (6.9.2.10)
54 (X) Progress reports required (10.3.3)
55 (X) Vendor demonstration of max. allowable vibration at min. flow.
56 (X) Critical speed analysis
57 ( ) Pump structure strength calculation
58 Remarks:
59
NOTE

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 7 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1
2 General Notes:
3
4 1. Impeller and lineshaft coupling shall be keyed.
5
6 2. Guaranteed, radial and thrust bearing life shall be as per the requirement of API610.
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
NOTE

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL


Company: PROJECT Doc. No.: 195363-02-DS-0001
PETROVIETNAM GAS JOINT STOCK CORPORATION VENDOR Doc.No.: R2002030-5161-0101
PVGAS PROJECT MANAGEMENT COMPANY'
Contractor Rev.0
SAMSUNG C&T-PTSC CONSORTIUM Page 8 of 8
Document Title: Rev
Mechanical Data sheet for River water supply Pump (TS-P-11 01A/B/C)
1 [ All units : mm ]
2
3
4
5
6
7
8
800
9
750
10
Revi
11
ew
12
13
14

50
15
3985

16
17
18 3850

300
19
20
A
850

21 EL+3300
22
23
Φ1480
24

1420
25 EL+1580

6340
6390
26
27
28
EL- 3340
29
30
31
9400

32
9500

33
34
35
36
2260

37
38
39
40
41
42
300

43
400

44
Φ720
45
46
47
48
49
50
51

52

53

54

55

56

57

58 DETAIL A
59
NOTE

COMPANY : Project Title: CONTRACTOR :

THI VAI LNG RECEIVING TERMINAL

You might also like