This document is a HIRARC (Hazard Identification, Risk Assessment and Risk Control) form for an antenna installation job. It identifies climbing a vertical ladder as a hazard that could cause a slip and fall or fatality. The existing risk level is rated as high (15) due to the likelihood (3) of a slip and a severity (5) of a potential fatality. Recommended risk controls include training, use of personal protective equipment like a harness and lanyard, and wearing a helmet. The form was prepared by a technician, approved by the director, and revised on March 24th, 2022.
This document is a HIRARC (Hazard Identification, Risk Assessment and Risk Control) form for an antenna installation job. It identifies climbing a vertical ladder as a hazard that could cause a slip and fall or fatality. The existing risk level is rated as high (15) due to the likelihood (3) of a slip and a severity (5) of a potential fatality. Recommended risk controls include training, use of personal protective equipment like a harness and lanyard, and wearing a helmet. The form was prepared by a technician, approved by the director, and revised on March 24th, 2022.
This document is a HIRARC (Hazard Identification, Risk Assessment and Risk Control) form for an antenna installation job. It identifies climbing a vertical ladder as a hazard that could cause a slip and fall or fatality. The existing risk level is rated as high (15) due to the likelihood (3) of a slip and a severity (5) of a potential fatality. Recommended risk controls include training, use of personal protective equipment like a harness and lanyard, and wearing a helmet. The form was prepared by a technician, approved by the director, and revised on March 24th, 2022.
Job Proses / Location: Pemasangan antenna /antenna installation Designation: Technician riger, boss Date Prepared: 21/3/22 Approved by: Director Date Review: Date Approved: 24/3/22 Revision Date:
Hazard Identification Risk Analysis Risk Control
No Likelih Severi Recommended Control Job Activity Hazard Which can cause / effect Existing Risk Control ood ty Risk PIC / Date / Status . Measure Training wah, medical 1 Climbing vertical ladder Tangga licin, Slip N fall / fatality Tiada, no 3 5 15 PPE harness, Y lanyard Helmet Training wah, medical 2 = = = PPE harness, Y lanyard Helmet 1 2 2 -
3 platform
Climb down 4 vertical
Likelihood Severity Risk Level Risk Control
1 – Unlikely (Exceptional) 1 – Insignificant (Near Miss, discomfort) 1–4 Low 1 – Eliminate 2 – Low Probability (yearly) 2 – Minor (3 days or less MC) 5 – 12 Medium 2 – Substitute 3 – Possible (monthly) 3 – Moderate (More than 3 days MC) 15 – 25 High 3 – Isolation 4 – High Probability (weekly) 4 – Major (Permanent Disability) 4 – Engineering Control 5 – Almost Certain (daily) 5 – Catastrophic (Fatality) 5 – Administrative Control 6 – PPE