You are on page 1of 2
b Qo8edd0u mand BEAT O30 Costam mUarn0an cec WHS GurpBulusd 2 srgionownt vovoluss.d CENTRAL ENGINEERING CONSULTANCY BUREAU Ga ti Diaclo 8, wore 7B cm ‘tine dane [Talephene 2648800 Fox: 2657368 eS 415, Guapgrdara wraion, Gn 07, Batis eo @cecbs. FER “Sop 415 Bauddhalota Mawatha, Colombo #7. Se Lanka Sebati wneeaecblk Your ot. wae CECB/CPCDP/JAEQR/CON!2019319. 30" July, 2019 i ng Houliang, Managing Director, (CHEC Port City (Private) Limited, 4" and 5" Floors, Central Point Building, No. 54, Chatham Street, Colombo 01. Mr. Nihal Fernando, Project Director, Ministry of Megapolis & Western Development, 12th Floor, Sethsiripaya Stage ll, Baththaramulla. Dear Sir, COLOMBO PORT CITY DEVELOPMENT PROJECT for Infrastructure and Landscape Works Sub: Concrete Mix Design Proposal Mix-38 (C40) Reference is made to your letter No. CPCC/CECB/MP/014263 dated 24" July, 2019, We, herewith submit our review and comments on the above document for your information and necessary action please. Yours faithfully CENTRAL ENGINEERING CONSULTANCY BUREAU GHEE. Eng. GEL. Kumarasiri Team Leader - JAEQR Copy: Sceretary, Minstry of Megapolis & Western Development Fg BP Conaduage, Dy rajeet Director (Reclamation), Colomiba Port City Development Project. (MWD) Eng. C. Wijeraane, Dy Project Director (Structures), Colombo Port City Development Prowect, (MM&WD) (Me, Zao Shika (ice), Auhorized Representative, CHEC Por City (Private) Limited Ene GD. A, Piyathiaka. Charman, Central Engineering Consltaney Bureas, (CECB) eg TD, Wickramamathna, General Marager, Central Engineering Ceneltancy Bureay, (CECB) Eng. A. Galketya, Depuy Team Leader! AGM (Si2/ntemationall, Central Engineering Consultarcy Bureas, (CECE) 1957 qo 49 (Ses dado antiOn odds one wor autdO0d 090.8 w.8LOD w9 wB2d gormenins 1B9F gm 7 oe sDSACpnAt an GioTUANHaTed oC pf ‘BpNi-o wana eet? wage aii oom Established Under the State ndustial Corporations AcL 49 of 1857 [MNISTRY OF MAHANEL DEVELOPMENTAND ENVIRONMENT ‘COLOMBO PORT CITY DEVELOPMENT PROJECT INFRASTRUCTURE & LANDSCAPE WORK, JAEQRIDR-149 Document Review ‘Submission ‘Conerete Mix Design Proposal Mix-33 (C40) Reference CPCC | CPCCICECB/MP/014263 Date 25" July. 2019 Received Type/Structure | CHEC Ready Review Document: Conerete Mix Design Proposal Mix-33 (C40) Doe. No: DR -149 Date/s Reviewed: 27" Tuly, 2019" ‘Review and comments Mis reference is not given Used standard deviation of + MPa is acceptable (* 3.5 Mpa) Cement: Insee extra — Acceptable & Approved by the Engineer, Cement Content: Acceptable WIC is acceptable Slump; design slump Course aggregate content — Acceptable Adimixture LRPS 3008 Acceptable & Approved by the Engineer Sana vee PS Accordingly, we have no objection for proceeding with laboratory trial mix testing subject to providing the mix roference as given in the specifications of the project. Consent without comments Consent with comments ” No Consent ” 5 3? X_|Coasent with comments 1) Comments to be addressed in official response and/ or update of submission 2) No official response and/or update of submission required 3) Comments to be addressed in full resubmission Reviewed by: Checked by: GH. GE iri Resident Engineer-Civil ‘Team Leader-JAEQR JAEQR/QMSO14

You might also like