- CDO FACTORY
10. DELIVERY TO Accepted Finished Physical Appearance Visual Random 100% Approved Project
11. ERECTION / FIT- Accepted Finished Dimensions Visual Random 100% Approved Project
Joint Preparation
Gap Provision
Alignment of Parts
Location: Brgy. Tablon, Cagayan de Oro City
9.1 Carbon steel pipes shall be segregated with other special alloy C C S
pipes.
10.2 Materials shall not be unloaded by free fall from trucks or trailers C C S
11.1 Dimensions, location of parts and orientation of parts shall conform D/C C W
11.4 Internal and external surfaces to be welded shall be clean and free C C W
from paint, oil, rust, scales and other mateials that would be
detrimental to either the weld or the base metal when heat is applied.