Abstract
Gas turbine generator 2.3 Tanjung Priok Combined Cycle Power Plant was fault. There was a short circuit on
stator winding bar phase R. Short circuit was caused by insulation failed. End winding junction of bar number 15
was melted. The result of this phenomenon is decreasing of some bars volume. Decision had already made;
eliminating the broken bars because it has lower risk than bar welding/ connecting. Two turns (4 bars) of
winding phase R was cut and so did another phase (S & T) for voltage balancing. The new bypass connection
was made to connect the normal winding. The result, 12 of 120 bars had already eliminated. Elimination of
these bars consequence at 10% drops of generator output voltage. Overcome this consequence; ratio changing
was made at Main Transformer’s tap changer to compensate the lower generator output voltage. The Main
Transformer’s output voltage became equal with transmission voltage. Tap changer ratio in Auxiliary
Transformer was also changed for gain an auxiliary voltage same as before. Resetting generator protection
relay and excitation system was done in order to match between old and new generator value and made
generator and gas turbine operation safer. Control and evaluation of generator operation after elimination
process have been made. Generator has been operating normal and safely although it was not in maximum
rate until now (5 months). We hope this paper can give inspiration to face the generator problem in other power
plants.
2. Objective
• To recover the generator condition as soon as Fig 2. Stator wiring
possible
• To decide what the optimal way to recover 4. Problem
generator End winding junction of bar number 15 was melted
• To anticipate the operation character after and it caused decreasing volume of some bars.
recovery Generator must operate in normal and safe
condition as soon as possible.
3. Generator GT 2.3 Priok CCPP
Specification of generator GT 2.3 Tanjung Priok 5. Solution
Rated apparent power : 210 MVA It was decided to eliminate bar number 15 in one
Rated active power : 168 MW turn (2 bars) because it had lower risk than bar
Rated power factor : 0.8 welding. We could account the effect of bar
Rated voltage : 15.750 kV (+/- 7.5%) elimination but it couldn’t for bar welding. The
6. Basic Elimination wk p kd
Basic concept of elimination process is decreasing k =
the number of some winding bars. 4 bars (2 turns) 2
of phase R were cut and isolated. For voltage wk p kd
balancing, other phases were cut for the same k ' = 0 .9 ×
2
number of bars.
S ' = 0 .9 × k × A × B × d 2
× l × n
S = 0 . 9 × 210 MVA
'
12. Suggestion
Elimination process of stator winding bars is
Phase T = 0.69 nC
applicable for other power plant if the
Fig 6. Partial discharge value compensation factor for it process are feasible.
Rp 14. Biographies
= 321 . 46 × 24 × 180 × 100 MW Tri Tjahjonoputro, Buyung Arianto, and Wasis
kWh
Jati Waskitho are employed by Indonesia Power,
= Rp 138 ,870 , 720 , 000 , − Tanjung Priok Generating Business Unit,
= USD 15 , 094 , 695 Maintenance Department, based in Tj. Priok
Jakarta
Other benefit of this project was generator
operation increase the reliability of interconnection Email address :
system especially in Region 1 Java-Bali tri.tjahjonoputro@indonesiapower.co.id
interconnection. buyung.arianto@indonesiapower.co.id
wasis.jw@indonesiapower.co.id
11. Conclusion
− Decreasing volume of stator bars generator in
GT 2.3 Tanjung Priok CCPP occurred
because of end winding junction melting
− Stator bar elimination was done in generator
winding GT 2.3 to recovery its generator