please wear high-temperature gloves, protective mask and protective glasses to avoid being
scalded by the splattered solder or the surface of the machine heating device.
2. Before using equipment, and shall ensure that the power supply security, this machine use 380 v,
three-phase four-wire system, namely the three phase line and a ground wire, Mr Abe's order
requirements, and pay attention to the power supply capacity is greater than the native maximum
power, ensure the fuselage, industrial touch screen, PLC and other reliable connect to, in order
3. The main power supply and the UPS power switch should be cut off during machine maintenance to
avoid electric shock accidents caused during maintenance. The control loop is supported by the
UPS power supply. When the main loop is cut off, the single-phase alternating current of UPS
inverter will ensure the safe transport of PCB and the normal shutdown of PLC.
4. Do not move violently when lifting and rolling out of the tin stove, so as not to splash solder o
ut of the tin stove and scald the operator and the surface of the machine.
5. During the normal operation, the machine will produce smoke and harmful gases, should be
installed exhaust ventilation system, avoid opening glass doors and Windows.
6. When the machine is running, make sure the door of the electric box is closed and the window door
7. When lifting the preheating cover, the support rod should be checked to ensure that the cover
does not fall off. "three nos" should be done: do not hurt yourself, do not hurt others, and do
8. Flux and solvent are inflammable, firework should be strictly prohibited, and fire extinguishing
equipment should be set up near the machine.
9. Operators are strictly prohibited to wear loose clothes, ties and long hair to avoid being
10. Electrical maintenance shall be performed by qualified electrical technicians, and care shall be
taken to ensure that the warp source and UPS power supply are cut off before maintenance, and
care shall be taken not to plug or unplug any interface or plug while it is still live.
11. No one other than the machine management and operation personnel shall operate the machine
without authorization to avoid unnecessary losses.
12. During the process design and incoming plate inspection, we should ensure that the spare parts
do not fall off, so as to avoid causing tin-blasting or blocking the filler and causing
unnecessary losses. During the maintenance of the tin furnace, we should ensure that the machine
has stopped running, and pay attention to avoid dropping tools and accessories, The impeller is
stuck in the tin slot and the nozzle is blocked.
The equipment
(automatic system)
is as follows:
Log out/monitor
(group leader > and engineer >, according to the user box can be changed (gro
ypad,and the original password can be changed if the password is entered corr
I
s' H
5
function can be opened manually in the pull out I panel.
When the PCB board passes the inlet photoelectricity and
then falls into the hot air area, press the "g" key to
exitIf there is no photoelectric inductance, the alarm
function will be activated, and report the jian removal
as confirmed.
5
System time setting
: s --
Note: Record the PCB name, plate number and each hot air
zone, upper preheating and tin tank temperature, as
well as the height of the solder tank of the conveyor
belt and other conditions.
A b n o r m a l
d i s p l a y
Now the
temperature
Temperature
setting
SEL button about 1 second show Stby, press grand until show
AT, press SEL button show 0 and flash, press train key set as I
Lead-free
tin bath
1. Power supply: 3 + 380V.
model).
13, T h e a d j u s t m e n t o f t h e t i n s l o t i s c o n t r o l l e d b y t h e
operator.
Ventilation safety:
Do not operate the machine when the exhaust system is not working.
nitrogen is used.
Understand local rules:
The contents of this section shall not be used to replace the
Pressure device
circuit.
Connection
and then click crick nitrogen on the touch screen to start it.
1. I n s t a l l a s t r a i n e r b e t w e e n t h e n i t r o g e n l o o p a n d t h e o x y g e n
2. A d j u s t n i t r o g e n f l o w m e t e r t o S O P s p e c i f i c a t i o n v a l u e ( 8 - 1 5 m '
Vhr)
3. W h e n t h e s p e c i f i c g r a v i t y o f t h e o x y g e n a n a l y z e r s h o w s t h e