CHECK LIST DG Set
CHECK LIST DG Set
Date: 17/08/2023
Dear Sir,
With reference to above, requesting us to depute our Engineer for commissioning of above DG
Set. In this connection we give below our Standard Check List of jobs to be completed prior to
commissioning of the DG Set.
You are required to get confirmation from your site regarding completion of jobs mentioned in this
list and forward the same to us duly completed mentioning detailed site address, Contact
Person & Number for our records and further enabling us to depute our Engineer for
commissioning of the DG Set. Please note that incase the commissioning cannot be carried out
due to incomplete erection work then same will be done on any other day on chargeable basis.
Sr. Status
Description
No. Completed /
Not Completed
1. Positioning on Foundation, Completed
2. Exhaust piping (If required), Not Applicable
3. Outgoing Power Cable Termination up to Mains, Completed
4. Earthing 2 Body & 2 Neutral as per Electricity Board Completed
Requirement,
5. Initial Fill up of High Speed Diesel, Completed
6. Batteries Fully charged. Completed
(Please note that, Batteries are charged and will remain
healthy for 3 months from the date of dispatch.)
7. Control Cabling (For AMF / Special Panel only), Not Applicable
8. Requested Commissioning Date 28/08/2024