Productivity and Rate Analyis Sheets
Productivity and Rate Analyis Sheets
8 HRS
RESOURCES - LABOR AND EQUIPMENT
Sr. No. ITEM PRODUCTIVITY
Unit Qty LABOR EQUIPMENT
EXCAVATION & EARTHWORKS Operator Helper Labour Mason Shovel Digger Roller Compactor
1 Waterproofing Membrane m2
2 Polythene Sheets m2
3 Protection Screed m2
2 Wall shutter m2 22 1 1 1
3 Beam Bottom m2 14 1 1 1
4 Beam Sides m2 20 1 1 1
Page 1 of 8
LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper
9 Shear Walls
a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
d De-Shuttering m2
10 Columns upto 0.5 sqm in area (using fabricated forms)
a Formwork m2 14 2 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 9 1 2
d De-Shuttering m 2
Page 2 of 8
LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper
11 Beams
a Formwork m2 20 2 2
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 15 1 2
d De-Shuttering m 2
12 Slabs (Solid)
a Formwork m2 15 1 1
b Reinforcement (fabrication & fix) kg 200 1
c Concrete m 3
75 3 3
d De-Shuttering m2
13 Slabs (Hourdy)
a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
d De-Shuttering m2
14 Parapets
a Formwork m2 20 2 2
b Reinforcement (fabrication & fix) kg 175 1
c Concrete m 3
12 1 1
15 Cantilevers
a Formwork m2 12 1 1
b Reinforcement (fabrication & fix) kg 180 1
c Concrete m3 50 3 3
16 Stairs
a Formwork m2 15 1 1
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m3 20 1 1
17 Ramps
a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
18 Lintels
a Formwork m2 8 1 1
b Reinforcement (fabrication & fix) kg 180 1
c Concrete m 3
5 1 1
Page 3 of 8
LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
BLOCK WORK Block Mason Helper
Sub-Structure - Solid Blocks
1 200 mm Blockwork m2 12 1 1
Super-Structure (upto 3m height) - Solid Blocks
1 100 mm Blockwork with pointing m2 15 1 2
2 150 mm Blockwork with pointing m 2
Page 4 of 8
LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
TILING WORK Tiler Helper
1 Ceramic Floor Tiles m2 20 1 1
2 Ceramic Wall Tiles m 2
18 1 1
3 Ceramic Tile Skirting LM 40 1 1
4 Ceramic floor / wall tiles grouting m2 32 1 1
5 Ceramic claustra work m 2
6 1 1
6 Granite/Marble threshold No 10 1 1
7 Granite/Marble Floor Tiles m2 10 1 1
8 Granite/Marble Wall Tiles m 2
9 Terrazzo Tiles m2 20 1 1
10 Terrazzo Skirting LM 40 1 1
11 Terrazzo Treads & Risers LM 30 1 1
12 Floor Screed 50mm thick m 2
27 1 1
13 Interlocking Pavers m2 48 1 1
14 Kerbstone m 56 1 1
Page 5 of 8
LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
WOOD WORKS Joiner Helper
1 Wooden frames fixing for openings upto 5 m 2 nos 8 2 1
2 Wooden door shutters fixing (incl hardware) nos 5 2 1
3 Wooden Pergola m 2
Page 6 of 8
MEP LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
PLUMBING & DRAINAGE Plumber Helper
1 Water Supply Pipes (PEX) LM
2 Water Supply Pipes (PRP) LM
3 Valves & Accessories of varying diameter No
4 Water Booster Pumpset No 2 1 1
5 Water Transfer Pumpset No
6 Water Treatment with Accessories No
7 Storage Tank No
8 Water Heater No 3 1 1
9 Water Meter No
10 Waste Water Drainage Pipes & Fittings below grade LM
11 Waste Water Drainage Pipes & Fittings above grade LM
12 Sump Pumpset No
13 Drains & Grating No
14 W/C - Asian No 2 1 1
15 W/C - Western No 3 1 1
16 Shower set No
17 Urinal No
18 MOP sink No
19 Bidet No 3 1 1
Page 7 of 8
MEP LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
ELECTRICAL WORKS Electrician Helper
1 Duct Laying LM 50 1 1
2 P.V.C Conduits Layings LM 200 1 1
3 G.I Conduits Layings LM 50 1 1
4 Cable Pulling ( 10 to 50 Sq mm ) LM 100 1 1
5 Cable Pulling ( 50 to 90 Sq mm ) LM 50 1 1
6 Cable Pulling ( 100 to 200 Sq mm ) LM 30 3 5
7 Cable Pulling ( 200 Sq mm and Above ) LM 30 3 5
8 Cable Trays (100mm-300mm ) i/c Support System LM 50 1 1
9 Cable Trays (300mm-600mm) i/c Support System LM 40 1 1
10 Cable Trays (600mm-900mm) i/c Support System LM 30 1 1
11 Wiring LM 300 1 1
12 Termination No 50 1 1
13 DB Installation No 2 1 1
14 MDB/SMDB Installation No 1 4 2
15 LV Panels Installation No
16 Motor Control Centres No
17 Sockets Installation No 80 1 1
18 Switches Installation No 80 1 1
19 Light Fixtures Installation No 50 1 1
20 Earthing System No
21 Generator set No
22 Main Cable Laying LM
22 CCTV System No
23 Telephone Equipment Installation No 5 1 1
Page 8 of 8