Project Summary
1.3 Works
1. Project Summary
1.1. Project Summary
1.1.1. Purpose
Patrind hydropower project is to eliminate the electricity shortage and ensure the stable electricity
supply, as well as tackling the social and economic problems caused by the recent severe electricity
shortage in Pakistan, by installation of 150MW hydropower plant near the city of Muzaffarabad, 120km
away from Islabamad towards north east.
1.3. Works
1) Field Investigation
a) Site Surveying
b) Geological Investigation
c) Construction Material
1-1
Pakistan Patrind Hydropower Project
2) Basic Design
a) Review of Previous Study
b) Hydrological Analysis
c) Review of Optimal Size
d) Plan for Major Structure Facilities
3) Detailed Design
a) Design Criteria Preparation
b) Design Calculation Report
c) Layout of Powerhouse & Equipment Arrangement
d) Design Drawing Preparation
e) Detailed Design of Major Structures and Technical Consultancy for Safe Construction
f) Other Designs in detail
g) Hydraulic Model Test & Numerical Analysis
h) Etc.
4) Requests for Government Permits
1-2
1. Project Summary
■ D/S Cofferdam
◦ Type Earth Dam Earth Dam
◦ Dam Crest Level EL.739.0m EL.740.0m
◦ Dam Crest Width 3.0m 3.0m
Topographic Map Modified
&
◦ Dam Height 3.0m VAR. MAX 8.0m Results of Numerical
Analysis Applied
Upstream / Downstream
◦ Slope 1 : 1.5 / 1 : 2.0 1 : 1.5 / 1 : 2.0
Slopes
■ Weir
◦ Design discharge 4,061.1㎥/s 4,061.1㎥/s PMF
◦ Type Concrete Gravity Concrete Gravity
◦ Weir Crest Level EL.769.0m EL.769.0m
◦ Weir Crest Width 8.2m 8.2m
◦ Weir length 130.0m 130.0m
■ Spillway(Radial Gate)
◦ Overflow Weir Elevation EL.757.0m EL.757.0m
◦ Gate Size B13.0m×H10.33m×4units B12.0m×H10.33m×2units
Submerged Roller Submerged Roller
◦ Dissipation Type
Bucket Bucket
◦ Bucket Radius 6.5m 8.0m
■ Spillway(Under Sluice Gate)
◦ Overflow Weir Elevation - EL.745.0m
◦ Gate Size - B7.0m×H11.5m×2units
Submerged Roller
◦ Dissipation Type -
Bucket
◦ Bucket Radius - 8.0m
■ Intake Weir
◦ Design Discharge 153m3/s 166.26m3/s
◦ Type Box Culvert Box Culvert
◦ Size B12.0m×H9.0m×2EA B12.0m×H9.0m×2EA
Inlet(B6.0m×H9.0m×4EA
1-3
Pakistan Patrind Hydropower Project
)
■ Sandtrap
Flushing Flow (12.6m3/s)
Included and Plant Discharge
◦ Design Discharge 153m3/s 166.26m3/s Changed
(153.66 m3/s)
■ Steel Penstock
Inner Circular Section Inner Circular Section
◦ Type
(Steel lined) (Steel lined)
D=5.5m × 1EA, D=5.5m × 1EA,
◦ Size
D=3.2m × 3EA D=3.2m × 3EA
■ Powerhouse
◦ Size B38.2m×H43.6m×L66.0m B42.0m×H45.9m×L69.3m Center Line of Turbine
◦ Turbine center line EL. EL.645.865m EL.645.000m Changed
1-4
1. Project Summary
1-5
Pakistan Patrind Hydropower Project
1-6