Date: 14.10.2023
BACKGROUND:
Weekly Meeting with Gonzalez & Johanson
Final concept design (master plan) ready for next 25.10.2023 G&J
week – including first renderings (if possible from front,
back, lagoon, beach, swimming pool, restaurant,
lounge….)
Final concept design with all apartments (including 01.11.2023 JH
review of JH)
Follow up on Contract for Sergio 16.10.0223 JH/ Please send proposal with
Udo payment schedule
Concierge design and point of entry – need an 18.10.2023 G&J In Progress
impressive design
Back of House (basement) – we may need additional 18.10.2023 G&J In Progress
space for laundry etc. – will be optimized with
technical architects from Branding/ service partner
New Design in the back 18.10.2023 G&J In Progress
DISCUSSSION POINTS AND ACTION ITEMS 11.10.2023:
DISCUSSSION POINTS AND ACTION ITEMS DATE RESP STATUS
Lagoon design – include island concept and optimize 18.10.2023 G&J Done
design
Garden – can we connect Phase 1 with Phase 2 (walk way 18.10.2023 G&J Done
from swimming pool to beach area
Review window design - 18.10.2023 G&J Done
Roof Top concept for villa apartments in Building 3 18.10.2023 G&J In Progress
Concierge design and point of entry – need an impressive 18.10.2023 G&J In Progress
design
Back of House (basement) – we may need additional space 18.10.2023 G&J In Progress
for laundry etc.
Review and optimize Sauna Spa concept 18.10.2023 G&J Done
Can we have plot next to ours (acquisition or long term TBD G&J
lease) – would be ideal for concierge
First Façade Review 08.10.2023 UH Under
Process
Change the master plan and move Studios to Building 1 – 11.10.2023 G&J Done
use 12 Studios (6 times 2 beds)
Schedule meeting with Mayor and Town Hall beginning TBD All 1st week
November – ask Sergio to organize Nov
Review/ optimize locations for Studios and adjust in the 29.09.2023 G&J Done
drawings, Change the master plan and move Studios to
Building 1 – use 12 Studios (6 2 beds)
Provide name of Lagoon provider. Provide Name 28.09.2023 G&J Done
First Façade concept design ready by next week 04.10.2023 G&J Done
Provide drawings with m2 measurements for each room 29.09.2023 G&J Done
Schedule meeting with Townhall and Mayor for end of next 04.10.2023 G&J
month – first week November (Sergio)
Façade for first building ready including rendering in 2 weeks 01.10.2023 G&J Done
– please send first draft ASAP