TR-MEC-003/10/2022
Trouble report Production Maintenance Penomoran d
Spv Group (C) Manager Check Prepared TR-ECI-001
Date : 29 / 10 / 2022 / Saturday S. Ullum Andriyanto A. Fauzi Yusuf H TR (Troub
Stop time : 14.30 - 16.06 ( 96 minute ) ECI (Electr
001 (No. ur
dari 001)
1. Place of occurrence : Rolling 29/10/2022 29/10/2022 29/10/2022 08 (bulan)
2018 (tahun
Equipment : Looper 4

2. Occurrence situation
Time Situation
14:30 Roling team inform mechanic any missroll at stand 16-17 and told to check looper 4

14:35 we checked looper 4 and test run

14:40 we found looper cylinder not down full, because piston and rod loosen.

14:45 mechanic team change cylinder looper

16:00 mechanic team finish change cylinder and test run ok

16:06 production start

3. Cause of trouble
* Missroll at dellivery stand 16 because rod Looper kicker no. 4 was loose
* Causes of rod loosen is under investigation.

Cylinder not Lock rod was


down full loosen

4. Measure of trouble
1 Change cylinder Looper

Next Countermeasure
* Attach Loctite for Tightening Lock Rod Piston

5. Responsibility by : Mechanic
殿 課 長 掛 長 作業長 班 長

故 障 報 告 書

日 時 年 月 日 時 分 停止時間 ° ′ 設備課電気班 氏名
設 備 名
故 障 状 況 (簡潔明瞭に) (図示も可)

復 旧 時 分
故障の原因

処置及び今後の対策

故障に対する所見
班長

作業長
課員