Document Reference: Compilation date:

September 2021

Title: Service and Maintenance of Revision: 01


ZPMC Container Cranes and Date:
KoneCranes RTG
Compiled by: Messanvi N. Next Review Date:
GUEDOU

Authorised By: Ahmed Fekry Authorisation Date:

Reviewed by Designation Reviewed


Paterson Simons at LCT

PSTL Crane Maintenance, Rev 01 Page 1 of 4


COND. FROM PREVIOUS PAGE

STS & RTG Bypass Procedure.

Process/Equipment: Service and Maintenance work. Location: Lomé Container Terminal


ZPMC Container Cranes and KoneCranes RTG
Procedure Developed by: PSTL Approved by: Date: September
2021
Referenced: -

Personal Protective Equipment Required (Check the box for required PPE)

X X X X X
ACTIVITY RESPONSIBLE PERSON CONTROLS
(Steps in the process/task) (What can be done to minimise the risk of injury & claims)

1. Check the crane to see if the failure can be Person in charge from PSTL: 1. Check if the problem can be solved in reasonable time without needing to
solved in max 15min Crane Supervisor do
a bypass, try to solve the problem.

2
COND. FROM PREVIOUS PAGE

2. Do a bypass if within 15min, the problem was Person in charge from PSTL 2. Go through the Possible consequences if something goes wrong after the
not solved Crane Supervisor Bypass (Risk Assessment)
3. Take the responsibility to bypass after making sure it will not endanger
human life and will not affect the integrity of the cranes
4. Ask the crane Operator to off the drive if it is not already done.
5. Disable the crane By pressing an e-stop near the working area.
6. Do the bypass ( Software and/or Hardware)
7. Remove the E-stop
3. Test of the crane 8. Reset all faults
9. Put on the drive From PLC room(STS)/E-room (RTG)
10. If everything went ok, off the drive and ask Operator to switch on the drive
11.Ask the Operator to Press his E-stop
12. Make sure The drive goes Off when the Operator presses his e-stop, this is
a MUST
13. Ask the Operator to put on back the drive
14. After 1-2 min, ask the Operator for the crane test functions in slowspeed
15. If ok, Ask the operator for a full speed functions test
16. If all ok, Inform LCT Operations and LCT engineers about the crane
availability
17. Record the Bypasses in the bypass file and send it at the end of the shift
18. Ensure that Shift leader on Duty and Crane Supervisor of the next shift are
aware of the bypasses
19. Fill in the crane request file with all necessary information to have
the cranes when available for the CMs and communicate it to the
Shift Leader & The Planning Engineer

NB:
The functions below and not limited to, should never be bypassed.
-Overtravel Switches
-The 3 Lines of an E-stop on STS or the 2 lines of an E-stop on RTG
-Slowdown Function
-Snag Load

3
COND. FROM PREVIOUS PAGE

-Overload

You might also like