Professional Documents
Culture Documents
DESIGN MANUAL
Chapter 3: Appendix 3A
6/30/00
CPDM APPENDIX 3A.2
FIGURE 1 - PAGE 1 OF 3
FUTURE
A MAJOR
PROCESS
PROCESS STEP
STEP
PAV'T........ Pavement
LCCA ........ Life-Cycle Cost Analysis
REHAB/RECONST ..... Rehabilitation/
Reconstruction
DECISION STEP ESL ........... Expected Service Life
DES.APP... Design Approval
PETSR ...... Pav't Evaluation & Treatment
Selection Report
DPM .......... Design Procedure Manual
SPM .......... Scoping Procedure Manual
TREAT ...... Treatment
OFF-PAGE
CONNECTOR 2
6/30/00
PAVEMENT PROCESS (SECTION 3.3.1) APPLICABILITY, CPDM APPENDIX 3A.2
MAJOR PROCESS REQUIREMENTS, AND MINIMUM FIGURE 1 - PAGE 2 OF 3
PAV'T PROCESS
NOT APPLICABLE. DOES
NO
FOLLOW DESIGN PROJECT CONTAIN > 1.5 km OF
PROCESS IN PAV'T REHAB/RECONST. OR
SPM&DPM & NYSDOT NEW PAV'T?
POLICY FOR ESL*
YES
YES
YES
NO
DOES IS PROJECT A
PROJECT CONSIST PAV'T REHAB?
MAINLY OF NEW PAV'T OR YES
SIGNIFICANT REALIGNMENT?
YES
5-8 8
NO Yrs. Yrs.
1) PAVEMENT EVALUATION
2) CHOOSE TREATMENT(S) FROM
VOLUME II (CPDM APP.5A)
3) PERFORM LCCA (IF REQ'D)
4) PREPARE PETSR & SELECT PREFERRED
TREATMENT WITH ESL 5 YEARS 2
OR > ESL PER POLICY*
NO (REHAB)
5 - 8 YEARS
OBTAIN DES.
APP. FOR
PREFERRED
TREATMENT /
PAVEMENT TYPE
CONTINUE WITH
ADVANCE
DETAIL DESIGN
PHASE OF
* These minimum service life DESIGN
requirements do not override existing PROCESS IN
NYSDOT minimum design life DPM
requirements (e.g., Bond Issue projects'
m in i m um 1 0 -y r. s er vi c e l i f e o r t he
anticipated service lives given in the
6/30/00
" De sign Traffi c Forecast P oli cy" in
Appendix "D" of the SPM). END
CPDM APPENDIX 3A.3
FIGURE 2 - PAGE 1 OF 3
PROJECT - LEVEL
PAVEMENT DESIGN PROCESS
(See Section 3.3.1.2 for Full Process Step Description & Guidance)
SECTION A MAJOR
3.3.1.2 PROCESS PAV'T........ Pavement
STEP # STEP
LCCA ........ Life-Cycle Cost Analysis
REHAB/RECONST ..... Rehabilitation/
Reconstruction
ESL ........... Expected Service Life
OUTPUT
DES.APP... Design Approval
PETSR ...... Pav't Evaluation & Treatment
Selection Report
DPM .......... Design Procedure Manual
SECTION SPM .......... Scoping Procedure Manual
3.3.1.2 DECISION
STEP # STEP TREAT ...... Treatment
FUTURE FUTURE
FUTURE
PROCESS
OUTPUT
PMS DATA 2
STEP BASE
OFF-PAGE
CONNECTOR
6/30/00
PROJECT - LEVEL PAVEMENT DESIGN PROCESS CPDM APPENDIX 3A.3
(See Section 3.3.1.2 for Full Process Step Description & Guidance) FIGURE 2 - PAGE 2 OF 3
TICKLER
3 PROJECT - LEVEL DISTRESS
PROGRAM FOR
SURVEY (CPDM CHAP. 2)
FUTURE WORK
INVENTORY OF DISTRESSES
PROJECT SCOPING STAGE
PROJECT - LEVEL
4 CHOOSE ALTERNATE PROJECT - PREDICTION MODEL
LEVEL TREATMENT(S)
(CPDM CHAP. 4 & 5)
STEPS COVERED BY CPDM SECTION 3.3.1
2 6/30/00
1 3
PROJECT - LEVEL PAVEMENT DESIGN PROCESS CPDM APPENDIX 3A.3
(See Section 3.3.1.2 for Full Process Step Description & Guidance) FIGURE 2 - PAGE 3 OF 3
11 REFINED
PRELIM DESIGN STAGE
YES
PAV'T QUAN./COST SIGNIFICANTLY DIFFERENT FROM
PREL. EST.?
NO
11 IF LOWER
STEPS COVERED BY CPDM SECTION 3.3.1
NO
16 REFINED YES
PAV'T QUAN./COST SIGNIFICANTLY
DIFFERENT FROM PREL.
EST.?
NO
IF
16 LOWER LEVEL YES
TREATMENT RECOMMENDED, IS IT > 2 YRS.
FROM COND. SURVEY TO
CONST. START?
ADD FINAL RECOMMENDED
NO
TREATMENT AND FUTURE
WORK REQUIRED TO PAVEMENT
17 PREPARE AND TRANSMIT P.S.&E. MANAGEMENT DATA BASE
CONSTRUCT PROJECT
DESIGN MANUAL
Chapter 3: Appendix 3B
6/30/00
COMPREHENSIVE PAVEMENT
DESIGN MANUAL
Chapter 3: Appendix 3C
Vacant /
(See EI 01-031) /
7/02/02