You are on page 1of 2

In-process Inspection Report for Infant Incubator Parts (2)

Part code C6512070 MIS No.


Part name Switch Bracket Machine No.
Material Name Material Lot No.
Company name Atomed Cebu Inc. Approval Name Hilario Aliñabon
Inspection item Appearance Inspection & Dimension Inspection
Inspection Standard
Dimension Standard Visual Standard
Color - Atom White 009 (Refer to Master Sample)
Gate Burr - -0.2mm ~ 0mm
Mold Lot No. - When molding, set mold lot dial on molding month
3
0.
Insert Nut Contamination: (Refer to Defect Dimension Guide for judgment)
Black mark / Stainmark - < 0.3mm2 (for level 1)
- < 0.5mm2 (for level 2 & 3)
±

7
3. Note: if distance is over 200mm then within limit - OK
if distance is under 200mm then sum is within limit - OK
10
=
B Silver Streak - refer to defect sample limit
Short mold - refer to defect sample limit
Shrinkage - refer to defect sample limit
Insert Nut Insert Nut Scratch - refer to defect sample limit
Crack / broken - No Good
A = 190 ± 0.5 Flow Mark - refer to defect sample limit
Note: Insert GO - NO GO jig on points encircled using required jig. Deformation - refer to defect sample limit
Discoloration - refer to defect sample limit
Measuring Equipment = Caliper Insert Nut: under insertion - No Good / Over insertion - < 0.5mm
Inspection Result
Dimension Inspection Result: (Sampling Qty. & Frequency = 3 pcs. every start-up then end-time)
Production Date/Start-up time: ________________ Production Date/End time: ________________
Dimension Go - No Go jig Insertion Dimension Go - No Go jig Insertion
n=3 Remarks Remarks
A B (OK / NG) A B (OK / NG)

1
2
3
Inspected by: ______________
Visual Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Productio
n Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Inspected by: ______________ Inspected by: ______________ Inspected by: ______________

Insert Nut Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Productio
n Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Inspected by: ______________ Inspected by: ______________ Inspected by: ______________
Lot
Date / Time Problem Action Taken Disposition Remarks
Affected

Checked by: /
Section Leader / Supervisor
ACI-QA-F-439-00 Effectivity date: November 06, 2012
In-process Inspection Report for Infant Incubator Parts (2)
Part code C6512070 MIS No.
Part name Switch Bracket Machine No.
Material Name Material Lot No.
Company name Atomed Cebu Inc. Approval Name Hilario Aliñabon
Inspection item Appearance Inspection & Dimension Inspection
Inspection Standard
Dimension Standard Visual Standard
Color - Atom White 009 (Refer to Master Sample)
Gate Burr - ≤ 0.2mm
Mold Lot No. - When molding, set mold lot dial on molding month
3
0.
Insert Nut Contamination: (Refer to Defect Dimension Guide for judgment)
Black mark / Stainmark - < 0.3mm2 (for level 1)
- < 0.5mm2 (for level 2 & 3)
±

7
3. Note: if distance is over 200mm then within limit - OK
if distance is under 200mm then sum is within limit - OK
10
=
B Silver Streak - refer to defect sample limit
Short mold - refer to defect sample limit
Shrinkage - refer to defect sample limit
Insert Nut Insert Nut Scratch - refer to defect sample limit
Crack / broken - No Good
A = 190 ± 0.5 Flow Mark - refer to defect sample limit
Note: Insert GO - NO GO jig on points encircled using required jig. Deformation - refer to defect sample limit
Measuring Equipment = Caliper Insert Nut: under insertion - No Good / Over insertion - < 0.5mm
Inspection Result
Dimension Inspection Result: (Sampling Qty. & Frequency = 3 pcs. every start-up then end-time)
Production Date/Start-up time: ________________ Production Date/End time: ________________
Dimension Go - No Go jig Insertion Dimension Go - No Go jig Insertion
n=3 Remarks Remarks
A B (OK / NG) A B (OK / NG)

1
2
3
Inspected by: ______________
Visual Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Productio
n Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Inspected by: ______________ Inspected by: ______________ Inspected by: ______________

Insert Nut Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Productio
n Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Inspected by: ______________ Inspected by: ______________ Inspected by: ______________
Lot
Date / Time Problem Action Taken Disposition Remarks
Affected

Checked by: /
Section Leader / Supervisor
ACI-QA-F-439-00 Effectivity date: November 06, 2012