Insert Nut Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Logo Printing Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Checked by: /
Section Leader / Supervisor
ACI-QA-F-444-00 Effectivity date: November 13, 2012
In-process Inspection Report for Infant Incubator Parts (5)
Part code C6513270 MIS No.
Part name Led Front Panel Machine No.
Material Name Material Lot No.
Company name Atomed Cebu Inc. Approval Name Hilario Aliñabon
Inspection item Appearance Inspection & Dimension Inspection
Inspection Standard
Dimension Standard Visual Standard
Color - Atom White 009 (Refer to Master Sample)
Gate Burr - - 0.2mm ~ 0mm
Mold Lot No. - When molding, set mold lot dial on molding month
Contamination: (Refer to Defect Dimension Guide for judgment)
Black mark / Stainmark - < 0.3mm2 (for level 1)
- < 0.5mm2 (for level 2 & 3)
Note: if distance is over 200mm then within limit - OK
B = 110 ± 0.3 if distance is under 200mm then sum is within limit - OK
Silver Streak - refer to defect sample limit
Short mold - refer to defect sample limit
Shrinkage - refer to defect sample limit
Scratch - refer to defect sample limit
Crack / broken - No Good
Flow Mark - refer to defect sample limit
Deformation - refer to defect sample limit
Discoloration - refer to defect sample limit
A = 178 ± 0.3
Logo print Color - Atom Green 003 (Refer to Master Sample)
Measuring Equipment = Caliper Insert Nut: under insertion - No Good / Over insertion - < 0.5mm
Inspection Result
Dimension Inspection Result: (Sampling Qty. & Frequency = 3 pcs. every start-up then end-time)
Production Date/Start-up time: ________________ Production Date/End time: ________________
Dimension Dimension
n=3 Remarks Remarks
A B A B
1
2
3
Inspected by: ______________
Visual Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Insert Nut Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Logo Printing Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Checked by: /
Section Leader / Supervisor
ACI-QA-F-444-00 Effectivity date: November 13, 2012
In-process Inspection Report for Infant Incubator Parts (7)
Part code C6511020 MIS No.
Part name X-Ray Cassette Door Machine No.
Material Name Material Lot No.
Company name Atomed Cebu Inc. Approval Name Hilario Aliñabon
Inspection item Appearance Inspection & Dimension Inspection
Inspection Standard
Dimension Standard Visual Standard
Color - Atom White 009 (Refer to Master Sample)
Gate Burr - ≤ 0.2mm
Mold Lot No. - When molding, set mold lot dial on molding month
A = 386 ± 0.3 Contamination: (Refer to Defect Dimension Guide for judgment)
Black mark / Stainmark - < 0.3mm2 (for level 1)
- < 0.5mm2 (for level 2 & 3)
Note: if distance is over 200mm then within limit - OK
if distance is under 200mm then sum is within limit - OK
Silver Streak - refer to defect sample limit
Short mold - refer to defect sample limit
Shrinkage - refer to defect sample limit
Scratch - refer to defect sample limit
Crack / broken - No Good
B = 41.0 ± 0.3 Flow Mark - refer to defect sample limit
Deformation - refer to defect sample limit
Logo print Color - Atom Green 003 (Refer to Master Sample)
Measuring Equipment = Caliper Insert Nut: under insertion - No Good / Over insertion - < 0.5mm
Inspection Result
Dimension Inspection Result: (Sampling Qty. & Frequency = 3 pcs. every start-up then end-time)
Production Date/Start-up time: ________________ Production Date/End time: ________________
Dimension Dimension
n=3 Remarks Remarks
A B A B
1
2
3
Inspected by: ______________ Inspected by: ______________
Visual Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
2-4
4-6
Insert Nut Inspection Result: (Sampling Qty & Frequency = 10 pcs. start-up then every 2 hours)
Production
Date
Lotting OK NG Remarks OK NG Remarks OK NG Remarks
6-8
8-10
10-12
12-2
N/A N/A N/A
2-4
4-6