The document outlines materials needed for constructing a warehouse, barracks, and motorpool/workshop area. It lists various building materials like cement, sand, gravel, pipes, windows, and doors. Many of the materials are still waiting to be purchased or delivered, with delivery dates ranging from mid-October to mid-November. The document also notes plans to use a 40-foot container van for the barracks and includes costs for delivery.
The document outlines materials needed for constructing a warehouse, barracks, and motorpool/workshop area. It lists various building materials like cement, sand, gravel, pipes, windows, and doors. Many of the materials are still waiting to be purchased or delivered, with delivery dates ranging from mid-October to mid-November. The document also notes plans to use a 40-foot container van for the barracks and includes costs for delivery.
The document outlines materials needed for constructing a warehouse, barracks, and motorpool/workshop area. It lists various building materials like cement, sand, gravel, pipes, windows, and doors. Many of the materials are still waiting to be purchased or delivered, with delivery dates ranging from mid-October to mid-November. The document also notes plans to use a 40-foot container van for the barracks and includes costs for delivery.
SCLD-MRF-003 - sqm) - 24pax 10 mm O d.b. x 6.0m std 33.00 pcs SCLD-MATS-007 25-Sep-23 10-Oct-23 -43 0.00% 33.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) 1-1/2" Dia. G.I. Pipe sch. 20 (warehouse Building 48.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 48.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) only) Welding Rod (check Brand and User) 5.00 kg 26-Sep-23 11-Oct-23 -42 0.00% 5.00 swivel clamp 73.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 73.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Portland cement 72.00 bag SCLD-MATS-006 26-Sep-23 11-Oct-23 72.00 15-Nov-23 -35 100.00% - Waiting for Delivery (PRIORITY) Fully Delivered Portland cement 8.00 bag SCLD-MATS-006 26-Sep-23 11-Oct-23 8.00 15-Nov-23 -35 100.00% - Waiting for Delivery (PRIORITY) Fully Delivered Portland cement 37.13 bag SCLD-MATS-006 26-Sep-23 11-Oct-23 37.00 15-Nov-23 -35 99.65% 0.13 Waiting for Delivery (PRIORITY) Fully Delivered River sand 8.00 cu.m 26-Sep-23 11-Oct-23 8.00 13-Nov-23 -33 100.00% - Still to Purchase Fully Delivered River sand 1.00 cu.m 26-Sep-23 11-Oct-23 1.00 13-Nov-23 -33 100.00% - Still to Purchase Fully Delivered River sand 2.05 cu.m 26-Sep-23 11-Oct-23 2.00 13-Nov-23 -33 97.56% 0.05 Still to Purchase Fully Delivered Gravel 15.00 cu.m 26-Sep-23 11-Oct-23 15.00 13-Nov-23 -33 100.00% - Still to Purchase Fully Delivered Gravel 4.10 cu.m 26-Sep-23 11-Oct-23 4.00 -42 97.56% 0.10 Still to Purchase Fully Delivered phenolic board formwork 13.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 13.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Phenolic Board 43.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 43.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) phenolic board formwork 3.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 3.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Assorted CWN 10.00 kg SCLD-MATS-006 26-Sep-23 11-Oct-23 -42 0.00% 10.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Assorted CWN 10.00 kg SCLD-MATS-006 26-Sep-23 11-Oct-23 -42 0.00% 10.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) CHB 4" 267.00 pcs SCLD-MATS-006 26-Sep-23 11-Oct-23 -42 0.00% 267.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) #16 G.I. tie wires 36.00 kg SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 36.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) corrugated g.i. sheet(12' x 0.90 x 0.5mm thk)wall 38.00 pcs 26-Sep-23 11-Oct-23 38.00 15-Nov-23 -35 100.00% - Still to Purchase Fully Delivered corrugated g.i. sheet(10' x 0.90 x 0.5mm thk)roof 9.00 pcs 26-Sep-23 11-Oct-23 9.00 15-Nov-23 -35 100.00% - Still to Purchase Fully Delivered tekscrew Screw (3")- for Roof 1,027.00 pcs SCLD-MATS-007 26-Sep-23 11-Oct-23 -42 0.00% 1,027.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) 1-1/2" Dia. G.I. Pipe sch. 20 (for Bed framing) 156.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 156.00 Still to Purchase Still to Purchase 0.70 x 1.80 m Lifetime Tables(by property) 1.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase chair(by property) 2.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 2.00 Still to Purchase Still to Purchase trash Bin(by property) 1.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase 2.15 x 0.80m Flush Door 2.00 set 26-Sep-23 11-Oct-23 -42 0.00% 2.00 Still to Purchase Still to Purchase 2.15 x 0.70m Plastic Door 2.00 set 26-Sep-23 11-Oct-23 -42 0.00% 2.00 Still to Purchase Still to Purchase 2.15 x 1.10m steel Door 1.00 set 26-Sep-23 11-Oct-23 1.00 13-Nov-23 -33 100.00% - Still to Purchase Fully Delivered 0.60 x 1.80 alum window 4.00 set 26-Sep-23 11-Oct-23 -42 0.00% 4.00 Still to Purchase Still to Purchase 0.40 x 0.60 alum window 2.00 set 26-Sep-23 11-Oct-23 -42 0.00% 2.00 Still to Purchase Still to Purchase 1.20 x 1.20 alum window 1.00 set 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase Epoxy Primer Gray(for Container van)- 195.84 sq.m 26-Sep-23 11-Oct-23 -42 0.00% 195.84 Still to Purchase Still to Purchase Exterior/Interior & ceiling Electric Fan(By property) 24.00 set 26-Sep-23 11-Oct-23 -42 0.00% 24.00 Still to Purchase Still to Purchase 40 Footer Container Van- Bare (for Barracks) - By SCLD-MRF-003A 2.00 units 26-Sep-23 11-Oct-23 0.00% 2.00 Jameda (including Delivery cost) 1.00 lot 26-Sep-23 11-Oct-23 -42 0.00% 1.00 SCLD-MRF-004 MOTORPOOL AND WORKSHOP AREA - Embankment / gravel fill base coarse 27.00 cu.m. 26-Sep-23 11-Oct-23 -42 0.00% 27.00 Still to Purchase Still to Purchase Reinforcing Steel Bars (10 MM X 6 M) 231.04 kgs. SCLD-MATS-010 26-Sep-23 11-Oct-23 -42 0.00% 231.04 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) 1-1/2" Dia. G.I. Pipe sch. 20 (warehouse Building 76.00 pcs SCLD-MATS-010 26-Sep-23 11-Oct-23 -42 0.00% 76.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) only) Welding Rod (check Brand and User) 20.00 kg 26-Sep-23 11-Oct-23 -42 0.00% 20.00 Still to Purchase Still to Purchase swivel clamp 59.00 PCS SCLD-MATS-010 26-Sep-23 11-Oct-23 -42 0.00% 59.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Portland cement 113.00 bag SCLD-MATS-009 26-Sep-23 11-Oct-23 113.00 15-Nov-23 -35 100.00% - Waiting for Delivery (PRIORITY) Fully Delivered Portland cement for Mortar 8.00 bag SCLD-MATS-009 26-Sep-23 11-Oct-23 8.00 15-Nov-23 -35 100.00% - Waiting for Delivery (PRIORITY) Fully Delivered Portland cement for Plaster 11.00 bag SCLD-MATS-009 26-Sep-23 11-Oct-23 11.00 15-Nov-23 -35 100.00% - Waiting for Delivery (PRIORITY) Fully Delivered River sand for Mortar 0.78 cu.m 26-Sep-23 11-Oct-23 -42 0.00% 0.78 Still to Purchase Still to Purchase River sand 8.00 cu.m 26-Sep-23 11-Oct-23 -42 0.00% 8.00 Still to Purchase Still to Purchase River sand for Plaster 0.86 cu.m 26-Sep-23 11-Oct-23 -42 0.00% 0.86 Still to Purchase Still to Purchase Gravel 15.00 cu.m 26-Sep-23 11-Oct-23 -42 0.00% 15.00 Still to Purchase Still to Purchase phenolic board formwork 4.00 pcs SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 4.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) Assorted CWN 5.00 kg SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 5.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) 4" CHB 224.00 pc SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 224.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) #16 G.I. tie wires 70.00 kg SCLD-MATS-010 26-Sep-23 11-Oct-23 -42 0.00% 70.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) corrugated g.i. sheet(8' x 0.90 x 0.5mm thk)roof 23.00 pcs SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 23.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) and Wall corrugated g.i. sheet(12' x 0.90 x 0.5mm thk)wall 37.00 pcs SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 37.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) corrugated g.i. sheet(10' x 0.90 x 0.5mm thk)roof 10.00 pcs SCLD-MATS-009 26-Sep-23 11-Oct-23 -42 0.00% 10.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) tekscrew Screw (3")- for Roof 1,050.00 pcs SCLD-MATS-010 26-Sep-23 11-Oct-23 -42 0.00% 1,050.00 Waiting for Delivery (PRIORITY) Waiting for Delivery (PRIORITY) 0.70 x 1.80 m Lifetime Tables(by property) 1.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase chair(by property) 2.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 2.00 Still to Purchase Still to Purchase trash Bin(by property) 1.00 pcs 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase Electric Fan(by property) 1.00 set 26-Sep-23 11-Oct-23 -42 0.00% 1.00 Still to Purchase Still to Purchase