You are on page 1of 2

BI-10-09561 : Berri Onshore Flow Lines & Tie-in (Detailed Design)

Comments & Response Log for Auto Recloser NMR


Action
S/N SA Org Title Date SA Comments RTCC Response Status Remarks
By

SA partially reviewed the attached specification and data sheet; the specification does not appear to be in full compliance with 33-SDMS-01. SA
1 Saudi Aramco Consulting Services Department (CSD) 10-Apr-23 Noted. Pease refer the enclosed "point wise compliance sheet" against 33-SDMS-01
recommends having the vendor to supply a line by line compliance statement with 33-SDMS-001.

Auto recloser shall be designed to meet the requirement of SEC 33-SDMS-01 standard. Adjustments and Settings and operation requirement
shall be in accordance with above standards and as a minimum it shall have the following performance:
1. The Auto Re-closer shall be capable of performing a sequence of four trips prior to lockout even when the line fault is so close to the station
that the station voltage is essentially zero at the instant of the trip.
Noted and confirmed. Auto Recloser is complying with the performance characteristics as commented by SA.
2. Means shall be provided to enable the Re-closer to trip for the first or second time under fast operation and for the second or third and
2 Saudi Aramco Consulting Services Department (CSD) 10-Apr-23 Moreover, AR will comply with the other requirements as stated on 33-SDMS-01 (e.g. components, operating -
fourth time under delayed openings. The total operations to lock out onphase trip shall be determined by a suitable device. Thus, the Re-closer
mechanism … etc.)
may lock out on all phase trip operations that reach the lock out setting. The selection of the number of fast trips shall be field adjustable.
3. If upon the first, second or third reclosing, normal conditions are restored on the line, the Re-closer shall automatically reset at adjustable
times and be ready for a complete new sequence of operations. Means shall be provided to lock out the Re-closer after one, two, three of four
reset trip operations. The selection of the reset time and the number of trip operations shall be through control unit

3 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Contractor shall submit Auto recloser ITP for review and approval and approved IFC drawings Auto Recloser specified under 9Com 6000016441 which is non inspectable, Hence, ITP not applicable -

4 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Control panel cabinet shall be weather proof and drain and breather fitting shall be provided Confirmed -

5 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Control panel battery life span shall not less than 5 years as per 33-SDMS-01 Confirmed. Comply with 33-SDMS-01 -

Item is non inspectable, Hence, all applicable test certificates as per 33-SDMS-01 will be shared along with Material RFI.
6 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 FAT test of auto recloser shall be done as per IEC-60437 ,ANSI -C37.60 and perform all test as mentioned in 33-SDMS -01 Also, please refer to the factory routine test performed as per International recloser standard, wholly covering clause
5.3 of 33-SDMS-01

Item is non inspectable, Hence, all applicable test certificates as per 33-SDMS-01 will be shared along with Material RFI.
7 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 SF6 gas tank gauge calibration to be done during routine test.
Also, please refer to the conformance certificate with test sheet for pressure gauge.

8 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Auto recloser fencing grounding connection shall be done with available grounding grid Noted -

9 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Auto recloser equipment grounding cable size minimum 25 sqmm shall be used Noted -

10 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Contractor shall perform SAT test routine test as per 33-SDMS section 5.3 with approved testing team Noted -

11 Saudi Aramco Project Inspection Department (SAPID) 16-May-23 Auto recloser shall be fitted with weather proof name plate and details shall be in English and Arabic Noted and complied -

Saudi Aramco Power System Engineering Department The offered material must comply with SA Std drawing AA-036142-018 for the Auto re-closure and the dwg CA903945 need to be updated AA-036142-018 is new drawing which was not shared earlier. However, the design has been prepared in accordance
12 17-May-23
(PSED) accordingly. with attached typical drawing (BA330136-002). Therefore, CA-903945 has been prepared accordingly.

Saudi Aramco Power System Engineering Department


13 17-May-23 Auto re-closure OHTL poles should have a fence surrounding it to avoid any unauthorized access to it. Noted
(PSED)
Saudi Aramco Power System Engineering Department As communicated on December 16, 2020, there is no communication or interface scope. However, provision for
14 17-May-23 SCADA interface need to be detailed out.
(PSED) inteface with third party system is considered for future purpose

The proposed and supplied relay(control) for our recloser is FTU-R200, which has long been supplied through after
Saudi Aramco Power System Engineering Department Protective relays types, makes and accessories shall be of the type specified within 16-SAMSS-504 and as per the SA approved 9C0MM list, SEC's past approval process, and now still being supplied.
15 17-May-23
(PSED) unless specified otherwise in the specification. This relay(FTU-R200) is fully covering all SEC's requirment in functional and operational. For your reference, we
enclosed FTU catalong.

June 07, 2015 COMMENTS RESPONSE LOG C = Closed


KBR-AMCDE GES+ QF 7.3.37 O = Open
1 of 2
A = Agreed
R = Resolved
BI-10-09561 : Berri Onshore Flow Lines & Tie-in (Detailed Design)
Comments & Response Log for Auto Recloser NMR
Action
S/N SA Org Title Date SA Comments RTCC Response Status Remarks
By

Saudi Aramco Power System Engineering Department


16 17-May-23 Please include the CT/VT sizing documents as part of the NMR submittal it is missing from NMR. Please refer to the enclosed CT catalg and VT drawing.
(PSED)

Saudi Aramco Power System Engineering Department


17 17-May-23 SPDP package including the Price Lists Of Special Tools Or Devices Required For Maintenance should be also included in the final NMR. Specific tool or device necessary for maintenance is not required for the proposed/supplied recloser
(PSED)

June 07, 2015 COMMENTS RESPONSE LOG C = Closed


KBR-AMCDE GES+ QF 7.3.37 O = Open
2 of 2
A = Agreed
R = Resolved

You might also like