Zamil” foe SlLete Ja Nie 4%
onreconmien ZAMIL OFFSHORE SERVICES COMPANY
OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION
AND COMISSIONING SUPPORT
(CONTRACT : 6600044802)
TOOL BOX TALK
Location: QMS OMAR Date: 27-NOV-2021
Start Time:06:30 AM ‘TBT Log No :TBQM-OMAR-COAT-093
Meeting Duration:30 Minutes Number of Attendees: 4
Topics Discussed:
e ACCEPTANCE CRITERIA OF FINISHED COATING FILM
e SAES-H-004, PARA-9.1.5.
PARTICIPANTS
‘Sh Zamil Emp. | Arameo ID / | Name of Attendee | Position Signature al
no, |# Tosa |
1 |e | anstas1 | awronsomo.on | ween Fonean
2 | sumcon | evoass | anova — | arpucnron
2 |__| _easeoss | nasaomoxsao | avrucaronausten] Pew P|
1
3 |
€
__ _ |
7
7 ;
QC Inspector QC Supervisor
SARMAD AZEEM Ns FRANCIS BINUYA.
= COATING. pln ATING
Signature: VV a 2
‘TBT Log No: TBQM-OMAR-COAT-093 Page 1e ACCEPTANCE CRITERIA OF FINISHED COATING FILM as
Per SAES-H-004, PARA-9.1.5.
The finished coating film shall have the following minimum
mandatory characteristics
1. The dry film thickness (DFT) shall be within the minimum
and maximum limits per the applicable APCS. The dry film
thickness shall be checked in accordance with SSPC-PA2.
2. The dry film shall be free of any application related defects
such as but not limited to runs, sags, drips, dry spray or
foreign matter.
3. The dry film shall have a uniform appearance.
Adhesion strength of all coating systems shall not be less
than that required in the appropriate Saudi Aramco
Materials System Specification.
. Areas with blisters, cracks, porous or below minimum dry
film thickness shall be repaired.
-
uw
NN
‘TBT Log No: TBQM-OMAR-COAT-093 Page 2