You are on page 1of 2
Zamilf *22 4) Slat a (ol ie 3b _dweecosmio ZAMIL OFFSHORE SERVICES COMPANY ~ OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 20"-FEB-2028 Start Time:18:00 PM TBT Log No :TBQM-OMAR-COAT-135 Meeting Duration:30 Minutes Number of Attendees: 4 Topics Discussed: * General Handling Requirements SAES-H-200 Para 5.1. PARTICIPANTS, SL] Zamil Emp. [Aramco 1D 7] Name of Ntendee | Position No, | # IQAMA 1 [2 [eos [assis [raronso mois | wees ronan tp 2 | 6010 asasai¢ | nove. aus: | aPpuicaron Prelyku— 3 63209 2456955 | RASAD MOKSAD BLASTER/ PAINTER QC Inspector : QC Supervisor Name MUHAMMAD RIZWAN Name FRANCIS BINUYA Discipline : ING Discipline Signature: Signature TBT Log No: TBQM- OMAR-COAT-135, Page 1 * General Handling Requirements SAES-H-200 Para 5.1. . 1. The coated pipe shall be handled at all times in a manner that prevents damage to the pipe walls, beveled ends, and to the applied coatings (including internal coatings, if applied). End caps shall be used to prevent sand, water, and other contaminants in getting in contact with the internal coating of the pipes that can lead to coating damage and/or corrosion during field storage in accordance with SAES-L-450. End seal tapes shall be used to keep the end caps in place and to protect the cut-back from corrosion and surrounding contaminants as per SAES-H-200 Para 5.1.1. 2. All equipment, including field bending machines and pipe cradles, that contact the coated surface of the pipe shall be padded. Slings shall be nylon or equivalent; steel cables shall not be used as per SAES-H-200 Para 5.1.2. . Coated pipes shall not be rolled or dragged on the ground. Coated pipes shall be protected by wrapping polyethylene strings near the pipe ends as per SAES-H-200 Para 5.1.3. 4, Bevel protectors, when used, shall be firmly attached to the pipe as per SAES-H-200 Para 5.1.4. . For lifting operations, when a hook is used for handling large diameter pipes, the hook shall be of sufficient width and depth to fit inside the pipe and shalll be padded or covered with rubber as per SAES-H-200 Para 5.1.5. ‘TBT Log No: TBQM- OMAI Page 2

You might also like