Zamilf *22 4) Slat a (ol ie 3b
_dweecosmio ZAMIL OFFSHORE SERVICES COMPANY
~ OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION
AND COMISSIONING SUPPORT
(CONTRACT : 6600044802)
TOOL BOX TALK
Location: QMS OMAR Date: 20"-FEB-2028
Start Time:18:00 PM TBT Log No :TBQM-OMAR-COAT-135
Meeting Duration:30 Minutes Number of Attendees: 4
Topics Discussed:
* General Handling Requirements SAES-H-200 Para 5.1.
PARTICIPANTS,
SL] Zamil Emp. [Aramco 1D 7] Name of Ntendee | Position
No, | # IQAMA 1
[2 [eos [assis [raronso mois | wees ronan tp
2 | 6010 asasai¢ | nove. aus: | aPpuicaron Prelyku—
3 63209 2456955 | RASAD MOKSAD BLASTER/ PAINTER
QC Inspector : QC Supervisor
Name MUHAMMAD RIZWAN Name FRANCIS BINUYA
Discipline : ING Discipline
Signature: Signature
TBT Log No: TBQM- OMAR-COAT-135, Page 1* General Handling Requirements SAES-H-200 Para 5.1. .
1. The coated pipe shall be handled at all times in a manner
that prevents damage to the pipe walls, beveled ends, and
to the applied coatings (including internal coatings, if
applied). End caps shall be used to prevent sand, water,
and other contaminants in getting in contact with the
internal coating of the pipes that can lead to coating
damage and/or corrosion during field storage in
accordance with SAES-L-450. End seal tapes shall be used
to keep the end caps in place and to protect the cut-back
from corrosion and surrounding contaminants as per
SAES-H-200 Para 5.1.1.
2. All equipment, including field bending machines and pipe
cradles, that contact the coated surface of the pipe shall be
padded. Slings shall be nylon or equivalent; steel cables
shall not be used as per SAES-H-200 Para 5.1.2.
. Coated pipes shall not be rolled or dragged on the ground.
Coated pipes shall be protected by wrapping polyethylene
strings near the pipe ends as per SAES-H-200 Para 5.1.3.
4, Bevel protectors, when used, shall be firmly attached to
the pipe as per SAES-H-200 Para 5.1.4.
. For lifting operations, when a hook is used for handling
large diameter pipes, the hook shall be of sufficient width
and depth to fit inside the pipe and shalll be padded or
covered with rubber as per SAES-H-200 Para 5.1.5.
‘TBT Log No: TBQM- OMAI Page 2