Zamilf 422) Glee Jolie kb
cwrercomees ZAMIL OFFSHORE SERVICES COMPANY
OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION
‘AND COMISSIONING SUPPORT
(CONTRACT : 6600044802)
TOOL BOX TALK
Location: QMS OMAR Date: 02% MAR-2022
Start Time:18:00 PM BT Log No :TBQM-OMAR-COAT-141
Meeting Duration:s0 Minutes Number of Attendees: 4
Topics Discussed:
* APCS 19C application SAES-H-004 Para 9.4.6.
PARTICIPANTS
S| Zam Ep Name of Auendee | Posifon Signature
No. |i
1 | eis sasti31 | ALronsomoloW | Mech Foreman | KAS
2 oss | 9586214 | RopELMAUKs! | APPLICATOR Pont hee
3 | 63209 swsooss | nasaDmorsad | tasten/eanren | [J _
3
L4 | - es
5
ee eo —
[a
3
9
QC Inspector : QC Supervisor
Name MUHAMMAD RIZWAN Name FRANCIS BINUYA
Discipline ene Discipline
Signature: = Signature:
‘TBT Log No: TRQM- OMAR-COAT-141 Paget*. APCS 19C application SAES-H-004 Para 9.4.6.
1. Thick film Coatings (greater than 500 microns DFT) for
Immersion Services
2. Mixing the catalyst with coating shall be carried out
according to Saudi Aramco approved data sheets in SAES-
H-002V/SAES-H-101V using power operated slow stirrer
to prevent air ingress to the mixed coating material
Partial mixing catalyst with coating is prohibited. For small
areas, coating manufacturers shall supply smaller quantity
containers with their measured catalyst for one time
mixing.
3. Alll edges, cavities, bolts and nuts, nozzles, and any
inaccessible areas shall be stripe coated before the spray
coating application .
4. Coating shall be applied in a single coat “Wet-On-Wet”
method to achieve the required film thickness. Only airless
spraying equipment with high pump ratios (45:1 or higher)
shalll be used .
5. High voltage dry spark holiday detector shall be used to
locate pinholes and coating film discontinuities after the
full coating system on immersed or splash zone areas is
cured
Sel
‘TBT Log No: TBQM- OMAR-COAT-141._ Page 2