You are on page 1of 2
Zamilf 422) Glee Jolie kb cwrercomees ZAMIL OFFSHORE SERVICES COMPANY OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION ‘AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 02% MAR-2022 Start Time:18:00 PM BT Log No :TBQM-OMAR-COAT-141 Meeting Duration:s0 Minutes Number of Attendees: 4 Topics Discussed: * APCS 19C application SAES-H-004 Para 9.4.6. PARTICIPANTS S| Zam Ep Name of Auendee | Posifon Signature No. |i 1 | eis sasti31 | ALronsomoloW | Mech Foreman | KAS 2 oss | 9586214 | RopELMAUKs! | APPLICATOR Pont hee 3 | 63209 swsooss | nasaDmorsad | tasten/eanren | [J _ 3 L4 | - es 5 ee eo — [a 3 9 QC Inspector : QC Supervisor Name MUHAMMAD RIZWAN Name FRANCIS BINUYA Discipline ene Discipline Signature: = Signature: ‘TBT Log No: TRQM- OMAR-COAT-141 Paget *. APCS 19C application SAES-H-004 Para 9.4.6. 1. Thick film Coatings (greater than 500 microns DFT) for Immersion Services 2. Mixing the catalyst with coating shall be carried out according to Saudi Aramco approved data sheets in SAES- H-002V/SAES-H-101V using power operated slow stirrer to prevent air ingress to the mixed coating material Partial mixing catalyst with coating is prohibited. For small areas, coating manufacturers shall supply smaller quantity containers with their measured catalyst for one time mixing. 3. Alll edges, cavities, bolts and nuts, nozzles, and any inaccessible areas shall be stripe coated before the spray coating application . 4. Coating shall be applied in a single coat “Wet-On-Wet” method to achieve the required film thickness. Only airless spraying equipment with high pump ratios (45:1 or higher) shalll be used . 5. High voltage dry spark holiday detector shall be used to locate pinholes and coating film discontinuities after the full coating system on immersed or splash zone areas is cured Sel ‘TBT Log No: TBQM- OMAR-COAT-141._ Page 2

You might also like