You are on page 1of 2
Zamily ey) GLa Ll ihe concn ZAMUL OFFSHORE SERVICES COMPANY OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 13-JAN-2022 Start Time:06:30 AM ‘TB Log No :TBQM-OMAR-COAT-114 Meeting Duration:30 Minutes Number of Attendees: 4 sussed: * COATING REPAIR REQUIREMENTS AS PER SAES-H-004. To, PARTICIPANTS Zasnil Emp. Aramco 157 Name of Avtendes | Posion | Signacare # IQAMA 1 lagtq |wezees |c-Pactar” | wen roreman 2 | suecon | 22ast03575 | pain Miah Pea Gn ~ ‘APPLICATOR 3 | suecon |puyyes245| sempre —_| musta QC Inspector : QC Supervisor Name: UMER SAEED KHAN Name FRANCIS BINUYA Discipline: COATIYG Disciaine: (COATING Signature: Signatures > a ide * [2 -STANH EZ. tn Pagel ¢ COATING REPAIR REQUIREMENTS AS PER SAES-H-004. Cover all coated areas near to the defective area before commence repair or patching up. Use heavy duty textile or fabric adhesive tape AS PER SAES-H-004 Para 9.5.1. For areas less than 0.1 m?, grind to a rough metal surface using at least an 80 grit disc sander. Alternatively, spot blast or power tool cleaning to bare steel. Feather edge of coating at least 25 mm beyond bare metal AS PER SAES-H-004 Para 9.5.2. For areas greater than 0.1 m?, blast clean to obtain the metal surface pretreatment originally specified. Feather edge of coating at least 25 mm beyond bare metal AS PER SAES-H-004 Para 9.5.3. Dust and debris shall be removed from the substrate prior to coating application AS PER SAES-H-004 Para 9.5.5. Apply coating by brush for areas less than 0.1 m? and by spray for areas greater than 0.1 m? to the original specification except that the first coat of a multi-coat system shall be thinned as recommended in the product data sheet (SAES-H-002V/SAES-H-101V) AS PER SAES-H-004 Para 9.5.5. ‘TBT Log No: TBQM- OMAR-COAT-114 Page 2

You might also like