You are on page 1of 2
Zam 2) Sl Jl ee comacomeer ZAMIL OFFSHORE SERVICES COMPANY _ OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 14-MAR-2022 Start Time: 07:00 AM ‘TBT Log No :TBQM-OMAR-COAT-148 Meeting Duration:30 Minutes Number of Attendees: 3 Topics Discussed: + TECHNICAL DATA SHEET OF TOP COAT APCS-19C, SAES-H-101V. PARTICIPANTS [x ‘Aramco 1D / | Name of Attendee | Position ‘Signature te ToaMa ee ee ec onan 2 | suecon | 22esi08575 | im man MRATOR 3 | suscon | ascaaszes | man senON 3 6 [8 — { — 9 | QC Inspector: QC Supervisor Name UMER SAEED KHAN Name FRANCIS BINUYA Discipline: COATING, Discipline TATING — Signature: y Signatur : oo Jy Mat 22 Page 1 © TECHNICAL DATA SHEET OF TOP COAT APCS-19C, SAES-H-101V. Hempadur Multi-Strength GF 35870 Shelf life, sheltered storage @ 35°C maximum: 2 years No. of Components: 2 2.1.1 Base: 35879 2.1.2 Hardener (Curing Agent): 98870 Thinner: Hempel’s 08450 Minimum-Maximum Thinning Requirements: up to 5% by Volume Pot Life : 1 hours @ 20°C 5°C to 50°C 50%; Max = 75% Minimum-Maximum Allowable Substrate Ter Minimum-Maximum Allowable Relative Hu Typical Wet Film Thickness per Coat: 875 um Typical Dry Film Thickness per Coat: 750 um. Airless (A/L) Spray: Tip Range 23 to 27 thou. Fluid pressure: 3625psi Conventional Spray: NO. Brush: For stripe coating / touch-up only Cae er eRe reer ‘TBT Log No: TBQM-OMAR-COAT-148 Page 2 {

You might also like