You are on page 1of 2
Zamily 42) Shes Jolie comncnwen ZAMIL OFFSHORE SERVICES COMPANY OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION — AND COMISSIONING SUPPORT (CONTRACT : 6600044802) ‘TOOL BOX TALK Location: QMS OMAR. Date: 08"-MAR-2022 Start Time:18:00 PM ‘TBT Log No :TBQM-OMAR-COAT-145 Meeting Duration:s0 Minutes Number of Attendees: + Topics Discussed: * Clean the substrate after abrasive blasting SAES-H-004 Para 8.4. PARTICIPANTS [S| Zamil Emp. | Arameo ID 7 | Name of Avendse | Postion Tignature me | fama 1 | aos | asist [aromowowow | vec rowan LofodG 2 | toswe | ssesere[nooecwninsn | aroucaron | ony a 3 | ese | e2ae77[wmmwannsia [ausraroanien] (addy i 5 r + | 7 i 7 | — QC inspector: Qc Supervisor ‘Name MUHAMMAD RIZWAN Name UYA Disciptin coay Discipline Signature: Signatui Cr ‘TAT Log No: TEQM- OMAR-COAT-145, Page 1 * Clean the substrate after abrasive blasting SAES-H-004 Para 8.4. 1, Spent abrasive shall be removed from the cleaned surfaces by dry brushing and/or blowing down or vacuum cleaning with clean, dry compressed air. Internal surfaces shall be dry brushed and vacuum cleaned. After cleaned surface, residual dust level shall be checked and dust rating shall be level 2 or better in accordance with ISO 8502-3 as per SAES-H-004 Para 8.4.1. 2. Cleaned surfaces shall be primed or coated before the surface condition degrades below the specified cleanliness level requirement as per SAES-H-004 Para 8.4.2. 3. After blasting, test the substrate for the chloride content. Residual chloride shall not exceed 40 mg/m? for external and 20 mg/m? for internal coating. Wash down the surface with sweet water to remove chloride contamination. Chloride test shall follow the water wash down until the correct value is achieved in accordance with ISO 8502-6 as per SAES-H-004 Para 8.4.3. 4. Abrasive blast cleaned surfaces shall be re-inspected prior to priming or coating if the surfaces are held for more than 4 hours after blasting. Correction shalll be done and retested before coating application as per SAES-H-004 Para 8.4.4. 5. Abrasive blasting residue shall be cleaned up regularly at the area other than those being blasted as per SAES-H-004 Para 8.4.5. IT Log No: TBQM- OMAR-COAT-145 Page 2

You might also like