TOOL BOX TALK
Location: QMS OMAR Date: 22-JAN-2022
Start Time:06:30 AM TBT Log No :TBQM-OMAR-COAT-119
Meeting Duration:30 Minutes Number of Attendees: 4
Topics Discussed:
* BARRICATION & NDT REQUIREMENTS AS PER GENERAL
INSTRUCTION MANUAL (G.1 6.021).
PARTICIPANTS:
‘SL [Zamil Emp. | Aramco ID 7 | Name of Attendee | Position | Signature ]
no. | # JQAMA
1 61309 8862285 | c.pASLON _| Mech. FOREMAN
2 | sus-con | 2245103375 | patim mish aneren
3 | suscow | zecazos295 | man aa
A
5
6
8
9
QC Inspector QC Supervisor
Name : UMER SAEED KHAN Name : FRANCIS BINUYA
Discipine= COATING we Duis: (COATING
signature: BE sioner
re
‘TBT LogNo: TBQM- OMAR-COAT-119 Paget* BARRICATION & NDT REQUIREMENTS AS PER GENERAL
INSTRUCTION MANUAL (G.1 6.021).
Areas where abrasive blasting is in progress shall be barricaded to
keep unauthorized personnel out of the hazardous area.
Warning signs shall be posted at the hazardous areas with suitable
warnings of the potential dangers (e.g., "No Entry-Abrasive Blasting
in Progress").
Signs shall be provided in Arabic and English, as well as the
languages of the contractor’s workforce.
Before abrasive blasting any in-service equipment (piping, tanks,
vessels, etc.), ensure that non-destructive testing has been carried out
or other methods used to determine that the equipment wall thickness
is adequate for abrasive blasting.