You are on page 1of 2
ZamiP 42-2!) Slate Jl iia 4 orwowconnnon ZAMIL OFFSHORE SERVICES COMPANY ‘OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 22-JAN-2022 Start Time:06:30 AM TBT Log No :TBQM-OMAR-COAT-119 Meeting Duration:30 Minutes Number of Attendees: 4 Topics Discussed: * BARRICATION & NDT REQUIREMENTS AS PER GENERAL INSTRUCTION MANUAL (G.1 6.021). PARTICIPANTS: ‘SL [Zamil Emp. | Aramco ID 7 | Name of Attendee | Position | Signature ] no. | # JQAMA 1 61309 8862285 | c.pASLON _| Mech. FOREMAN 2 | sus-con | 2245103375 | patim mish aneren 3 | suscow | zecazos295 | man aa A 5 6 8 9 QC Inspector QC Supervisor Name : UMER SAEED KHAN Name : FRANCIS BINUYA Discipine= COATING we Duis: (COATING signature: BE sioner re ‘TBT LogNo: TBQM- OMAR-COAT-119 Paget * BARRICATION & NDT REQUIREMENTS AS PER GENERAL INSTRUCTION MANUAL (G.1 6.021). Areas where abrasive blasting is in progress shall be barricaded to keep unauthorized personnel out of the hazardous area. Warning signs shall be posted at the hazardous areas with suitable warnings of the potential dangers (e.g., "No Entry-Abrasive Blasting in Progress"). Signs shall be provided in Arabic and English, as well as the languages of the contractor’s workforce. Before abrasive blasting any in-service equipment (piping, tanks, vessels, etc.), ensure that non-destructive testing has been carried out or other methods used to determine that the equipment wall thickness is adequate for abrasive blasting. TBT Log No: T8QM- OMAl Page 2

You might also like