You are on page 1of 2
Zamil? 2-2)! Glee fo Lee cxovcusves ZAMIL OFFSHORE SERVICES COMPANY OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 19%-MAR-2022 Start Time:18:00 PM ‘TBT Log No :TBQM-OMAR-COAT-151 Meeting Duration:30 Minutes Number of Attendees: + © Requirements before abrasive blasting SAES-H-004 Para 8.3. PARTICIPANTS S| Zamilimp. [Aramco 1D 7 | Name af Avvendee | Posiion ~~] Sigmatare No. | # TQAMA | x | 62015 AWFONSO MOLOIN | Mech, FOREMAN pa 2 | 60e06 sacar | RODELMALKS! | APPLICATOR pl [3 sasis | aszas77 | mairhun onimsHa | BLASTER /PAINTER 5 [ 6 | 7 | 2 — a Ty | QC inspecto! QC Supervisor Name MUHAMMAD RIZWAN Name FRANCIS BINUYA Disentine: COATING, Discitine: _[COATING~ foo Signature: Signatur RS [9 ~ Meio 022 een Caer re ‘TBT Log No: TBQM- OMAR-COAT-151 Pagel ® Requirements before abrasive blasting SAES-H-004 Para 8.3. 1. The substrate shall not contain oil, grease or lubricant as, per SAES-H-004 Para 8.3.1 2. Prior to blasting, rough welds and sharp edges shall be ground to a minimum radius not less than 3 mm to ensure proper coating application as per SAES-H-004 Para 8.3.2. 3. Abrasive blasting shall be carried out only when the steel surface is at least 3°C above the Dew Point as per SAES- H-004 Para 8.3.3 4. Nearby surfaces other than those being blasted shall be protected from damage due to abrasive blasting operations. (Such as MOV motor or actuator, instrument gauges and swivel joints at flange or loading arm) as per SAES-H-004 Para 8.3.4. 5. Cover all coated areas near to the defective area before commence repair or patching up. Use heavy duty textile or fabric adhesive tape as per SAES-H-004 Para 8.3.5.

You might also like