You are on page 1of 2
Zamilf te) Sle SL Jal Le onsencorsncien ZAMIL OFFSHORE SERVICES COMPANY _ OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT (CONTRACT : 6600044802) TOOL BOX TALK Location: QMS OMAR Date: 13"-MAR-2029 Start Time: 00 PM ‘TBT Log No :TBQM-OMAR-COAT-147 Meeting Duration:30 Minutes Number of Attendees: 4 Topics Discussed: © Ambient Conditions SAES-H-004 Para 6.1. PARTICIPANTS Aramco D7 | Name of Attendee | Position — Tignatare TgaMa | fasi131 | auronso motoin | Mech. FOREMAN en sssczia | RODELMaLicsi | APPLICATOR abe: aszas77 | wimaunaniasta | atasren/eamren | (jy — QC Inspector : QC Supervisor Name MUHAMMAD RIZWAN Name FRANCIS BINUYA Log No: TSQM- OMAR-COAT-147 7 Pagel ¢ Ambient Conditions SAES-H-004 Para 6.1. 1. Blasting and coating shall not be performed if one or more of the following conditions exist unless the paint is specifically formulated for the adverse condition (except in case novel technology applied) as per SAES- H-004 Para 6.1.1. The substrate temperature is less than 10°C or more than the temperature limit given in the applicable Saudi Aramco Data Sheet as per SAES-H-004 Para 6.111. “ The substrate temperature is less than 3°C above the dew point as per SAES-H-004 Para 6.1.1.2. The relative humidity is measured above 85%as per SAES-H-004 Para 6.1.1.3. . Wind is strong enough to blow sand, salt spray, or other foreign matter onto the surface being painted as per SAES-H-004 Para 6.1.1.5. Wind is strong enough to cause dry spray or to otherwise seriously disturb the spray pattern when application is by spray gun s per SAES-H-004 Para 6.1.1.6. bet wv 2 2 TBT Log No: TBQM- OMAR-COAT-147, Page 2

You might also like